EuropeAid PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EC EXTERNAL ACTIONS - 2008 EuropeAid/G7.

Slides:



Advertisements
Similar presentations
1 Unit C3 Finance, legal Affairs and Partner support CALL FOR PROPOSALS APPLICATION PROCEDURE SPECIFIC ADMINISTRATIVE AND FINANCIAL ISSUES Version
Advertisements

Bucharest – 18/9/2013. Procurement procedure of the awarding contracts by the Beneficiaries / Partners shall be in compliance with the procedural procurement.
Characteristics of projects in EU research programmes
RELATIONSHIP BETWEEN THE MANAGING AUTHORITIES AND THE PAYING AGENCIES IN THE MANAGEMENT OF RURAL DEVELOPMENT PROGRAMMES Felix Lozano, Head of.
Technical Exchange on the new templates of the Delegation Agreement Thursday, 21 th of March 2013 Practitioners’ Network – Brussels.
Research Contracts and IP Services TRAINING WORKSHOPS ON HORIZON 2020 – 27 NOV 2014 The Grant Agreement Roger Wallace – Research Contracts & IP Services.
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Not legally binding FP7 Rules for Participation and Grant agreement FP7 Helpdesk 
EuropeAid 1 DELEGATED COOPERATION AND CO-FINANCING : Application of Aid Effectiveness to EC procedures October 2009 AIDCO/G7.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
1 DG EMPL/B4 Administrative and Financial Rules. 2 = Leading partner. The only one with whom Commission has legal links Beneficiary.
LIFE Platform meeting Denmark 2008 Tommy Sejersen, Financial Desks EC DG ENV – LIFE Unit Telephone
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
EuropeAid How can a private entity benefit from EC Service Contracts ? Jean-Louis VILLE Head of Unit « Finances, Contracts and Audit » Neighbourhood.
Call ref.: FP ACC-SSA-2 (10/2004) Contract Negotiation - Sofia - Bulgaria 10 February, Mrs Marina ZANCHI DG Research Directorate N International.
This programme is co-financed by the European Union and the Republic of Turkey 1 EU-TURKEY CHAMBER FORUM II GRANT SCHEME PROJECT FINANCIAL REPORTING 2.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
Ismar Financial and administrative procedures Nearest Kick-off meeting Bologna, 11 October 2006.
1 SOCRATES PROGRAMME TN Projects 2004 & 2005 Contractual and Financial Management Administrative and Financial Handbook Maryline Fiaschi, 13/02/2006.
EuropeAid 1 Delegation Agreements: 2011 templates “Regards Croisés” on Aid Effectiveness Practitioners’ Network for European Development Cooperation -
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
Megan Richards RTD FP6 Kick Off Meeting Priority 7 and 8 11 November 2004 Sixth Framework Programme MANAGING FP6 CONTRACTS.
DG DEVCO, Unit B.6 Brussels, November Outline 1.Useful links 2.General conditions 3.General issues 2.
Tacis Contracting Procedure Documents to be submitted together with the application:  Original Declaration by the Financial Lead Partner for Tacis  Partnership.
DG DEVCO, Unit B.6 Brussels, April Outline 1.Useful links 2.General conditions 3.General issues 2.
Narrative reporting: good practices. