Storage Activities Nov. 2012 1 Preparation for transportation of Turbines 2.

Slides:



Advertisements
Similar presentations
Annual RCRA Hazardous Waste Training Program
Advertisements

ODOT BULK FUEL MAINTENANCE PLAN WHAT TO EXPECT THE DAY THE VENDOR TAKES A SAMPLE.
/0403 Copyright ©2004 Business and Legal Reports, Inc. BLRs Safety Training Presentations Transportation Security TrainingPart II 49 CFR
Substation L1/ MCC L1 Update March 21 st, Current Location.
Safe use of Tools and Equipment at Height Guidance Richie Adams Egyptian Drilling Company.
General Rules Compressed gases and cylinders must be properly stored, transported and used to prevent injury and accidents. Compressed gases and cylinders.
AARAS SHIPPING AGENCIES PRIVATE LIMITED Break Bulk, Heavy Lift, ODC, Ro-Ro & Project Cargo Experts in Pakistan.
Presentation #15 Prescription Drug Storage and Inventory.
Understand Merchandise Planning in Retailing. The Merchandise Plan A budgeting tool that helps retailer or buyer to meet department goals ▫Planned sales.
113 Health & Safety Task B Test Research.
Eidesvik Offshore ASA - Kjell M Sandaker Experiences with Gas and Fuel Cells in ship machinery Incentra – rådsmøte, Haugesund – 2011.
Flexible Manufacturing Systems (FMS)
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
You can purchase these at home depot. I had one for each team of students. The kit won’t fit into the box, but it is a start. Buy the deeper trays not.
Initial PEP II Radioactive Waste Disposal Estimate Olga Ligeti August 6, 2007.
I got these (item number VGA) from Harbor Freight for 7.99each. They fit all the small parts and sensors for the original VEX kit. The case actually.
Background Background Importance of Project: Importance of Project: Gas Prices Gas Prices Energy Prices Energy Prices Transportation needs Transportation.
11-Month Update Hydrogen from Small Wind Turbines.
The art of Engineering
INCREASED SAFETY AND PRODUCTIVITY BUTT FUSING HDPE PIPE Jim Craig, P.E. Industry Relations Manager McElroy Manufacturing, Inc.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
Nonaxial Wind Turbines A New Class of Wind Turbines By Mike Fallwell.
Endend Oil and gas market. endend Customer requirements High reliability Low operating costs Low first cost Local codes and standards Domestic content.
Start Counter Construction Update Eric Pooser 08/21/2014.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
COMPUTER MAIN PARTS HARDWARE Y SOFTWARE JORGE MARIO RESTREPO VALENCIA CESDE.
Logistics and Distribution AG BM 460. Mini Case Mushroom compost Farm byproduct Very heavy Low value Costs money for disposal Can be used by green industry.
Safe Work Practices Instructional Goal: the participant will be more aware of the need for proper training on safe work practices at a waste site and.
National Drilling Company DROPPED OBJECTS HUNT DAY By MORCHED ALILA Senior Safety Engineer November 29, 2010.
Sage Intelligence Reporting SIRWA Inventory Stock on Hand (Pastel Partner) & Dynamic Name Ranges.
COMPANY – MS1 Rack Options Site Visit & Warehouse Storage System Evaluation Design/Build for Warehouse Storage Systems Warehouse Space Planning Building.
Safe Handling of Time Sensitive Materials Procedure Overview.
SL500 Modular Library System. Objectives Locate needed information. Define the safety and ESD requirements. Identify and locate major components. Unpack,
Marketing Essentials Chapter 22.  Advantages  Convenient, door-to-door delivery  Less protective packaging  Quick  Disadvantages  Traffic delays,
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
WEEKLY SAFETY MEETING September 22 nd, OGEC RIG RR 600 JOBI-4.
Sling Safety (Level 1 Rigger). Objectives Be familiar with regulations regarding slings. Be familiar with regulations regarding slings. Understand safe.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
ARRANGING &DISPLAY. GENESIS This unit encompasses the skills, knowledge and attitudes required to merchandise products within a retail store. It involves.
Chapter 12: Logistics, Distribution and Customer Service.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS UAW-GM SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS Copyright © UAW-GM Health & Safety.
Site lay out Tanks area Building area Unloading area GT21 GT22GT23 GT24.
Date of download: 7/10/2016 Copyright © ASME. All rights reserved. From: A Modular Code for Real Time Dynamic Simulation of Gas Turbines in Simulink J.
Repair of MCWV magnets (TT84 – M2). Works on three magnets : MCWV 693, MCWV 697, and MCWV 701 and the associated XABS Cause of the repair : XABS jam into.
1 Design Review Meeting June 29, 2012 InterContinental Ceylan Istanbul Hotel Istanbul /Turkey Baghdad Company for Gas Turbines Ltd Baghdad Company for.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
INVENTORY AND INSPECTION FOR GAS TURBINE COMPONENTS( GT22)
774X DCDA 21/2”, 6”, 8” 774X DCDA 21/2”, 6”, 8”. Modification Overview  Production began in  The 2 ½” 774X DCDA was discontinued in  The.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Light Bulb Changing Procedure
Make it Operational: Food Sales
Undergraduate Laboratories: Course Check-In List
National Transportables Programme
Welcome Echo Exhibits Echo Exhibits is a full-service exhibit and display manufacturing firm that utilizes the most modern technologies, coupled with years.
774X 21/2”, 6”, 8”.
A. Datum Corp. Bid package overview.
Coupling alignment. Outline:  Introduction  Types of coupling and installation  Preparation of alignment  Tools and types of alignment  Alignment.
CUSTOMER (Requirements) CUSTOMER (Satisfaction)
Best Social Media Marketing Company
Installation Binder / IRR – an example
3000SE 21/2”, 6”, 8”.
A lever is a machine consisting of a beam or rigid rod pivoted at a fixed hinge or fulcrum. A lever amplifies an input force to provide a greater.

