Availability studies for SB2009 Focus: relative availability performance of proposed single tunnel schemes (with respect to RDR) – Klystron Cluster – Distributed.

Slides:



Advertisements
Similar presentations
Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Advertisements

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
1 Lecture 4.3a: Metrics Overview (SEF Ch 14) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
7/1/ DIAGRAM APPLY ANALYZE CREATE EVALUATE REMEMBER/ UNDERSTAND 2 7/1/2011.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
1 LCWS10 in Beijing DRFS Development (S. Fukuda) 27/03/2010 DRFS Development KEK S. Fukuda Introduction : DRFS R&D Plan Talks concerning with DRFS in LCWS10.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Chris Adolphsen 10/03/09 MLI and HLRF Summary. Vladimir Kashikhin.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
1 Availsim DRFS and klyClus setup, assumptions, questions Tom Himel August 11, 2009.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
GDE meeting September 29, Availability Task Force Progress Report Tom Himel for the Availability Task Force Putting the Linac in a single tunnel.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
LCWS08 (Nov.18, 2008) 18/11/ Proposal of Distributed RF-source Scheme (DRFS) Shigeki Fukuda (KEK) Introduction Consideration of the cost Possible.
1 FNAL SCRF meeting 31/10/2015 Comments from LLRF Shin Michizono (KEK) Brian Chase (FNAL) Stefan Simrock (DESY) LLRF performance under large dead time.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/ Hz Operation in DRFS HLRF System KEK S. Fukuda.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Systems Engineering Conceptual System Design. Systems Engineering and Analysis, B.S. Blanchard and W. J. Fabrycky, 3 rd edition, Prentice-Hall, 1998.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
BAW1 RDR Confg For Mntn Rgn (S. Fukuda) 1 RDR configuration for Mountain Region S. Fukuda/KEK.
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Nick Walker for the Project Management ILC AD&I: Introduction and Overview.
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
John Carwardine, Ewan Paterson, Marc Ross 14/15 July 2009 Availability Task Force: Subgroup #2.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Block Diagram e- source e- DR e- RTML e- ML e+ source e- BDS e+ BDS e+ ML e+ RTML e+ DR Factor availability of single-tunnel housing out of overall availability.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Aug 23, 2006 Low Power HLRF System and Impact on Distributed RF System Shigeki Fukuda and Task Force Team of DRFS in KEK KEK.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AAP Review Oxford, January Introduction to SB2009 Nick Walker Marc Ross Akira Yamamoto.
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
DRFS in SB2009 KEK S. Fukuda Concept of DRFS System Description
Americas KlyCluster Cost Analysis Overview
MPE-PE Section Meeting
Availability Task Force Progress Report
EDR HLRF Work Packages Draft Summary
Availsim runs and questions
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
Availability and Reliability Issues for the XFEL Tom Himel SLAC/DESY
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Barry Barish Paris ICHEP 24-July-10
2. Techniques of fast control and protection for pulsed facility
ILC - Global Design Effort
Presentation transcript:

Availability studies for SB2009 Focus: relative availability performance of proposed single tunnel schemes (with respect to RDR) – Klystron Cluster – Distributed RF Goal: evaluate and explain differences we might expect with these 2 schemes – Identify important parameters (Which may become RD topics) For example: klystron exchange logistics, access limitations

Specifics: 1) Run availsim using SB2009 KlyCluster and DRFS proposal parameters – Sub-Group 1 (?) 2) Identify and Critique performance drivers – To be done with Chris and Shigeki 3) Evaluate linac subsystem availability for each proposal (and RDR) using spreadsheet-based technique – Non-monte carlo – Request: KEK team to lead

2) Evaluation and Critique - analysis of initial results Availability 'performance' drivers – MTBF / MTTR parameters – Access / logisitical strategies and assumptions Travel times; limitations on repair manpower Recovery time

2) Evaluation and Critique - Key question – are these ‘performance’ drivers consistent with observation? – How can we rationalize underlying issues and approach the problem Key question – for scheme X - what defines the availability-related response effort? – R & D? – Management (Operations and Maintenance) Models? To be led by John