Spacecraft Level Testing and Verification Part 3 1.

Slides:



Advertisements
Similar presentations
Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
Advertisements

Solar Orbiter EUV Spectrometer
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
Colorado Space Grant Consortium DemoSat-B Colorado State University Matthew Jui, Ian Patterson, Mark Spowart, Todd Wallis June Colorado Space Grant.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Spacecraft Structure Development - Vibration Test - (60 minutes)
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 Spacecraft Thermal Design Introduction to Space Systems and Spacecraft Design Space Systems Design.
LSU 10/09/2007System Design1 Project Management Unit #2.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
ECE 355: Software Engineering
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
1 - ASP-05-STR1-263 M054-1 Tous droits réservés © Alcatel Space Industries All rights reserved Star One C1 - Insurance Presentation 8 - Satellite Test.
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Verification by test and quality assurance
EFFECTS OF THE VENUS GROUND AMBIENT ENVIRONMENT ON MATERIALS Principal Investigator: Linda Del Castillo Co-Investigators: James Polk, Michael Pauken, Elizabeth.
Maintaining the Flow ! Testing of Nuclear Feedpumps (and other important pumps)
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Improved Precision Leading to Improved Energy Efficiency Edward Decker AE 790 – Intelligent Buildings June 6, 2006.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
For Official Use Only; Information herein NOT Approved for Export; Contains Proprietary Protected Information; NOT for Public Release 1 WIPER PDR Stanford,
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
Idaho RISE System Reliability and Designing to Reduce Failure ENGR Sept 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
Thermal Subsystem Peer Review Objective: To maintain all components of the space craft within their specific temperature range.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 Thermal Control Subsystem (TCS)—Intro Lesson 37 Spring.
Thermal Control Subsystem
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
ROCSAT-2 Critical Design Review ISUAL Thermal Interface Design / Analysis Report Jeng-Der (J.D.) Huang ( 黃正德 ) Tsung-Yao (Andy) Chen ( 陳宗耀 ) Jih-Run (J.R.)
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Thermal Analysis Huade Tan 6/27/05.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
Space Environment Simulation Part 4 1. Part 4 Roadmap 2 Test Purposes and Industry Practices Test Types Test Levels Test Margins Unit Testing Thermal.
THERMAL TESTING and VERIFICATION 1. Introduction This lesson provides an introduction to spacecraft thermal testing and a comparison of the thermal test.
Unit, Development and Subsystem Level Thermal Testing Part 2 1.
Failure Modes, Effects and Criticality Analysis
Rationale for Selected MIL-STD-1540E Thermal Test Requirement
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) Thermal Analysis Christine Cottingham LM/GSFC 545 Hume Peabody GSFC.
Rose Navarro HMI Lead Thermal Engineer
FIELDS MEP Thermal Vacuum Cycling iPER
Gayle K. Martin November 14, 2016
General overview Place : Institue of Space Astrophysic (IAS, Orsay)
SPP FIELDS V1234 Thermal PSR
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Integrated Thermal Analysis of the Iodine Satellite (iSAT) from Preliminary to Critical Design Review October 20th 2016 Stephanie Mauro NASA Marshall Space.
Capitalization style for Presentation Title is “Title Case”
FIELDS SCM Thermal iPER
A.M.Villavan Sai Lalith Rohit K.Anudeep
LAT Requirements Verification in TVAC
© The Aerospace Corporation 2008 Rationale for Selected MIL-STD-1540E Thermal Test Requirement John W. Welch The Aerospace Corporation TFAWS
University of California, Berkeley
Thermal Vacuum Test: Plans and Procedures
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Integration and Test Organization Chart
Presentation transcript:

Spacecraft Level Testing and Verification Part 3 1

Part 3 Roadmap 2 Test Purposes and Industry Practices Test Types Test Levels Test Margins Unit Testing Thermal CyclingThermal Vacuum Unit Test Requirements Development TestingSubsystem Testing Spacecraft Level Testing Objectives Test Temperatures Spacecraft Thermal Balance Math Model Correlation Space Environment Simulation Test PlanningLessons Learned Testing Checklist

Introduction This lesson will describe the thermal tests that are typically performed at the spacecraft level. 3

Overview Thermal vacuum, thermal balance and thermal cycle testing of spacecraft will be described along with government requirements for such tests. The process by which appropriate test temperatures are established based on the allowable temperature ranges of spacecraft components will be discussed. The process by which thermal math models are correlated to thermal balance test data will be outlined. 4

