2 Oct. 2014 C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

23 July 2012 Thomas Bergauer (HEPHY Vienna) Belle II SVD Construction Database 12 th B2GM Bad Aibling.
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Scrap Convergence Plan Wuhan lens line #1 Update Feb 5 th Frédéric MORET Feb 5, 2007.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Honors Level Course Implementation Webinar Honors Rubric and Portfolio Review Process October 7, 2013.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Long-Term Congestion Rights (LTCR) Weekly Testing Call January 5, Project Pinnacle.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Comments on ladder structure 5 Feb Toru Tsuboyama.
Shipping/Receiving concerning the BW/FW assemblies S.Bettarini/F. Forti.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, 2015 (updated on Jan. 23) 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
Logistics 1 – To/Between Assembly Sites M.Friedl (HEPHY Vienna) 2 October 2014.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
1 Class-X BW/FW Subassemblies S. Bettarini for the Pisa Belle2-SVD group SVD Parallel Session VXD-Workshop Praga, 22 nd January 2015 OUTLINE Status/numbers.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
Class B ( L4.001 ) Data Base Tutorial Kamesh. 2 L4.xxx -- RS4.xxx ( check list ) OS4.xxx ( check list ) -- SPA4.xxx ( check list ) SBWxxx SFWxxx Check.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
QCG Report Francesco Forti University and INFN, Pisa.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Status & schedule of ladder parts production Oct. 2, 2014 Koji Hara (KEK)
Introduction Malte Backhaus CPIX test system developers workshop 31/03/2015 to 01/04/2015 Malte Backhaus1.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Summary Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 6 February 2013.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
B2GM, July 2013, Blacksburg, VA B2GM Summary 1 Blacksburg, VA, July 4-7 Executive changes Spokesperson: Peter Krizan -> Tom Browder IB Chair: Eunil Won.
Florian Buchsteiner (HEPHY Vienna)
L.Vitale INFN and Univ. Trieste
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD Overview Christoph Schwanda Institute of High Energy Physics Austrian Academy of Sciences 8th Belle II VXD Workshop September 9-11, 2015 Trieste, ITALY.
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Discussion items SVD mechanics session.
Katsuro Nakamura Sep. 10, 2015 VXD meeting
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
This Presentation Pack is brought to you by
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Teleconference ACS – FREIA 19th June 2017
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
SVD group organization, schedule, milestones
Presentation transcript:

2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop

Meeting Schedule October –3 rd – 4 th Oct: Pisa site qualification (class C) –31 st Oct. - 1 st Nov: IPMU and TIFR site qualification (class C) Do we really need two days? November –3 rd - 6 th Nov: B2GM (KEK) –7 th Nov: VXD mechanics meeting (KEK) –7 th – 8 th Nov: Rehearsal for SVD review (IPMU) Do we need 2 days? –9 th – 10 th Nov: SVD readiness review (IPMU) December / January –Site qualification HEPHY and Melbourne  date tbd C. Irmler (HEPHY Vienna)2 Oct. 2014

BPAC Milestones: Pisa Hybrid sandwich production –Procedure and jigs verified –First sandwiches produced BW sub-assemblies (SBW) –Final jigs available –2 class C for IPMU and TIFR  4 th Oct. –class B for HEPHY  4 th Oct. FW sub-assemblies (SFW) –Using temporary jigs –Design and productions of final jigs  15 th Oct. ? –class C for IPMU  10 th Oct. / for TIFR  late Oct.  when? –class B for HEPHY  15 th Oct. Class C Site qualification: 3 rd – 4 th Oct. C. Irmler (HEPHY Vienna)2 Oct Late October

BPAC Milestones: TIFR Mockup based on rev. 1 built in July Finishing of design and production of final jigs –more than 90% finished and verified with CMM –To-do: BW & FW pickup jigs Preparation and programming of gluing robot Preparation of wire bonding programs Build 1-DSSD Origami module –Sensor available? –Electrical characterization with APVDAQ Assembly of Class C ladder  early Jan 2015 –Class C FW sub-assembly ready by late Oct. Site qualification: 31 th Oct. –Possible without a class C module? –Shall we postpone to February B2GM? C. Irmler (HEPHY Vienna)2 Oct. 2014

