Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

Operating Reserves --- Again A Discussion Primer
WECC Standards Committee Joint Session
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee July 2014.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Presented to PGDTF February 11, 2015
PER
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
RFC Webinar June 17, 2009 Presented By: Mark Kuras Chair, UFLS SDT.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
WECC and NERC Protection Criteria and Standards
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Project WECC-0100 Update Reliability Subcommittee February 2014.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
April 23 rd OWG UFLS Survey & Power Factor Review.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Standards Subject to Enforcement Currently Or Standards Subject to Future Enforcement TSS Meeting #169 May 6-8, 2015 By: Lesley Kayser-Sprouse.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
WECC Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
Document Categorization Policy Chris Albrecht, Legal Counsel W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Next-day Study Task Force Jason Ausmus NDSTF Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
CIIMS Update Stacen Tyskiewicz CIIMS Chair March 22, 2016.
Planning Coordinator - Gap Resolution Team Lorissa Jones – GRT Chair PCC Update March 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee ISAS Report Pete Heiman April 20, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Bert Peters Chair, Path Operator Task Force
WECC – NERC Standards Update
Unscheduled Flow Administrative Subcommittee Report
WECC Regional Standards Update
Path Operator Implementation Task Force
Updates to the Path Rating Process for Approval by the PCC
Merrill Brimhall – Engineer, Staff
Project WECC-0100 Update Load Modeling Task Force
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Project WECC-0100 Update Reliability Subcommittee
Steve Rueckert – Director of Standards
TPL Voltage Guideline Presented to TSS Baj Agrawal Arizona Public Service Co. 8/21/2017.
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
WECC – NERC Standards Update
Palo Verde-COI RAS Retirement
Standards Development Process
Bert Peters Chair, Path Operator Task Force
Presentation transcript:

Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Agenda Approval Item: – BES Inclusion Guideline Informational Items: – RAWG Update – BES Exception Processes – WECC-0100 Update 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Approval Item: BES Inclusion Guideline RS sought approval of its’ proposed changes to the existing BES Inclusion Guideline at the July 2015 PCC meeting – PCC requested RS to re-evaluate proposed changes and take into consideration further comments based on the discussion RS received comments and has developed a proposal which has been sent out for review and is presented here for approval – RS has incorporated all of the comments/clarifications to the best of its’ ability while adhering to the intent of the guideline. Latest version has been posted for PCC review – Approval Item: Approve the document titled: BES Inclusion Guideline, dated February 16, W ESTERN E LECTRICITY C OORDINATING C OUNCIL

RAWG Update RAWG continues to work on activities related to the following issues: – Power Supply Assessment – Long Term Reliability Assessment – NERC Transmission Availability Data System Data Access for committee members at a granular level is no longer available due to the transition to NERC’s hosting of TADS (formerly TRD) 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

BES Exception Processes Planning Coordination Committee Informational Item

BES Exceptions Some of the comments on the Inclusion Guideline are regarding NERC BES Exception process. – RS held a robust discussion about issues the industry is facing and is presenting some initial thoughts here for informational purposes 6 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Bulk Electric System (“BES”) Inclusion and Exclusions – NERC Self Determined process – NERC Exceptions process FERC distribution designation – Uses the “Seven Factor Test” Processes available for BES Exclusions

Processes 7 BES Definition Self determined Inclusion/Exclusion Meets the “bright line” definition BES Definition Self determined Inclusion/Exclusion Meets the “bright line” definition Exceptions Request Does not quite meet the “bright line” BES definition Can be used to add and remove BES designation Exceptions Request Does not quite meet the “bright line” BES definition Can be used to add and remove BES designation FERC Petition to Exclude distribution elements based on the application of the “Seven Factor Test” FERC Petition to Exclude distribution elements based on the application of the “Seven Factor Test” NERCFERC

Need Clarify ambiguity in the NERC BES Exception Request Evaluation Guideline – Ultimately a NERC level effort to address “Consistency” and “Transparency”

Example BES Exception Request Evaluation Guideline - Page A network that may transfer energy originating outside the local network for delivery through the local network under specific circumstances characterized by one or more of the following: – The amount of energy transferred is limited – The duration of the transfer is limited – The circumstances under which the transfer may occur is limited A network that does not meet the bright line threshold in Exclusion E3 because it may transfer power in parallel with the BES will be considered for exclusion based on the general and specific considerations for networks.