Sling cleaning. Sling cleaning The Life time of the Sling can be Shortened Handling error Lifting in the handles Getting stuck (wheelchair, bed, sling.
How Excavation Companies Help You In Construction Projects In Ooltewah, TN.

Presentation transcript:

Storage Activities Nov

Preparation for transportation of Turbines 2

handing over Gas Turbine unit 22 3

handing over Generator unit 21 4

Preparation for transportation of Turbines 5

handing over Generator unit 23 6

7

8

loading turbines GT24 & Generator GT23 on from MOE stores to site 9

10

loading turbines GT24 & Generator GT23 on from MOE stores to site 11

loading turbines GT24 & Generator GT23 on from MOE stores to site 12

loading turbines GT24 & Generator GT23 on from MOE stores to site 13

loading turbines GT24 & Generator GT23 on from MOE stores to site 14

loading turbines GT24 & Generator GT23 on from MOE stores to site 15

handing over the stands for GT’s and GEN’s 16

handing over the stands for GT’s and GEN’s 17

loading turbines GT24 & Generator GT23 on from MOE stores to site 18

loading turbines GT24 & Generator GT23 on from MOE stores to site 19

Accomplishment moving GT21 & GT 22 from storage close to foundation at site 20

Accomplishment moving GT21 & GT 22 from storage close to foundation at site 21

Accomplishment moving GT21 & GT 22 from storage close to foundation at site 22

Accomplishment moving GT21 & GT 22 from storage close to foundation at site 23

Accomplishment moving GT23 & GT 24 from storage close to foundation at site 24

Accomplishment moving GT23 & GT 24 from storage close to foundation at site 25

Accomplishment moving GT23 & GT 24 from storage close to foundation at site 26

Accomplishment moving GT23 & GT 24 from storage close to foundation at site 27

Accomplishment moving GT23 & GT 24 from storage close to foundation at site 28

Inventory and visual inspection for the load coupling and handling tool of GT-21 29

Inventory and visual inspection for the load coupling and handling tool of GT-21 30

Inventory and visual inspection for the load coupling and handling tool of GT-21 31

Inventory and visual inspection for the load coupling and handling tool of GT-21 32

Inventory and visual inspection for the load coupling and handling tool of GT-21 33

Inventory and visual inspection for the load coupling and handling tool of GT

Inventory and visual inspection for the load coupling and handling tool of GT-21 35

Inventory and visual inspection for the load coupling and handling tool of GT-21 36

Inventory and visual inspection for the load coupling and handling tool of GT-21 37

Preparation For install diffuser GT-21 38

Preparation For install diffuser GT-21 39

Preparation For install diffuser GT-21 40

Preparation & inventory For install diffuser GT-21 41

Inventory and inspection for rigid load coupling ( GT21 ) 42

Inventory and inspection for rigid load coupling ( GT21 ) 43

Inventory and inspection for COUPLING SHAFT HANDLING TOOL 44

Inventory and inspection for COUPLING SHAFT HANDLING TOOL 45

Inventory and inspection for Expansion Joint ( GT22 ) 46

Inventory and inspection for Expansion Joint ( GT22 ) 47

Inventory and inspection for Expansion Joint ( GT22 ) 48

Inventory and inspection for Expansion Joint ( GT22 ) 49

Handing over lifting beam 50

Receiving wooden Cubic's for heavy lifting from local market 51

Receiving wooden Cubic's for heavy lifting from local market 52

inspection for Damaged materials with GE representative 53

inspection for Damaged materials with GE representative 54

inspection for Damaged materials with GE representative 55

inspection for Damaged materials with GE representative 56

inspection for Damaged materials with GE representative 57

inspection for Damaged materials with GE representative 58

inspection for Expired date chemical materials with GE representative 59

inspection for Expired date chemical materials with GE representative 60

Handing over Expansion joint boxes 61

Handing over Expansion joint boxes 62

Handing over Expansion joint boxes 63

Handing over Expansion joint boxes 64

inspection for Damaged materials and chemical materials with GE representative 65

inspection for Damaged materials and chemical materials with GE representative 66

inspection for Damaged materials 67

inventory and inspection for cable trays boxes GT21 68

inventory and inspection for cable trays boxes GT21 69

Handing over Diffuser GT21 70

Handing over Diffuser GT21 71

Handing over Diffuser GT23 72

Handing over Diffuser GT24 73

Handing over Diffuser GT24 74

Receiving ninth box of Missing parts from transportation company 75

Receiving ninth box of Missing parts from transportation company 76

Handing over load coupling GT21 77

Handing over load coupling GT24 78

Handing over hardware for load coupling GT21 + GT24 79

Inventory and inspection for cable trays boxes 80

Inventory and inspection for cable trays boxes 81

Inventory and inspection for cable trays boxes 82

Inventory shims 83

Inventory shims 84

Inventory shims 85

Receiving the Gas Turbine Containers GT21 + GT22 + GT23 + GT24 from MOE Store to Baghdad Store 86

Receiving the Gas Turbine Containers GT21 + GT22 + GT23 + GT24 from MOE Store to Baghdad Store 87

Receiving the Gas Turbine Containers GT21 + GT22 + GT23 + GT24 from MOE Store to Baghdad Store 88

Receiving the Gas Turbine Containers GT21 + GT22 + GT23 + GT24 from MOE Store to Baghdad Store 89

Receiving the Gas Turbine Containers GT21 + GT22 + GT23 + GT24 from MOE Store to Baghdad Store 90

91 Arrived missing Materials on 20/11/2012