Round 1 Debrief - AM What worked? Thorough inspection process Kitter and production scheduler always on time What didn’t work? Bubba wasn’t available to.

Slides:



Advertisements
Similar presentations
Marvelous Magical Magnets Created by Lisa Gibson.
Advertisements

WORK INSTRUCTIONS – Supervisor You deliver production orders to the Kitter. You motivate. If something is wrong. Find the culprit. Then motivate some more.
Lean Manufacturing.
Yellow Belt Training Kaizen Concepts
Today’s Agenda…9-16 Bellringer: What are the two conditions that must be met for something to be work? Finish notes on Work (Study Pack #17) Practice calculating.
1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
Marvelous Magical Magnets Read pages and write your own notes. Quiz will be at the end of the hour.
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Vandal Boat Factory Simulation
OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch Koç University Zeynep Aksin
Lean Operations (JIT) Module
1 Leveling: Tortoise not Hare. 2 Ohno, 1988 The slower but consistent tortoise causes less waste and is much more desirable than the speedy hare that.
Lean Operations (JIT) Module
Chapter 8: Quality Management © Holmes Miller 1999.
Just-In-Time “Eliminate Waste”.
JIT/Lean Production. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 15, Slide 2 Some.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping.
Cellular Manufacturing and Plant Layout
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
CONTINUOUS IMPROVEMENT PROGRAM
The Lean Enterprise VSM Symbols VSM Symbols Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Division 15  3 = ? We can solve this by jumping along a number line.
Welcome to the Lego Widget Flow Factory!
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
ISQA 459 Mellie Pullman 1.  JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories.
Six Sigma Simplicity 1 Facilitator Notes for Simulation.
Lean Production - Objectives
Just-In-Time & Lean Systems
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
PRODUCTION & OPERATIONS MANAGEMENT Module II JIT & LEAN PRODUCTION Prof. A.Das, MIMTS.
Chapter 13 Lean Systems This presentation covers the material in Chapter 13 - Lean Systems.
Round 1 Debrief - AM What worked? What didn’t work? – Inspection standards missing – Rework missing proper tooling – Bottleneck at inspection – Shipping.
Tactical logistics management and supply chain integration
Copyright 1997 PROMODEL Corporation UNIT TWO: SOFTWARE BASICS.
Just-in-Time and Lean Systems
10/13/2015 IENG 471 Facilities Planning 1 IENG Lecture 06 Flow: Quantitatively and Qualitatively Measured.
© 2013 DST Systems, Inc. All rights reserved. The California Adventure.
C Learning Objectives Power Notes 1.Just-in-Time Principles 2.Applying a Just-in-Time Approach 3.Accounting for Just-in-Time Operations 4.Accounting.
“Without the Cost of Waste …”
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
APICS is not responsible for statements or opinions expressed by individuals in its publications or at its meetings. The views expressed are solely those.
MAPPING YOUR VALUE STREAM
The Lean Enterprise Push versus Pull Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
Purpose: To help demonstrate the lean principles Time: 1 hour Airplane Exercise.
Lab #4: Pull and Perfection MG/IE 3400 – Production System Design.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
Chapter 27 Cost Management for Just-in-Time Environments
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Pull Production/ Just In Time
Kanban Production Just in time Systems
Round 1 Debrief - PM What worked? What didn’t work?
Modelling a Process using Process Flow Analysis
Just-In-Time and Lean Production
Manufacturing Planning
Round 1 Debrief - PM What worked? What didn’t work?
Value Stream Mapping ASQ March 2018.
Round 1 Debrief - PM What worked? What didn’t work?
Highland Sportsman Club Skeet & Trap Opening – Closing Instructions
讓價值流『精實』 消除浪費.
Force A Force is a push or pull..
Inputs and Outputs to APP
Presentation transcript:

Round 1 Debrief - AM What worked? Thorough inspection process Kitter and production scheduler always on time What didn’t work? Bubba wasn’t available to move material Faulty stamp Better way to handle oven insertion/bigger oven? Division of work between gold & silver Flex work between stamper & oven operator More folders (move Charles - put him on the spot) Go/No-Go gauge for sail height Go/No-Ge gauge for sail centering Consensus on stamp location

Changes for Round 2 Consider the following: – Factory Layout Put tables in a line, eliminate WIP locations Eliminate bubba? Re-assign to real work! Other? – Point of Use Storage (POUS) Batches? Store paper at folding – Line Balancing How many folders do we need? 3? 4? Flexing work Split fold 2 into 2 operations Combine stamping and oven Training for stamping – Poke-Yoke, Quality at the Source Sail height Stamp location (centering)

Round 2 Debrief - AM What worked? – Eliminated Bubba – Templates – Consolidating stamping/oven What didn’t work? Batches “Pushing” orders

Changes for Round 3 Consider the following: – Factory Layout – Pull System, Kanban Pacemaker process? Shipping Kanban size? – Continuous Flow and Supermarkets Supermarkets before and after oven? Folding and stamping into continuout flow Fire production scheduler – Poke-Yoke, Quality at the Source Inspection along the way Sail height – can be reworked Stamp centering

Round 3 Debrief - AM What worked? What didn’t work? Areas for improvement?