Spacecraft Level Testing Also known as “system level”. Emphasis is different that at the unit or subsystem level. – Final ground verification of system and unit performance in a flight-like environment. – Focus is not on individual unit functionality, but rather on end-to-end performance verification of subsystems. Interfaces between units and subsystems. Continuity of mission objectives. Compatibility of different subsystem requirements. Flight-worthiness of vehicle. 5

Spacecraft Level Thermal Tests Qualification – Thermal vacuum Functional performance test demonstrating the ability of vehicle to meet design requirements under vacuum and at prescribed temperature extremes plus a margin. – Thermal balance Part of thermal vacuum test. Thermal model correlation and verification of thermal design and hardware. – Thermal cycling Environmental stress screening for detection of design and manufacturing process defects. 6

Spacecraft Level Thermal Tests (cont.) Acceptance – Thermal vacuum Functional performance tests to prove workmanship and flight-worthiness. – Thermal cycling Environmental stress screening exposes workmanship defects. 7

Spacecraft Level Thermal Test Objectives Primary focus: thermal vacuum test. – Emphasizes proving flight-worthiness and system performance in a flight-like environment. Thermal vacuum environment provides the most realistic flight conditions. Thermal gradients and temperature extremes will be most accurately represented. 8

Spacecraft Level Thermal Test Objectives (cont.) Secondary focus: thermal cycling. – Emphasizes stress screening to detect problems. This should have been completed at a lower level of assembly. Problems are extremely costly to fix at the system level. – Rapid rates of temperature change can be difficult (impossible) to achieve with the full spacecraft. – Environmental stress screening is not as perceptive. 9

Meeting Spacecraft Level Thermal Test Objectives Qualification testing with a non-flight spacecraft rarely performed due to cost. – Protoqual testing typical at spacecraft level for most programs. – Acceptance testing typical for second and subsequent spacecraft in a block buy. 10

Spacecraft-level Protoqual/Acceptance Testing Demonstrates system performance in vacuum at or near maximum and minimum expected flight temperatures plus applicable margin. Detect material, process and workmanship defects. – Emphasis is on mounting, cabling, connectors and unit and subsystem interactions. 11

Spacecraft level Protoqual/Acceptance Testing (cont.) Functional verification of thermal control hardware. – Abbreviated test during one cycle. – Heater control circuit hardware function and control authority. – Heat pipe performance. – Propulsion thermal performance. Test objectives accomplished during functional testing at temperature plateaus and during temperature transitions. 12

Thermal Subsystem Verification in Acceptance Tests Spacecraft thermal design previously verified by thermal balance test on qual/protoqual vehicle, but build-to-build variations can have thermal impacts. Installation quality of thermal control hardware is highly sensitive to individual technician’s performance. 13

Thermal Subsystem Verification in Acceptance Tests (cont.) Some manufacturing processes are difficult to control: – Interface materials (contact conductance). – Wrapping of tapes and heater elements (overlap, tension). – MLI wraps (compression, seams, overlaps). – Mounting of Optical Solar Reflectors (gap between mirrors). – Attachment of thermostats, sensors and patch heaters. – Thickness and area of optical coatings (paints). – Installation effect on optical properties. Defects seem to concentrate at higher levels of assembly. – Unresolved defects are pushed up to higher levels. 14

Test Requirements for Spacecraft Temperature range: Acceptance, Protoflight and Qualification temperature ranges are the same as applied at unit level. Actual spacecraft temperature cycle range is limited by units within the spacecraft that reach their allowable limits first. 15

Test Requirements for Spacecraft (cont.) Number of cycles, dwell duration, thermal balance: (1,3) *Qualification testing rarely performed at spacecraft level ** JPL limits spacecraft level thermal tests to Acceptance temperature levels *** GSFC allows 2 cycles for spacecraft that sees <10°C temperature variation on orbit OrganizationTest LevelNumber of cycles Dwell at plateaus (hours) Thermal Balance phases GSFCAcceptance4*** 24 with 2 hot and 2 cold starts 3 or more Protoflight“““ Qualification*“““ JPLAcceptanceNot specified 2 or more Protoflight**N/A Qualification**N/A DoDAcceptance4 8 first and last cycle, 4 on other cycles Not required Protoflight4“3 or more Qualification*8““ 16

