Taylor Hall George Mason University Fairfax, VA Advisor: Ed Gannon Introduction Prevention through Design Façade Re-design for PtD Stick-Built vs. Infinity.

Slides:



Advertisements
Similar presentations
Continuous Value Enhancement Process
Advertisements

A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
2001 Winter Presentation. Site Location Site View.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Fisk Corporate Headquarters Houston, Texas Penn State AE Senior Capstone Project Stephen Blanchard – Construction Management Option Advisor: Dr. John Messner.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
THE COMMONWEALTH MEDICAL COLLEGE (TCMC) SCRANTON, PAXIAO YE ZHENG | STRUCTURAL OPTIONSENIOR THESIS 2013 ADVISOR: HEATHER SUSTERSIC.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
SENIOR THESIS PRESENTATION
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Adam Trumbour 2010 AE|CM Introduction Building Overview Thesis Overview Breadth Analysis 1: CHPS Study Breadth Analysis 2: Green Roof Breadth Analysis.
Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
TYPICAL member spot checks & alternate systems design study
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
CHINESE HOSPITAL NEW ACUTE CARE AND SKILLED NURSING FACILITY TIM ARIOSTO STRUCTURAL OPTION AE 482 – SENIOR THESIS DR. RICHARD BEHR – FACULTY ADVISOR.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Reinsurance Group of America (RGA) Global Headquarters Natasha Beck Structural Option Faculty Advisor: Heather Sustersic Images courtesy of Gensler & Tom.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Senior Thesis Presentation 2009 The Pennsylvania State University.
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
Project Overview Analysis #1: Masonry Acceleration Adjusting the Critical Path Savings Potential Analysis #2: Façade Dimensioning Evenly Sized Elements.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
Brad Oliver – Structural Option Advisor – Professor Memari.
Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Presented by Cameron Mikkelson April 16, 2014 Silverado Senior Living Brookfield, WI Analysis Topics On-site Prefabrication of Interior Wall Panels Installation.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Redifer Commons Addition & Renovation Project
Grunenwald Science and Technology Building
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Biobehavioral Health Building, University Park, PA
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Presentation transcript:

Taylor Hall George Mason University Fairfax, VA Advisor: Ed Gannon Introduction Prevention through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Renderings courtesy of Gensler

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Project Delivery – Design Build Owner Design Builder Architect Bradley Williams - CM Various Sub-contractors Project Statistics : 295 Freshman Students 70,057 GSF ~$16,000,00 12 months of construction LEED Silver Project Statistics : 295 Freshman Students 70,057 GSF ~$16,000,00 12 months of construction LEED Silver Taylor Hall – George Mason University Fairfax, VA Design Sub-contractors Renderings courtesy of Gensler

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Increase the awareness for sustainable design Reduce the cost of construction while maintaining quality Investigate new ways to increase job-site safety Reduce injury risk for construction workers, future students and maintenance personnel Investigation Goals $ ! Analysis 1: Prevention through Design Analysis 2: Façade Re-design for Fall Safety Architectural Breadth: Mechanical Access Points Analysis 3: Stick-Built construction vs. Infinity System Analysis 4: Green Roof Addition Structural Breadth: Green Roof Load incurrence Preview of Analyses Taylor Hall – George Mason University Fairfax, VA

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Prevention through Design Critical Industry Research Disposal / Recycling Maintenance Decommissioning Construction Current Industry-Wide Issues Lack of risk knowledge Lack of early collaboration/communication Lack of contractual obligation for safety Ideas for Implementation Raising sill height to 39” Prefabrication Raising parapet height and using flat roofs Lowering mechanical access points Using low VOC materials “…the Center for Disease Control and Prevention (CDC) have pinpointed in recent studies that an abundant 37% of these work related injuries are directly caused by poor design ” - CDC.gov Taylor Hall – George Mason University Fairfax, VA A N A L Y S I S O N E Balfour Beatty Construction