TIFR: IPMU (Sep-Nov 2014) Kamesh: 17th Sep - 17th Oct* Nisar: 17th Sep - 12th Nov Subhashree: 15th Oct - 26th Nov Gagan: 26th Oct - 11th Nov *Kamesh may return to IPMU in November if FW/BW sub-assemblies are made available by 20th Oct. Long-term travel plan to be presented at BPAC –See backup slides for tentativ schedule C. Irmler (HEPHY Vienna)2 Oct. 2014

BPAC Milestones: HEPHY Production of final jigs  almost done –ToDo: BW and FW pick up jigs Need final drawings of MP jigs Verification of jigs and procedures  ongoing Build class C Origami sub-assembly  ongoing Build class B L5 ladder for beam test –17-24 SPS, CERN –Fully electrically functional –Might not have final mech. precision –Origami flexes from pre-production  no cracks! –Will start next week Full site qualification in January 2015 –19 Jan. 2015? –VXD workshop Jan. (tbc) C. Irmler (HEPHY Vienna)2 Oct wire bonded SPA in storage box

BPAC Milestones: IPMU Verification and test of final jigs Build class C ladders –C-1: finished, verify jigs, procedure and wire bonding efficiency –C-2: mech. precision measurement with CMM, cutting method for Airex –MM: partial dummy ladder to study wire bonding of -z –B-1: readable Origami sub-assembly with class C FW and BW sub- assembly? –Do we have enough sensors to be used for partial class B ladders? Class C site qualification 1 st Nov. C. Irmler (HEPHY Vienna)2 Oct. 2014

BPAC Milestones: Melbourne Finishing production of jigs –1 jig remaining Set up hybrid gluing Verify assembly procedure Verify sensor alignment –already done Finalize wire bonding programs Assembly class C ladder Site qualification in Jan. 2015? C. Irmler (HEPHY Vienna)2 Oct. 2014

Information to be Prepared Equipment at assembly sites –Clean room, CMM, Bonder, Gluing robot, etc. –TIFR and IPMU: Plan how commonly used equipment is shared Access to clean room for TIFR people Manpower overview –Who is responsible for which task –TIFR: Organization of assembly teams  Who are the team leaders How to assure uniform quality of both teams How is the training of the teams organized Schedule –Duration of assembly of one ladder / sub-assembly –Duration of full production –TIFR: Long-term travel and stay schedule of teams! C. Irmler (HEPHY Vienna)2 Oct. 2014

Documents SVD Twiki –To be reorganized  discussion in IB meeting –Add or complete information on assembly site pages Assembly manual –Structured manual –Process flow chart List up all assembly tasks –Description of each task Work instructions Matched with tasks in process flow –Format Twiki pages  create PDF file(s) for reviewers Standalone document (PDF)  upload or link it to Twiki page C. Irmler (HEPHY Vienna)2 Oct. 2014

L5 Assembly Process Flow C. Irmler (HEPHY Vienna)2 Oct L5 process flow Assembly steps Individual Tasks Described in work instructions Inspection or function test Data to be stored in construction DB Main task Input items Task number refers to work instruction Main task Work instruction for each task

L5 Work Instruction C. Irmler (HEPHY Vienna)2 Oct Task number and name Detailed but short description of Task Things to be verified or considered. Pictures good vs. bad List of tools and components Photos of components and / or assembly steps L5 assembly manual available on Twiki page Links to documents on SVN Automatically updated Still in progress Can be used as template for other layers L5 assembly manual available on Twiki page Links to documents on SVN Automatically updated Still in progress Can be used as template for other layers

Tentative BPAC Agenda C. Irmler (HEPHY Vienna)2 Oct Tentative agenda available as Google spread sheet – Ve_mUbn52lHJAJvKPDzykLGDkJk/pubhtmlhttps://docs.google.com/spreadsheets/d/1FETwDeGazYBz8s9A Ve_mUbn52lHJAJvKPDzykLGDkJk/pubhtml –Please also read the column “Content / Remarks”

