MASTER PLAN Refinement– 03.17.16. Principles Guiding 2016 Master Plan Refinement 1.Creating a robust on-campus community of students 2.Improving the Campus.

Slides:



Advertisements
Similar presentations
West County Transit Enhancement Plan Monday, May 16, 2011 Hercules City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Advertisements

West County Transit Enhancement Plan Tuesday, May 24, 2011 El Cerrito City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Case Study: Two Connecticut Towns and the Benefits of Master Planning.
Imagine Murray Bridge Workshops, 700 people, 4000 post it notes. Murray Bridge Retail and Traders, Arts and Culture, The Youth, Mypolonga, Monarto,
Yad Vashem Jubilee Holocaust Martyrs’ and Heroes’ Remembrance Authority תשי"ג – תשס"ג
April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation.
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Route 27 / Route 244 Bridge Design Aesthetic Considerations VDOT Project Number: V01, PE 101 June 28,
Faith Hensrud, Provost Tom Fennessey, Director of Facilities Management December 4, 2014.
State of Morrisville Mayor Mark Stohlman July 17, 2014.
Public Hearings January 13, Case: PSP Project: Avalon Park PD / Avalon Town Center PSP / A Portion of Tract 3 Uptown Avalon PSP Applicant:
Forest Street Corridor DESIGNWORKSHOP Forest Street Corridor.
Capital Financial Plan and Physical Design Framework DRAFT Committee on Grounds and Buildings May 2010.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
1 Think Big – Build Small Presented to White Flint Sector Plan Advisory Committee Nov, 2007 Presented by Natalie Goldberg.
Hanbury Evans Wright Vlattas + Company | Studio D Architects Analysis Concepts Refinement Integration Campus Master Plan NMSU
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AREA Property Acquisitions June 15, 2010 Presentation for SR 100 Board/City Council Meeting.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
CITY OF AVONDALE ESTATES Fenner Dunlop Property Stakeholders Public Meeting February 25, 2010.
Proposed Athletic Facility Renovations to East Hartford High School Albert Costa-Director/Facilities 1 Expectations Matter Effort Matters Competence Matters.
1 UAS Campus Masterplan December 2012 Draft. 2 PRIOR WORK - INPUTS –UAS Masterplan 2009 – Accreditation Review 2010 – UAS Strategic & Assessment.
Proposed Facility Master Plan First Baptist Church Mt Washington, Ky.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Master Plan Objectives Provide for a comprehensive set of specifications to allow Abode of the Message/SOI to move forward with property improvements.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Village of Ossining Vision Presentation Frederick P. Clark Associates, Inc. May 11 th, 2005.
Advisory Committee Meeting October 1, 2013 – 1 pm to 3 pm.
University of Toronto Mississauga Campus: UTM Master Plan Update Campus and Facilities Planning | March University of Toronto Mississauga Campus.
University Police Andy Rhinehart. University Police Mommy, what do the University Police do? Well Timmy, the University of Toledo Police Department (UTPD)
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
A NEW AMERICAN UNIVERSITY Comprehensive Development Plan Tempe City Council
HUMPHREY STREET OVERLAY DISTRICT 2015 Proposed Zoning Bylaw Amendment Public Information Session.
Site Analysis ·BROOKE FEDDER · MARIE ROTTSCHAEFFER· IZZIE MONOLOVUE · TENA PETTIT·
Sustainable Development “Meeting needs of the present without compromising the ability of future generations to meet their needs.” World Commission on.
Public Meeting: Tuesday, February 25,  Relationship to Comprehensive Plan  Existing Conditions  Transportation Overview  Market Overview  Concept.
PROPOSED NEW INTERIOR DESIGN & RENOVATION WORKS AT LOT 14.01, LEVEL 14, PLAZA MASALAM, SHAH ALAM FOR AL- MADINAH INTERNATIONAL UNIVERSITY (MEDIU). CONCEPT.
First United Methodist Church Katy, Texas Preliminary Master Plan Presentation September 29, 2009.
