Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.

Slides:



Advertisements
Similar presentations
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Advertisements

Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
CDOT WATER QUALITY PROGRAM
6.5 River Stability and Bank Protection John Ratsey
Innovative Approaches to Wildlife/Highway Interactions The “Seven Dwarfs”
NATURAL RESOURCE STEWARDSHIP FOR HOMEOWNER ASSOCIATIONS Presented by: (Leader’s Name/Agency)
David O. Wallin Department of Environmental Sciences Huxley College of the Environment Western Washington University Bellingham, WA
Alabama Best Management Practices for Forestry Alabama’s Best Management Practices for Forestry “… are voluntary guidelines to help maintain and protect.
Erosion. What is it?  Movement of soil materials by the action of water, wind or gravity.
Carnell. IEMA, Ireland Regional Event Are SUDS the Answer for Drainage? Dublin, 12th Dec 2007 “Filter Drains as a SuDS System” presented by Andrew Todd,
Forest Practices Code Transition Roads With Ron Davis Chief Engineer, MOF.
The North Carolina Dam Safety Program. Our Responsibilities Administration and enforcement of the Dam Safety Law of 1967 and the supplementary Administrative.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
TransCanada Corporation (TSX/NYSE: TRP)
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Final Reclamation Part 5 U.S. Department of the Interior Bureau of Land Management May 2006.
Stream Crossings: Effects on Streams at Fort Riley Military Installation Gilbert Malinga 1, James Steichen 1, Stacy Hutchinson 1,Phillip Woodford 2, Tim.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Forestry BMPs OUR GOAL: To Protect Our Waters and Site Productivity Through the Proper Use and Application of Best Management Practices. (BMPs)
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Managing Council’s Road Network for Better Outcomes Storm Damage Experience Ian de Bruyne Manager Program Planning & Delivery IPWEA Regional Forum 15 May.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
Project Activity: Riparian Zone Restoration Scott Compton, Watershed Program Manager Valles Caldera National Preserve.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
La Center, Washington: Balancing Pipelines and Populations 1.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
RESPONSIBLE CARE ® POLLUTION PREVENTION CODE David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
1 Gas Pipeline Monitoring in the Delaware River Watershed.
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
Improving Lives, Communities and the Environment Through Natural Resources Conservation.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Andy Erickson, St. Anthony Falls Lab Watershed Summit March 12, 2011 Identify and Prioritize Treatment Solutions.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
Erosion & Sediment Control. Wind Erosion Water Erosion.
Recognition and reporting of water quality management problems on Michigan’s forest lands.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Low Impact Development (LID)
Natural vs. Accelerated Soil Erosion Natural geologic erosion has occurred at a relatively slow rate since the earth was formed. Natural erosion produces.
IENG 423 – Designing Decision Support Systems Sample DSS Analysis.
Erv Gasser Natural Resource Specialist nps Baer Field Manager National Interagency BAER Team Leader - North team National Park Service, Seattle, Wa BAER.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Analysis of Sediment Yield from Unpaved Roads. Phase I: Unpaved Roads Inventory Field Data Collection  subwatershed scale  ~90 miles of roads  diversity.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Maintenance of Structures Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works- Community Roads of the Productive.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Water Quality Effectiveness Evaluation (2015) The WQEE protocol has been implemented in DSS since Staff have now collected data from 161 sample sites,
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Critical Components July 26, 2012 John Carrigan MassDEP Northeast Regional Office.
GOOD NEIGHBOR AGREEMENTS (AUTHORITY) MARCH 31, 2016.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
TWS/SELC Road Condition Study Two Duke University Nicholas School of the Environment, Masters Candidates and one Duke University, Undergraduate.
ROAD HAZARD ASSESSMENT
IS IT CORRECTABLE? A DECISION ANALYSIS TOOL
General theory “Water seeks it’s own level”, i.e. if there is a hydraulic connection, total energy will be uniform throughout the fluid “Inverted siphon”
BEST MANAGEMENT PRACTICES (BMP’S)
MS4 OVERVIEW 2015.
Stream Crossing Replacement Policy
Presentation transcript:

Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California have acquired industrial timberlands that were intensely managed for 150 years. Future management of these lands will require an approach commensurate with the industrial management of the past.