BPAC Agenda – 1 st Day General General presentations –Physics requirements and performance of the SVD (K. Hara) –SVD group organization and construction schedule (C. Irmler) –SVD mechanics overview (M.Friedl) Ladder production specific talks –Ladder components production status (K. Hara) –Logistics (M. Friedl) Overview about parts shipment and (tentative) schedule –QC/QA, internal site readiness review (F. Forti) QC/QA guidelines and procedures Construction DB Site reviews C. Irmler (HEPHY Vienna)2 Oct. 2014

BPAC Agenda – 1 st Afternoon Ladder assembly –L4-L6 ladder assembly procedure (Y. Onuki) Description of ladder assembly procedure Please include FW/BW sub-assemblies from Pisa Compare with L5 work flow –FW/BW sub-assembly procedure (S. Bettarini) –L3 ladder assembly procdure (G. Taylor) Assembly site reports –FW/BW, L4, L5, L6, L3 Describe the current status of assembly site Equipment, Manpower, Schedule, QC procedure Assembly manual Open issues Achieved milestones  highlights (e.g. class C/B ladder) etc. C. Irmler (HEPHY Vienna)2 Oct. 2014

BPAC Agenda – 2 nd Day Morning Clean Room Visit –Demonstration of tools –Demonstration of selected assembly steps E.g. PA bending Electrical testing etc. SVD structure status (S. Tanaka) –Design and production status of cones, end-flanges, outer shell, etc. Ladder mount procedure (T. Tsuboyama) –Procedure, tools, alignment, etc. C. Irmler (HEPHY Vienna)2 Oct. 2014

BPAC Agenda – 2 nd Day Afternoon Thermal Mockup Status (tba) –Carsten will provide information  need to assign speaker Electronics and Grounding (M. Friedl) –Overview, status and schedule of SVD electronics Electrical performance and test beam results (K. Nakamura) –Results of DESY beam test Open issues (K. Hara) –List of unsolved issues –Ideas and scenarios how we plan to solve than – Priority of issues Schedule control and management of unexpected problems (C. Irmler) C. Irmler (HEPHY Vienna)2 Oct. 2014

BPAC - Timeline 3-4 Oct.: Pisa site qualification Prepare Indico page with agenda –To be done within next 1-2 weeks Assembly manuals and presentations –~2 weeks before review –Reviewers need some time to study them –Might be modified afterwards End of Oct.: working L5 ladder 31 Oct. / 1 Nov.: TIFR and IPMU site qualification –TIFR most likely postponed to Feb Nov. Assembly readiness review –7-8 Nov. rehearsals at IPMU Jan. 2015: HEPHY and Melbourne site qualification –Full qualification base on class B ladders 2 Oct. 2014C. Irmler (HEPHY Vienna)

SVD Schedule No significant change since July B2GM Start of production mainly driven by the PA0 problem –Need to find a solution asap We can start with FW/BW sub-assemblies –Need to define schedule for shipment of components VXD integration at the same time as BEAST phase 2 –Now starting from Dec VXD installation –Summer shutdown 2017 (Jul. – Sept.) –Need to prepare detailed schedule together with PXD group C. Irmler (HEPHY Vienna)2 Oct. 2014

SVD Schedule C. Irmler (HEPHY Vienna)2 Oct Needs to be shifted due to PA0

Thank you! Let’s start discussion. 2 Oct. 2014C. Irmler (HEPHY Vienna)

Backup C. Irmler (HEPHY Vienna)2 Oct. 2014

TIFR: tentative visit plan to IPMU (2015) Kamesh: 10th Jan - 28th Feb Sukant: 10th Jan - 10th April Varghese: 10th Jan - 10th April Gagan: 24th Jan - 14th Feb Sanjay: 25th Feb - 30th March Mangesh: 5th April - 5th July Nisar: 5th April - 5th July Kamesh: 25th March - 15th May Sanjay: 10th May - 15th June Thomas: 28th June - 20th September Varghese: 28th June - 20th September Kamesh: 10th June - 10 August Sanjay: 5th August - 10th September Subhashree: 15th September - 15th November Sukant: 15th September - 15th November Kamesh: 5th September - 15th November C. Irmler (HEPHY Vienna)2 Oct. 2014