Thursday, November 18, 2010 LOMBARD DOWNTOWN PLAN Village Board Meeting Lombard Downtown Revitalization VILLAGE BOARD MEETING Thursday, November 18, 2010.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AREA Bulldog Drive Right-of-Way Acquisition Status March 9, 2010 Presentation for City Council Workshop.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
Old Florida Heritage Highway Master Plan A l a c h u a C o u n t y, F l o r I d a Old Florida Heritage Highway Master Plan Alachua County, Florida September.
Integrating Uses.
“Seen with Chinese Eyes " - Vingåker and VESP Zhang Lei Information technology department, Uppsala university
 Central to city core, population center and multi-family zones.  A community gathering place for citizens with a common interest.  Creates greater.
Village of Cashton Downtown Revitalization Planning Project Scot Wall – Cashton Area Development Corporation & Peter Fletcher - Mississippi River Regional.
UTSA WAYFINDING September 29, 2010 Business Affairs: Your Partner for Successful Solutions Next Steps.
Nicodemus National Historic Site Visitor Center Site Selection Study and Environmental Analysis.
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Palomar College HUMANITIES BUILDING “Creating places and spaces that enrich the lives of those who use them” “... Supporting innovation to enhance and.
West County Transit Enhancement Plan Monday, May 23, 2011 Richmond City Hall WCCTAC member agencies City of El Cerrito City of Hercules City of Pinole.
Building for the future. superior asset quality customer- preferred retailers.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Donaldsonville Returning to the River November 22, 2005 Presented to: The City Council of Donaldsonville and The Master Plan Committee Prepared By: In.
LANDSCAPE ARCHITECTURE. Are you interested in nature and preserving Mother Earth?
APRIL 26, 2016 Daniel F. Ford Playground at Emerson Garden Brookline, MA.
Potomac Hill Campus Master Plan Preliminary Planning Principles “Observing the Past, Planning the Future” Campus Master Plan Potomac Hill.
Community Development Department Town Center Multi-Family Master Site Plan Application #2227 Town Center Multi-Family Master Site Plan Application #2227.
University of Toronto Mississauga Campus Update to the UTM 2000 Master Plan University of Toronto Mississauga Campus: UTM Master Plan Update Campus and.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
site analysis A2D2 Zoning Changes “Core Downtown” D1 District Assumed 180’ Height Limit 400% FAR 700% FAR with premiums - Green construction - Parking.
MOSCONE EXPANSION PROJECT OCTOBER 21, 2013 Civic Design Review – Phase I.
1 Lockheed Martin TLS Visitor Maps & Directions Orlando, FL.
Opsis Architecture | Ballard*King Opsis Architecture | Lango Hansen 53 rd Avenue Park / Community Center Public Meeting 2.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission EA DA New NE MLK & Multnomah.
Campus Master Plan.
FOR LEASE $15/SF/NNN 657± SF ~ Quality RETAIL space Plain Street / Rte 139 Marshfield, MA Hartel Commercial Real Estate 230 Jones Road, Unit 6,
نتعارف لنتألف في التعارف تألف (( الأرواح جنود مجندة , ماتعارف منها أئتلف , وماتنافر منها اختلف )) نماذج من العبارات الايجابية.
New York City Master Plan Update
Broadway Plaza Redevelopment
Lockheed Martin – Building 100
Presentation transcript:

MASTER PLAN Refinement–

Principles Guiding 2016 Master Plan Refinement 1.Creating a robust on-campus community of students 2.Improving the Campus Visual Experience 3.Reinforcing “Town & Gown” Relationships 4.Branding and Communicating the UT Martin Experience

2015 Campus Master Plan Refinements

Aerial View of Campus Core

New Quadrangle Development

Aerial View of Crisp Hall Relationship to Campus Core Future Location of New Crisp Hall Student Plaza on the Historic Quadrangle

Crisp Hall Proposed Plan

Gooch Hall Student Life Plaza

Gateway Entrance at Mt. Pelia Road

Architectural Pillars at Pedestrian Entrances

Signage for Visitor Welcome Center and Parking

Crosswalk at Skyhawk Parkway to Access Retail

Site Acquisition Plan

Aerial View of Future Campus

MASTER PLAN Refinement–