Example - Spacecraft Thermal Vacuum Test Profile 17 0Pumpdown9TB Phase 9 19Cold 3 trend 1TB Phase 1 ascent10TCS htr A funct20Cold to hot 3 2TB Phase 2 heater/survival11Cold 1 trend21Hot 3 trend 3TB Phase 3 pre op pre heat12Cold to hot 1,22Hot to cold 3 4TB Phase 4 cold op/eclipse13Hot 1 trend23TCS htr B funct 5TB Phase 5 14Hot to cold 124Cold funct 4 6TB Phase 6 cold to hot 15Cold 2 trend25Cold to hot 4 6AOutgas/functional tests 16Cold to hot 226Hot funct 4 7TB Phase 7 hot17Hot 2 trend27Power down, 8TB Phase 8 hot 18Hot to cold 2

Test Temperatures 18

Establishing Space Vehicle Level Test Temperatures Objective is to get as many units as possible to their individual protoqual or acceptance temperatures. – More benign test temperature plateaus may be established to demonstrate in-spec performance. Vehicle is divided into thermal control zones. – Equipment panel, individual heater control zone. Unit nearest its temperature limit is used for control of that zone. – Do not want to exceed test temperature limits for any units. 19

Establishing Space Vehicle Level Test Temperatures (cont.) First thermocouple in a zone to reach the test temperature establishes when the entire zone is at the test temperature. – Results in most units within a zone being tested at a less stressing temperature than in unit level test. – Illustrates the importance of complete unit level testing. 20

Example – Establishing Vehicle Level Test Temperatures Unit acceptance test range – A: -24°C to +61°C (85°C range) – B: -10°C to +70°C (80°C range) – C: -34°C to +50°C (84°C range) Vehicle level temperature predictions (without 11°C margin) – A: -5°C to +45°C (50°C range) – B: -5°C to +52°C (57°C range) – C: -5°C to +35°C (40°C range) Vehicle level temperature predictions (with margin) – A: -5°C to +56°C (61°C range) – B: -5°C to +63°C (68°C range) -5°C to +46°C (51°C range) – C: -5°C to +46°C (51°C range) Test tolerance (±3°C) and test margin of safety (±3°C) – -5°C to +40°C (45°C range) Functional testing begins when first unit in zone reaches temperature – Results in an even less stressful temperature range for most units (~35°C range) 21 A C B 3 electronic units on a common panel in the same thermal test zone }

Example - Space Vehicle Level Test Temperatures 22

Thermal Vacuum Test Functional Testing Perform functional test prior to chamber door closure. Full functional tests desirable during first and last cycle at hot and cold temperature limits. – Required by MilStd 1540, optional for NASA. (1,3) Abbreviated functional tests performed at hot and cold temperature limits for intermediate cycles. Final functional test performed after test is completed and chamber door opened. 23

Thermal Vacuum Test Functional Testing (cont.) Operational status of spacecraft: – Equipment operational during all portions of the test and should be programmed through various operational modes with perceptive parameters being monitored (recorded). – Only exception to this is during transitions from hot to cold. – Operating times should be divided approximately equally between primary and redundant circuits. 24

Spacecraft Thermal Balance Test 25

Thermal Balance Test Objectives Performed as part of the system qualification thermal vacuum test. Provides test data for correlation of thermal model. – Temperature data (steady-state and transient). – Heater power usage. – Electronic box power dissipations. 26

Thermal Balance Test Objectives (cont.) Verifies spacecraft thermal design. – Components remain within allowable temperature limits. – Interface temperature requirements are met. – Thermal gradients are as expected. 27

Thermal Balance Test Objectives (cont.) Shows thermal hardware works over full temperature range. – Heater operation: measure current draw, demonstrate margin. – Thermostat operation: verify location and primary/backup functionality. – Radiator sizing is adequate. – Heat pipe operation, sizing and location. – Louvers, phase change materials, interface materials, cryocoolers function as expected. – Flight temperature sensor accuracy. – Thermal software control and commanding. 28

Thermal Balance Test Objectives (cont.) Example - Solar Array Damper Heater Verification 29

Thermal Balance Test Phases A minimum of three test phases are usually required. – Hot operational equilibrium phase. – Cold operational equilibrium phase. – Cold non-operational equilibrium phase (typically cold “survival”). Heater verification. – Additional phases, as necessary, for further correlation, transients, eclipse conditions, software verification, etc. –. 30

