. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.

Slides:



Advertisements
Similar presentations
Grimsby Secondary School
Advertisements

Chapter-2 Parts of Steel Bridge.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.
Heavy Concrete Construction Formwork
Chp12- Footings.
Lecture 9 - Flexure June 20, 2003 CVEN 444.
Bridge Engineering (6) Superstructure – Concrete Bridges
By : Prof.Dr.\Nabil Mahmoud
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
Chapter 34 Bridge Construction.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Two-Span LRFD Design Example
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Design of Tension Members
Reconstruction of the Eads Bridge Highway Deck
Design of Tension Members
Reinforced Concrete VS Steel
Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Steel Building Apartment- Design and Build
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Types of Structures  Residential - Structures in which people live.  Ex. Single family houses, condominiums, and apartment complexes.  Industrial -
There are many types of bridges including:
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
Reading Structural Drawings
Frames and Walls Lateral Stability
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
FORMS, SCAFFOLDING and STAGING
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
7. APPROXIMATE ANALYSIS OF INDETERMINATE STRUCTURES
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Wood Construction CTC-375.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
Moment Connection Requires Bolts Outside the Flanges
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
 Balsa Wood Bridge 8 th. How Does a Bridge Stay Up?
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
CESL Hotel Unique – Toronto Chris O’Brien Eric Fraser Scotia Mabury
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
UNIT 5 BRICK MASONRY.
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
Typical Bridge Components
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
High Bridge Re-Deck Project
Engineering Terms Bridge Unit.
Structural Considerations for Trusses
Pearl Condominiums Philadelphia, PA
Beam bridge Truss bridge Arch bridge Suspension bridge
Chapter-2 Parts of Steel Bridges.
Competency: Draw wall sections and details.
Arch205 building construction floor & Roof systems
Design Brief Liam and Dorsa.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Q7. ____________________have short spans usually less than 250 feet.
Presentation transcript:

. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park. Location: Brighton Heights, Pittsburgh, Pennsylvania. Will connect Davis Avenue to Riverview Park spanning 396’ over Woods Run Avenue at approximately 80’ high. Scope of Work: Structural Design Geotechnical preliminary designs and recommendations Project management plan Cost estimate Project Schedule Bridge History: Originally constructed in 1898, the Davis Avenue Bridge would be rehabilitated in 1986 before being closed to traffic in 2001 and eventually demolished in Pier Design: 14’x4’ with 2’ radius rounded edges. #6 reinforcement bars and #4 tie bars placed 4” from pier edges. There will be four total piers. The two piers on the West side of the bridge will be 20’ high while the piers on the East side will be 10’ and 5’ high. Recommended soil testing: Atterberg limits Triaxial testing Unconfined compression Consolidation Direct Shear Hydraulic Conductivity Overview: Steel arch bridge consisting primarily of double angles. The two sides of the arch will be connected creating an 11’ width between them. Loading guidelines: ASHTO LRFD 2012 Bridge Design Specifications 6 th edition along with ASHTO LRFD Guide Specifications for Pedestrian Bridges (2009) Truss member design: Using a STAAD model of the bridge, load cases were entered and axial forces were found in each member. Girders and wind columns were treated as beam columns. Bracing design: Again using the STAAD model wind loading was applied to the bridge. Axial loads were found and members were selected. All diagonal members were treated as pure axial loaded members while all other members were treated as beam columns. Transverse bottom cord design: Designed in order to provide adequate stability and force transfer between the two arches and into the foundation. Connections: Typical connections were designed for bolt strength, block shear, hole bearing, and slip. Eight connections commonly used in the bridge design were created. Floor beams: Floor beams were designed to carry the moment from the combined live, dead, and snow load. Background: Supplied by Composite Advantage in Dayton, Ohio, the fiberglass decking provides the necessary structural stability while provided numerous benefits over a concrete decking. Benefits: Light Weight- Weighing anywhere between 5 to 10 psf, the fiberglass deck weighs only 10 to 20 percent of an equivalent concrete deck. Durability- The wearing surface can protect against corrosion for over 50 years with minimal maintenance. Accelerated construction- The prefabricated panels can be placed using lightweight machinery at a much quicker rate than that of a concrete deck. Our Design: The Brighton Heights Pedestrian Bridge will utilize a 4” deep fiberglass decking. There will be 12 panels 8’x32’ and the final panel will be 8’x12’. The deck will include a wearing surface along with prefabricated curbs. Connections will be bolted to the bottom and clip onto the floor beams spaced every 8 feet. The use of fiberglass will enable the decking to be placed in a matter of days, speeding up construction time, decreasing the labor cost, and allowing Woods Run Avenue to reopen quickly. Members of Allegheny Bridge Consultants would like to thank the following people who aided in our design process: Dr. John Oyler, Mr. Patrick Miner, Dr. Kent Harries, Professor Joseph Beck, Dr. Dan Budny, Dr. Karl Lewis, Andrew Loff and associates at Composite Advantage, community members of the Brighton Heights Community Forum Top- Picture of Composite Advantage fiberglass deck Bottom- Diagram of typical deck to floor beam connection AutoCAD profile view of proposed bridge design. Estimate: Carried out a detailed estimate for each part of the project. AutoCAD plan view of pier design Top- Detailed estimate of steel superstructure Bottom- Detailed superstructure of pier and abutment work Below- Full project schedule AutoCAD cross sectional view of design. Aerial view of the site showing the proposed bridge site.