Leslie Jones Target Design Engineer Goran Skoro, Steve Lilley, (Stuart Ansell)– Neutronic Dan Wilcox – Engineering Simulation Dan Coates – CAD - TRaM ISIS.

Slides:



Advertisements
Similar presentations
Further Modifications to the ARIES T-tube Divertor Concept Jeremy Burke ARIES-Pathways Project Meeting Jan 26,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
High Performance Divertor Target Plate, a Combination of Plate and Finger Concepts S. Malang, X.R. Wang ARIES-Pathway Meeting Georgia Institute of Technology,
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
Page 1 of 14 External Transition Joints for Tungsten Divertors D. Navaei, X. R. Wang, M. S. Tillack and the ARIES Team Japan-US Workshop on Fusion Power.
Chris Densham RAL High Power Targets Group To be a ‘one-stop shop’ (P. Hurh) for target technology Enable optimum physics performance via sound engineering.
Michael Butzek, Jörg Wolters, Bernhard Laatsch Mitglied der Helmholtz-Gemeinschaft Proton beam window for High Power Target Application 4th.
Japan-US Workshop held at San Diego on April 6-7, 2002 How can we keep structural integrity of the first wall having micro cracks? R. Kurihara JAERI-Naka.
Radiation Effects in a Couple Solid Spallation Target Materials S.A. Maloy, W. F. Sommer, M.R. James, T.J. Romero, M.L. Lopez Los Alamos National Laboratory,
Studies of solid high-power targets Goran Skoro University of Sheffield HPT Meeting May 01 – 02, 2008 Oxford, UK.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Japan considerations on design and qualification of PFC's for near term machines (ITER) Satoshi Suzuki 1, Satoshi Konishi 2 1 Japan Atomic Energy Agency.
Welding Workshop Technology
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
ISIS Second Target Station
Proton Accelerators for Science and Innovation Workshop at Fermilab
Dr. G. Appa Rao Defence Metallurgical Research Laboratory
Study of a new high power spallation target concept
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
ISIS Target studies Could a used ISIS target provide fusion relevant irradiated tungsten material properties? Tristan Davenne 20 th May nd Radiate.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
1 Thermo-Mechanical Analysis of ISIS TS2 Spallation Target Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory 5th High Power Targetry.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
1.3GHz Input Coupler for ILC
Cold Magnetic Shield Update
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
Forschungszentrum Karlsruhe FZK - EURATOM ASSOCIATION 05/14/2005 Thomas Ihli 1 Status of He-cooled Divertor Design Contributors: A.R. Raffray, and The.
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Solid Targets for Neutron Spallation Sources Eric Pitcher Los Alamos National Laboratory Presented to: AHIPA Workshop October 20, 2009.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
PASI OsC meeting 12th July 2012
Mitglied der Helmholtz-Gemeinschaft ESS cold and thermal Moderators Moderator & Reflector System Project Introduction Meeting | Yannick Beßler,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Page 1 of 19 Design Improvements and Analysis to Push the Heat Flux Limits of Divertors M. S. Tillack, X. R. Wang, J A. Burke and the ARIES Team Japan-US.
Strategies to Improve Electron Beam Weld Quality for ISIS TS2 Targets Arghya Dey and Leslie Jones Target Design Group ISIS, STFC, RAL.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Chris Densham Figures of Merit for target design for neutrons, neutrinos… Chris Densham Rutherford Appleton Laboratory.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SPS High Energy LSS5 Thermal contact & cooling aspects
Design and Optimisation of the ISIS TS1 Upgrade Target Dan Wilcox High Power Targets Group, RAL 6 th High Power Targetry Workshop, 12/04/2016.
First Wall Panel - Overview
LCWS11 WG4 Fully featured accelerating structure engineering design
Update on workshops 18-19th May 2017
ISIS TS1 Project: Target Design and Analysis
Ed Daly for W. Robby Hicks
n_TOF Target HiRadMat Experiment Proposal (1704)
Integrated Design: APEX-Solid Wall FW-Blanket
Design of Distribution Feedbox at LHC P7
He-cooled Divertor Design Approach
n_TOF Target #3 Baseline Design
Presentation transcript:

Leslie Jones Target Design Engineer Goran Skoro, Steve Lilley, (Stuart Ansell)– Neutronic Dan Wilcox – Engineering Simulation Dan Coates – CAD - TRaM ISIS TS1 Upgrade Target Design for Manufacture High Power Targetry Workshop 11 th – 15 th April 2016

Transition from models/simulations into physical target ISIS Target Manufacturing Facility TS1 Upgrade MK-6B TRAM (baseline model) Target thermo-mechanical model – engineering simulation Design for manufacture – how can we make it Summary Introduction

ISIS Target Manufacturing Facility TS1 Target Assembly TS1 Target Plates After HIP TS2 Target Assembly HIP EB Welder NDT Scanner

Target Manufacturing Experience Since 2006 ISIS has gradually transitioned from outsourcing 100% manufacture of our targets modules to establishing a dedicated - ‘Target Manufacturing Facility’ – early 2013 >90% processes now in-house. Valuable knowledge and experience from being involved through all stages. Identified weak areas of TS2 Target design – EB weld penetration Implemented changes - service life improved.

