An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.

Slides:



Advertisements
Similar presentations
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Advertisements

Best Practices for Remote Assembly and Maintenance Keith Kershaw, Sources, Targets and Interactions Group Thanks to: Alessandro Tesini and Jim Palmer of.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Yoro TALL Santiago de Compostela (Spain) June 7 – 10, Second IP EUROTRANS Internal Training Course on Nuclear Data for Transmutation: status, needs.
TS/CV/DC CFD Team CFD Simulation of a Fire in CERN Globe of Science and Innovation Sara C. Eicher CERN, CH.
MEDICIS : status, plans, interlocks and coactivity with ISOLDE ISOLDE ISCC 13 February 2015 Stefano Marzari EN-STI-RBS.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.
The ISOLDE robots upgrade JL GRENARD EN-HE ISOLDE Workshop and Users meeting
Collimation Remote Handling Highlights from work for collimation remote handling and remote survey. Plans Keith Kershaw EN-HE 14 June 2011.
Remote Handling design progress for the Collimation Upgrade project Keith Kershaw EN-HE 6 June 2011.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
All logos in this presentation is courtesy of the Florida Institute of Technology Robotics and Spatial Systems Laboratory and the Florida Tech University.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Robotic Interventions: the perspective of the user R. Losito, EN/STI, Remote Manipulations Workshop 6 May 2013.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Y. Romanets 1, R. Luis 1,J. Bermudez 3, J.C. David 5, D. Ene 5, I. F. Goncalves 1, Y. Kadi 2, C. Kharoua 2, F. Negoita 4, R. Rocca 2, L. Tecchio 3, P.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Update on the Laser Beam Line
HIE-ISOLDE Design Study Richard Catherall EN-STI-RBS ISOLDE Workshop and Users Meeting th – 27 th November 2013.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Status of the Design Study Richard Catherall EN-STI-RBS.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
LBNE Remote Handling Conceptual Design Issues for ORNL Collaboration Kick-off Meeting at ORNL 1/6/2010.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Task # 3 Task # kW Target Station Layout proposal Presented by L.Bruno CERN AB Experimental Areas, Targets and Secondary Beams Group.
The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford.
Status of the FAIR pbar target: Target handling study (M. Helmecke)
Paul Scherrer Institut 5232 Villigen PSI EURISOL/BENE_2007, PSI /GF34 Joint High Power Target Meeting EURISOL/BENE , CERN Direct target irradiation.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
A summary of the SPES Safety Technical Advisory Committee SSTAC Richard Catherall ISOLDE Technical Coordinator 5 th December 2014 INFN, Legnaro.
Handling Discussions LAGUNA-LBNO/Layout Study Group - Friday 19/7/2013 Keith Kershaw EN-HE.
CERN-MEDICIS: Production d’isotopes selon l’approche « ISOLDE » pour la recherche médicale Thierry Stora EN-STI EN-GMS 5 th March 2013.
PAD-MAD requirements for Access in ISOLDE target area
I. Bergevoet - Training preparation
Safety and Prevention of Typical Fire Plan
MEDICIS Safety Alarms Systems
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
From Accelerators Physics to Nuclear Medicine
A Novel Passive Adhesion Principle and Application for an Inspired Climbing Caterpillar Robot H. Zhang, W. Wang J.
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
ISOLDE Front-End design review – Details of previous faults
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Presentation transcript:

An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard Matteo Vagnoni, Yury Gavrikov, Vincent Barozier Thanks to: ISOLDE / MEDICIS teams The 6th High Power Targetry Workshop hosted by the Rutherford Appleton Laboratory 11-15 April 2016

MEDICIS Integrated Target Remote Handling System Keith Kershaw CONTENTS Introduction ISOLDE MEDICIS Target handling robots Target shuttle transfer system Automated shielding doors and air locks Conclusions MEDICIS Integrated Target Remote Handling System Keith Kershaw

ISOLDE isotope production method spallation fragmentation fission 1.4 GeV protons ISOLDE Target Mass separation FLUKA simulation MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw What will MEDICIS do? Produce a wide range of made-to-order isotopes for hospital research labs Research into use of isotopes for therapy and diagnostics MEDICIS will use leftover “waste” protons from ISOLDE MEDICIS must not interfere with ISOLDE operation Symbiotic relationship – as we will see… MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw MEDICIS will use ISOLDE waste protons 90 % of proton beam passes through ISOLDE target into beam dump Need to be able to remotely position MEDICIS targets here Then remotely move them to a mass separator for collection of isotopes; Then store them. MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw Objects to be handled MEDICIS target (~10 kg) and ISOLDE target (~30 kg) Radiation levels during proton pulse 2 minutes after irradiation MEDICIS Integrated Target Remote Handling System Keith Kershaw