Roads and watercourse crossings have the greatest potential for erosion and sediment delivery within the park boundaries. The conceptual approaches to addressing short-term erosion potential are focused on immediate concerns regarding the roads and watercourse crossings. Conceptual approaches for the long-term are also focused on the roads but include aspects of long-term monitoring as well. Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park

Short-Term Erosion Control Measures Emergency repairs Maintenance and periodic inspections of inside ditches, waterbars and culverts following major rain events. Explore options to cost share maintenance and repairs. Remove/repair all high priority watercourse crossings. Monitor high priority road segments along Big River at sensitive sites.

Short-Term Erosion Control Measures (continued) Encourage and train stewardship volunteers to be roadway inspectors and thus assist DPR maintenance crews.

Long-Term Erosion Control Measures Continued annual maintenance of the roads and watercourse crossings. Ongoing monitoring program of roads and watercourse crossings. Decommissioning and abandonment of roads and watercourse crossings. Characterize and monitor landings to minimize fill mobilization. Repair of major road failures or landslides to maintain vehicle conveyance and reduce the potential for sediment delivery to watercourses.

Long-Term Erosion Control Measures (continued) Repair moderate priority sites after high priority sites have been addressed. Consult with professional foresters to assist in transitioning these industrial timberlands into self- sustaining natural forests.

Roads Recommended to be Maintained for Vehicle Access. Main Access Road (M1 and M14) High Chute Ridge Road (HC1.0). Road S22.0 Road L4.0 Road (L1.0) Roads in and around the Mendocino Woodlands.

The type and extent of road and watercourse crossing repairs are dependent upon the intended long-term use of the road. The extent of road/crossing repairs required should be considered when deciding on the eventual fate of the road. Considerations

Roads that require considerable repairs and are not required for vehicle patrol should be considered for decommissioning or trail conversion. Roads that require considerable repairs but are required for patrol may become a higher priority for repairs. Recommendations

Repair Options for High Priority Road Segments Excavation and recompaction of existing embankment fills. Repair of small cut-bank or fill-slope failures. Realignment of the road to a more stable location. Removal or reshaping the outside road edge fill. Excavated fill can be repositioned along the running surface, using it to fill the inside ditch, or placing and recontouring material along the inboard side of the road.

Repair Options for High Priority Road Segments (continued) High priority roads may be useable in the present condition, but these segments should be monitored regularly. Example: Road M1.0, at Alder Alley, where the road is positioned on an over-steepened slope immediately adjacent to the outside meander bend of the Big River.

Repair Options for Low Priority Roads Road segments that require minimal repairs, but that are required for public access and safety can, in most cases, be used in the present condition. Roads segments not required for public access and safety, should be considered for trail conversions. The running surface generally requires only minimal attention and can be used in the current condition for either vehicle or trail use. Low-priority dead end roads that have no watercourse crossings could be left untreated and allowed to revegetate and stabilize naturally.

Best Management Practices Roads and crossing need to be repaired and maintained using the Best Management Practices (BMP). BMPs are general techniques or design practices that will prevent or reduce pollution and maintain water quality. Most BMPs are also sound engineering practices and are cost-effective by preventing failures and reducing maintenance needs and repair costs.

Site Access When making decisions regarding road repair priorities or decommissioning, site access is an important consideration to keep in mind. Road decommissioning or trial conversions should be delayed if it would prevent site access necessary for restoration. Roads to recently logged areas may need to be maintained to facilitate management activities (vegetation and slash removal) required for both forest vitality and fire prevention.

Watercourse Crossings High-priority watercourse crossings were identified on virtually all of the roads. All high-priority watercourse crossings are likely to fail in the short term, limiting passibility and causing adverse impacts. Many of these crossings have impounded significant volumes of sediment. This sediment can be expected to be released if the crossing should fail, further exacerbating the environmental impacts downstream.

Repair Options for These High Priority Watercourse Crossings Complete reconstruction of the crossing Culvert replacement Add energy dissipater to the outlet Placement of rock armor on eroding fill slopes Complete removal culvert and fill Replace with trails that bypass the former crossing location, rock fords or bridges

Completely Clogged Ditch Relief Culvert