Thermal Balance Test Phases (cont.) Test phases are usually specified for worst case conditions. – Need not be the absolute worst case condition, but similar to thermal design cases. Combination of seasons, equipment duty cycles, solar angles and eclipses. – Component internal dissipation, voltage, and environment typically held constant. “Pseudo” steady-state is achieved for components cycling on thermostats. 31

Example - Spacecraft Thermal Balance Test Profile 32

Thermal Balance Test Data Collection Temperatures for all test thermocouples and flight thermistors are recorded once all have reached equilibrium. – Thermal engineer decides when equilibrium has been achieved. Guideline, such as “≤0.5°C/hr”, should be established prior to test. – No cycling of equipment or environmental heaters during equilibrium phases. – Balance may be approached from a more extreme condition for conservatism. 33

Thermal Balance Test Data Collection (cont.) Heater duty cycle data also taken for model correlation and heater subsystem verification. For transient phases, temperatures are taken from a known equilibrium state through the entire transition. – End point need not be an equilibrium phase, but component power should be held constant until the transient phase is completed. 34

Functional Performance During Thermal Balance Important to exercise all important heat flow paths. – Across critical box to mounting surface interfaces, especially for high power units. – Across heat pipe interfaces. – Verify spreading of heat onto radiator surfaces. – Thermal gradients on equipment panels. – Requires that time be spent before the test to identify all critical heat flow paths and that test phases be implemented to verify them. 35

Functional Performance During Thermal Balance (cont.) Important to obtain operational responses of temperature-sensitive and mission critical equipment. – May require dedicated test phase to impose specific environment. 36

Thermal Math Model Correlation 37

Thermal Model Correlation Process Prior to test, spacecraft temperatures and heater power usage are predicted for planned test configuration and environment. During each phase of thermal balance testing, temperatures and heater duty cycle data are recorded for comparison to the thermal model predictions. 38

Thermal Model Correlation Process (cont.) Test configuration information are recorded. – Spacecraft bus voltage, electronic box operating modes, chamber cold plate temperatures, test heater power, etc. needed to confirm test conditions were as assumed in pre-test predictions. Thermal model predictions are updated with as-run test configuration prior to start of model correlation. 39

Thermal Model Correlation Process (cont.) Correlation of thermal model: – Model parameters adjusted within reasonable range to bring predictions into agreement with test data. Conduction and radiation heat transfer paths often adjusted. Spacecraft geometric model is rarely modified. All changes must be justifiable and reasonable. – Each thermal balance test phase is correlated to model predictions separately. – With each new correlation phase, care must be taken so as not to destroy correlation achieved in previous case. 40

Thermal Model Correlation Process (cont.) Correlation criteria vary from organization to organization, but ±3 to 5°C is typical. – Correlation criteria for heater power not generally specified, but criteria of  10% has been used. 41

Thermal Model Correlation Process (cont.) Following correlation, final flight temperature and heater duty cycle predictions are made. Compliance with thermal uncertainty or Allowable Flight Temperature (AFT) margin requirements demonstrated. Heater power control authority demonstrated. Any non-compliances require hardware or operational changes to maintain margin, or a waiver after appropriate review of risk. Despite test correlation, math model still has inherent uncertainties. 42

Residual Flight Temperature Uncertainties Temperature and heater power correlation deviations remain. Test unknowns: – Spurious heat sources in chamber. – Limited number of test cases. – Absorbed heating is an indirect technique. – Instrumentation inaccuracy. – Individual component dissipation accuracy. – End-of-life thermophysical properties cannot be tested. – Test cable and support structure losses. – Test equipment interference. 43

Residual Flight Temperature Uncertainties (cont.) Design changes as a result of testing are rarely verified by re-test. Other vehicle hardware changes such as box change-outs, addition of flight equipment that could not be tested in chamber, etc. 44

Concluding Remarks for Part 3 While defects in individual units may be discovered in spacecraft level test, emphasis is on interfaces and end-to-end verification of the system. Goal is to bring as many units as possible to their target temperature by setting up thermal control zones. Vacuum thermal cycling required on most programs, most commonly for 4 cycles. Thermal balance test required to correlate math model and verify thermal design. 45

Conclusion of Part 3 46