Buildability™ for Your Homes Your Logo Here. Problem: Framing mistakes hurt your bottom line. So do “red tags”, delays, waste, and roof, floor or wall.

Slides:



Advertisements
Similar presentations
Pryda Floor & Rafter Truss Systems
Advertisements

An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
Carpentry Green Application 5. Key Lessons from Carpentry In Carpentry, we learned about: Tool and equipment use, safety, and maintenance Primary materials,
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
By.
Building with PolySteel. #1Footings Install standard (level) footings with rebar placed at the intervals required by your building design, as outlined.
Computer Engineering 203 R Smith Requirements Management 6/ Requirements IEEE Standard Glossary A condition or capability needed by a user to solve.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
Examination 7 th Semester CAHS 71 Bianca Bogdan. Outline Proposal Scheme Design Detail Design 1 Detail Design 2.
Presented By: New Home Sales Team Cooreman Properties & Irish Realty Building New Home Vs. Buying Existing Home Building New vs. Buying Used.
Structural Insulated Panel System Chapter 15. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
Case Study – St Clair Park Village, Auckland, NZ
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Microsoft Licensing: The Best Option for You. Which one is best for your organization? There are several licensing options available from Microsoft.
Building your Energy Efficient New Home. Learning Objectives: The features of an energy efficient house How energy efficient homes are rated on the EnerGuide.
VAP What is a Virtual Application ? A virtual application is an application that has been optimized to run on virtual infrastructure. The application software.
Maintaining Structural Integrity. Structural Integrity Before we can understand how to maintain structural integrity, we need to understand how homes.
What is Thermal Bridging? A reduction of the effectiveness of insulation to reduce conductive heat flow through the building envelope otherwise know as.
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
From balloons frame to CAD-tailored : Japanese precut framing technology comes to the U.S. Presented By: Soad Zaki Abdel-Tawab By: Ted Smalley Bowen Web.
Administratively Controlled Information. Introduction and Background This is going to be hard – but also rewarding Survive beyond LEO Navigation Communication.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Tot 15 LTPDA Graphic User Interface summary and status N. Tateo 26/06/2007.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
How to use Remote Desktop and Remote Support. What is remote desktop? Remotely control your computer from another office, from home, or while traveling.
SITECH (WA) PTY LTD Site Positioning Systems Supervisor System Sub Station Demo Guide.
How Do SIPs compare in cost to stud framing? More Less Same All of the above.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
System Construction System Construction is the development, installation and testing of system components.
A Prefabricated Framing and Enclosure System. The Problem.
GROUPAMA Football Stadium, Budapest Design and other engineering work for the precast concrete structure Precast solution of the structure (splitting.
Management Approaches. Construction Management Customer appoints Design team and Management team.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
Energy Seminar A prefabricated, non-disruptive approach to whole house energy retrofit. Stock assessment, appropriate properties and implementation. John.
Sprinkler Loads on Trusses Educational Presentation.
K-3 Modular Classrooms Constructed with Cross Laminated Timber REQUEST FOR QUALIFICATIONS FOR Design-Build Services Project No Project No
The Benefits of Modular Offices & Prefabricated Buildings For Businesses.
What’s New in Version 5? What’s New in MiTek 20/20? New Product Versions Layout MBA Engineering Batchcut Output.
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 7 OF 10 Layout & Panel Installation SPONSORED BY:
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 3 OF 10 The Order Process SPONSORED BY:
The Principles of Green Remodeling
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
Automating Accounts Payable
How Completed Interiors Are Achieved: Designing & Building
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
ERP = Enterprise Resource Planning
Refer to slide robustdetails robustdetails.
Financing Land Development Projects
Engineering Design Process
BIM Services in India - Conserve
Wood Structures Topic 8 Quality Workmanship
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Light Gauge Steel Frame
What is the Project? The Framing the American Dream project set up two controlled experiments: In each experiment, two identical buildings were framed,
Module 5: Facilitating Compliance with Prefabrication
The Evolution of Building Methods Traditional Methods
Overdriven Nails in Structural Sheathings
What is the Project? The Framing the American Dream project set up two controlled experiments: In each experiment, two identical buildings were framed,
Engineering Design Process
Your Facility Your Information
What is the Project? The Framing the American Dream project set up two controlled experiments: In each experiment, two identical buildings were framed,
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
05 November 2018 Offsite data for onsite assembly Rob Gardiner Armstrong Ceilings Commercial Technical Manager EMEA.
Truss Submittal Packages and Jobsite Packages
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
Adoption of Building Information Modeling Top Benefits of BIM data for Facilities Managers.
3D data transforms the complete building lifecycle with Scan to BIM or 3D Scanning Services3D Scanning Services Point Cloud Scanning Services Scan to BIM.
DBIA Manual of Practice
Presentation transcript:

Buildability™ for Your Homes Your Logo Here

Problem: Framing mistakes hurt your bottom line. So do “red tags”, delays, waste, and roof, floor or wall framing that doesn’t match the plans. They cost you: Increased Material Costs Unnecessary Labor Time Delays Jobsite Waste Costs

There is a solution: Buildability™

What is Buildability? Predictable Costs Faster Construction Structural Integrity Code Compliance Less Waste It’s what is built into well-designed structures:

What is Buildability? “Buildability means that you can actually build the home you just sold.” And when done it’s right:

SAPPHIRE™ Technology + Early Collaboration + Pre-Fabricated Components Buildability: How Do We Achieve It?

SAPPHIRE™ Technology We use MiTek SAPPHIRE™ Software True 3D Structural BIM (Building Information Model) Each element is modeled, including connections Our designers accounts for all design loads and framing We eliminate interferences and design for efficient solutions. If it works in SAPPHIRE, it works on site! We can design and produce trusses, walls, and floor systems with precision and efficiency – and make structural options easier to select.

Collaboration Using SAPPHIRE™ Viewer: FREE 3-D Software for the builder and trades. Shows your entire structure in full 3-D on your desktop, iPad, or Windows tablet. Allows efficient review, approval, decision- making, on-site clarity and verification. EARLY collaboration (before the home contract) maximizes builder benefits.

Pre-Fabricated Components: Benefits SBCA study (2100 Sq. ft. side-by-side framing) found: The use of trusses and wall panels resulted in – 250 less man-hours onsite, – 13 cubic yards less scrap – For a total savings of $3,356 vs. Stick Framing That’s $3,356 straight to the bottom line. -SBCA Framing the American Dream Study

Questions?

Let’s Get Started NEXT STEPS: Select plan for a home design that is in-progress We’ll create the SAPPHIRE Model and review options with you. We’ll work together with you to lock in the best framing package options, along with your costs. During estimating and construction we’ll review the framing details with your framer to ensure clarity and correct installation the first time.

Thank You! We’re ready when you are. Your Logo Here