Introduction Prevention Through Design Façade Re-design for PtD Architectural Breadth Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Façade Re-design and Implementation of Prevention through Design 39 in. Logical Safety improvement method given prefab structural system Total cost of implementation: No schedule impact Taylor Hall – George Mason University Fairfax, VA Results : Increase job site safety Prevent student misconduct Benefits outweigh cost Save cost on temporary fall protection lines Results : Increase job site safety Prevent student misconduct Benefits outweigh cost Save cost on temporary fall protection lines $17, A N A L Y S I S T W O Renderings courtesy of Gensler

Introduction Prevention Through Design Façade Re-design for PtD Architectural Breadth Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Investigation of Mechanical Access Points 8’ 6” 3’ 5” Mechanical Access Heights Mechanical RoomFloor Mounted Equipment Unit FCU Access3’ 5” Mechanical Penthouse 7’ 8” FCU Access points in each unit All access points considered safe (except trip hazard in pent house) All access points behind locked doors or restricted access Considered very “safe” design A R C H I T E C T U R A L B R E A D T H Renderings courtesy of Gensler

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Stick-Built Framing vs. Infinity Structural System Overall Cost of Stick-Built System Part of SystemPrice Wooden Roof Trusses/Sheathing $128, Wooden Framing $612, Wooden Joists/Girders $1,224, TOTAL COST $1,965, Total ($/SF) $28.06 Location Adjustment Multiplier (78.3) $21.97 Infinity Structural System estimated at $23 / SF Total Savings of $72, No schedule change with prefabrication Fire safe construction Experienced craftsmen in D.C. area Benefits A N A L Y S I S T H R E E Photos courtesy of Brad Williams Renderings courtesy of Gensler

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Structural Analysis Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Green Roof Addition Fiscal Analysis Payback Period: years Internal Rate of Return*: 4.21% Return on Investment*: 196% * Not including CO2 Emissions, Community Benefits, or Re-Sale Value Omni-Ecosystems.com 50 – year Life Cycle Cost Benefit Analysis ($/SF) Initial Cost $13.51 Maintenance and Replacement $18.25 Storm Water Reduction Savings $11.37 Energy Savings $6.37 CO2 Emission Savings $2.60 Community Benefits $30.90 Property Re-sale value premium $ Installation Cost of $17, day installation Green Roof Multi-purpose Room Green Roof 1,310 SF total Omni-Ecosystem comprehensive style green roof for optimum weight Can be added post-construction Low maintenance, high efficiency A N A L Y S I S F O U R Takeaways Significantly longer life than T.P.O. Educational opportunities in sustainability Lifetime net yield of up to $182,000 of benefits

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Structural Analysis Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Load Path of Green Roof Existing Factored Load: 81 PSF Factored Load with Green Roof: 99 PSF Load Comparison Structural Change Structural Evaluation of Potential Green Roof 1.5” 20 GA galv. Roof Deck 14K1 Series Joists W12X19 Girder 3” Steel Pipe Column HSS 4x4x3/8 Column 3 ksi concrete footing 15 PSF All structural members can safely accommodate new loading No structural changes are necessary S T R U C T U R A L B R E A D T H

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Conclusion Summary of Results AnalysisResult Prevention through DesignReduced risk of injury over the building’s life Façade Re-designMore efficient fall safety measures Stick-Built ConstructionCost effective solution for the D.C. area Green Roof AdditionEducational opportunities and financial benefits $ ! Renderings courtesy of Gensler

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Acknowledgments Renderings courtesy of Gensler Family and Friends John Risley, Contractor Safety Coordinator of PSU OPP Professors and Faculty of the Architectural Engineering department Questions?

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Appendix Green Roof Study conducted by the U.S. General Services Administration

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Appendix

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Appendix

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Appendix

Introduction Prevention Through Design Façade Re-design for PtD Stick-Built vs. Infinity System Green Roof Addition Conclusion Acknowledgments Bradley Williams - CM Taylor Hall – George Mason University Fairfax, VA Appendix