RECTANGULAR WATER MODERATOR WITH SINGLE POISON LAYER HYDROGEN MODERATOR BACK WATER MODERATOR CYLINDRICAL TANTALUM CLAD TUNGSTEN PLATE FLAT FRONT TARGET SOLID CYLINDRICAL BERYLLIUM REFLECTOR LIQUID HYDROGEN MODERATOR LIQUID METHANE MODERATOR WITH SINGLE POISON FOIL METHANE MODERATOR WATER PRE-MODERATOR TS1 MK-6B TRaM The Target, Reflector and Moderators are all Inter-related. Because of this the manufactured Target needs to closely match the theoretical model.

Target Concept for Thermo-mechanical Evaluation CONCEPT TARGET - Dan Wilcox (Covered in detail in separate presentation) Design optimised for max neutronic output within spec for temperature and stress.

TS1TS2TS1 UpgradeDesign Limit Peak Temperature (deg C) N/A Peak Heat Flux (MW/m^2) Tungsten Stress [ Beam Only] (MPa) Tantalum Stress [Beam Only] (MPa) Tungsten Stress [HIP+ Beam] (MPa) Tantalum Stress [HIP+Beam] (MPa)200* 75 Notes: Tantalum will yield at 200MPa TS1 and TS1 upgrade were modelled with MCNPX+CFX+ANSYS, 200µA HIP pre-stress modelled assuming 500°C ‘lock-in’ temperature TS2 was modelled with FLUKA+CFX+ANSYS, 40µA Target Thermo-Mechanical Results Dan Wilcox

Target Module 10 W/Ta Plates Tantalum Pressure Vessel Target Concept for Thermo-mechanical Evaluation

Avoid sliding contact between tantalum & tantalum!!

Design for Manufacture Option 1 - W/Ta only Option 2 - separate Pressure Vessel Common elements to both – Target Plate design Both have their merits - no decision yet Option 1Option 2

Individual Target Plate components Design for Manufacture

Compare with current TS1 rectangular target plates

Design for Manufacture Current TS1 rectangular target plates require 13 EB welds 4 on each face, 2 on each side + thermowell

Design for Manufacture

2mm water channel After HIP and QA checks

Design for Manufacture Target Stack for Options 1 & 2 constructed in the same way Target plates made individually Interlocked together and EB welded to form solid stack Water cooling channels ‘exposed’ (WEDM or milling)

10 Plates EB welded together to form a solid Target Stack Pair of Tantalum Manifolds Tantalum Flange Tantalum Window Target sub-assemblies Design for Manufacture Option 1

Design for Manufacture Manifolds EB welded to target plate stack Flange added next – Option 1

Design for Manufacture Finally the Window High cost to fabricate Flange/Manifolds/Window from Ta Difficult to achieve sufficient weld depth – density, melting point Ongoing development work on EB weld penetration (Separate presentation – Arghya Dey) High number of external welds - risk of water leaks? Weld quality issues at late stage could scrap whole target Not without risk Option 1

Option 2 Design for Manufacture 10 Plate Target Stack Stainless steel Pressure Vessel Minimises no. of external welds – 2 + comp Separate manufacturing streams – PV via OM Material cost greatly reduced

Design for Manufacture Main section cut from solid rod Central tube profile strengthens and stabilises Wire EDM to cut bore and water channels EDM sinking to cut internal slots for each target plate Conventional milling for other features Option 2

Target Stack inserted Thermocouple locators (not shown) Flange EB welded to main section Compression fitting welded in place Leak tested Design for Manufacture Option 2

Target ready for leak, flow & pressure tests Design for Manufacture Option 2 Window EB welded in place

Swaged thermocouples in 9 out of 10 plates Compression fittings used successfully in TS2 Target Manifold Much greater weld penetration achievable with st.st vs tantalum Easier to manufacture – less risk of scrapping target Design for Manufacture Option 2

Design for Manufacture Quality Assurance EB weld parameters established using test pieces Representative of joint to be welded Sectioned, polished, etched, measured Eddy Current technique being investigated HIP bond quality determined by Ultrasound Scan Materials testing programme comparing ‘as received’ with EB welded and HIPed materials

Target Size Comparison TS2 TS1 UPGRADE TS1

Summary Transition from neutronic models/simulations to physical target ISIS Target Manufacturing Facility TS1 Upgrade MK-6B TRAM (baseline) Target thermo-mechanical model Design for manufacture – Options 1 & 2 Stick to proven manufacturing methods – avoid known issues Incorporate best practices learned from existing TS1/2 target designs QA - test at every stage of manufacture + completion

Questions?