Options 1.Initiate a guideline document to clarify NERC’s Exceptions Request Guidance document – Approach NERC committee/subcommittee/task force. 2.Create Standards Authorization Requests (SARs) to clarify BES exceptions (available to WECC/PCC if desired). 3.Do nothing – BES/distribution issues decided at FERC – Compliance Jurisdiction

Project WECC-0100 Update Planning Coordination Committee March 2016

R1.1 Steady State Voltage Applicability – All applicable BES buses. Criterion: – At all applicable BES buses – 95% to 105% of nominal for P0 event, – 90 to 110% of nominal for P1-P7 events Discussion – Steady state voltage range for P0 event originates in ANSI C84.1 standard. No difference for 500 kV for simplification. – Wider range for P1-P7 events to allow for contingencies. – Discussed definition of nominal. TP/PC can define nominal in their individual criteria applicable to voltage limits in their system.

R1.2 Post-Contingency Voltage Deviation Applicability - At each applicable BES bus serving load. Criterion: – Post-Contingency steady-state voltage deviation at each applicable BES bus serving load shall not exceed 8% for P1 events Discussion – The 8% for P1 events is based on some entities indicating a state regulatory need, and some entities allowing 8% voltage deviation for shunt reactive power device switching after an outage. Main concern is deviation for low voltage. – For P2-P7 events it was concluded it would be acceptable to not have voltage deviation criteria that is more stringent than just having the steady state voltage range in requirement R1.1.

R Transient Voltage Performance Applicability - At each applicable BES bus serving load. Concerned with busses either feeding load directly or busses feeding lower voltage system that serves load. Applies to P1-P7 events R1.3 – V recovery 80% following fault. Within 20 seconds to account for FIDVR events. R1.4 – Following V recovery above 80%, Vdip below 70% for 30 cycles, 80% for 2 seconds. Developed White Paper with posting 3. R1.5 – Same performance as R1.4 for contingencies without a fault (event P2.1). R1.6 – Oscillations required to show positive damping within 30 seconds.

Impacts to Other Systems WR2. – If an entity uses more stringent Criteria than WR1 shall apply that Criteria only to their own system unless otherwise agreed upon by all Planning entities involved. WR3 – If an entity uses less stringent Criteria than WR1 shall allow others to have same impact to that part of system. These requirements carry over from the previous Criteria requirement WR2 which allowed systems to apply different requirements than Table W-1. Retains the philosophy of “allowable effects on other systems”.

WR4. Cascading and Uncontrolled Islanding Threshold Criteria to identify potential for Cascading or uncontrolled islanding. Criterion: – Post contingency analysis results in steady-state facility loading either exceeding 125% or the known trip setting. – Transient stability voltage recovery to above 80% longer than 20 seconds. – When unrestrained successive load loss or generation loss occurs. Discussion – Since Cascading or uncontrolled islanding would manifest itself differently in different parts of the system, a threshold criteria developed where further investigation would be warranted. – For unrestrained successive load or generation loss, it is anticipated this would be an iterative study process as determined by the entity.

WR5 Voltage Stability Positive reactive power margin for the following: – For transfer paths 105% or 102.5% of path flow for P0-P1 or P2-P7 events respectively. – For load areas 105% or 102.5% of forecasted peak load for P0-P1 or P2- P7 events respectively. Discussions – Did not find good technical justification to changing existing real power margins used in previous Criteria. – Path or load area assumed to be voltage stable by at least demonstrating the margins specified. Discussion this is a criteria for transmission Planning over the Planning Horizon, not a methodology to find system voltage stability limits beyond what the system is planned for.

WR6 Make Criteria Available Entity that uses study criteria different from criteria in WR1 shall make their criteria available upon request within 30 days.

Frequency Dip Criteria Frequency dip criteria is not included in this Criteria. A frequency dip criteria was included in Table W1 which was retired. There is no good technical justification for frequency dip impact to load. Under frequency concern is to protect generators. UFLS designed in coordinated fashion based on frequency excursion to prevent excessive gen loss, not based on frequency dip as defined by previous criteria. PRC-006 Automatic UF Load Shedding defines requirements for PC’s developing UFLS Programs, WECC Off Nominal Frequency Requirements. Generator frequency capability requirements defined in NERC PRC-024

Next Steps Posting 5 resulted in no substantive changes. Ballot Pool open 3/21 - 4/8 Standards Briefing 4/8 Ballot open 4/12 - 4/28 Next Board meeting June 2016

Vishal C. Patel, RS Chair Questions?