Early ideas and tests for target transfers Large scale model train system None of these were used in the end! Autonomous vehicle Pneumatic “rabbit” system MEDICIS Integrated Target Remote Handling System Keith Kershaw

ISOLDE and MEDICIS Facilities MEDICIS Integrated Target Remote Handling System Keith Kershaw

Facility layout Existing ISOLDE lab + target buildings+robots Protons from PS booster Existing ISOLDE lab + target buildings+robots Extension for MEDICIS and storage ISOLDE and MEDICIS irradiation points MEDICIS laboratory Target shuttle transfers Target handling in Medicis MEDICIS hot cell MEDICIS mass separator MEDICIS chemical lab Radioactive target storage Additional shielding New nuclear ventilation Fire / ventilation doors

MEDICIS Integrated Target Remote Handling System Keith Kershaw ISOLDE Target Robots Risk and failure analyses Electronics removed Cables replaced Safe robot technology means no additional sensors in target area (beam pipe!) 20 year old ISOLDE target handling robots replaced two years ago. New robots suspended from ceiling for better access MEDICIS will use the same type Kuka robots during installation in ISOLDE MEDICIS Integrated Target Remote Handling System Keith Kershaw

ISOLDE robot testing and operation Full mock-up testing of the system including recovery methods New gripper design to give more possibilities of remote recovery “Collision” detection Operational experience has led to improved controls – MEDICIS will benefit from this MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw Target shuttle transfer system Main exchange station Shuttle for Medicis Shuttle for Isolde Shuttle for Rescue & inspection Irradiation point for Medicis Exchange point for Isolde Decay point for Medicis Fire door Ventilation doors MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw Monorail shuttle system Based on industrial product (Montrac) Main constraints: Radiation tolerant Reliable – proven Simple remote control Fail safe Recovery possible (redundant locomotive + redundant power rails) Mock up tests with DC motors MEDICIS Integrated Target Remote Handling System Keith Kershaw

Shuttle monorail – ISOLDE + chicane MEDICIS Integrated Target Remote Handling System Keith Kershaw

Monorail positioning MEDICIS target in ISOLDE proton beam MEDICIS Target (on right) in position before locomotive disconnects MEDICIS Target will be outside faraday cage MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw Ventilation air lock between ISOLDE and MEDICIS allowing target shuttle passage MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw Fluka simulation for design of MEDICIS shielding and shielding doors During robot transfer On the mass separator MEDICIS Integrated Target Remote Handling System Keith Kershaw

Automated shielding doors in front of storage shelves MEDICIS Target storage area – same principle Robot + rail ISOLDE Target area shielded doors Pneumatically operated MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw Automated shielding hatch for robot arm to install target on mass separator front end MEDICIS Integrated Target Remote Handling System Keith Kershaw

As-Built: Automated shielding doors + robot + hatch Shielding doors around robot rail open to let whole robot pass Shielded hatch opens for robot arm to install target MEDICIS Integrated Target Remote Handling System Keith Kershaw

As built: Ventilation airlock and monorail Track switching points to simplify fire door seal Door seals around monorail MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw Medicis Schedule Work has to fit in with ISOLDE scheduled shutdowns Civil engineering started Sept 2013 (CERN long shutdown) Work inside ISOLDE during 2015/16 shutdown complete Work in Medicis continues for 2017 start up Civil Engineering Separator bunker shielding wall and doors (laboratory side) Monorail installation in ISOLDE MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw Conclusions Minimal disruption to ISOLDE Symbiotic relationship works Key things we needed: Learning from previous operational experience in ISOLDE 3-D integration and simulations (movements and Fluka) Failure and risk analyses (led to rail-based systems) Use of mock ups Time needed to try out and iterate ideas Whole system commissioning lies ahead… Same monorail now used in Charm facility MEDICIS Integrated Target Remote Handling System Keith Kershaw

MEDICIS Integrated Target Remote Handling System Keith Kershaw Any Questions? MEDICIS Integrated Target Remote Handling System Keith Kershaw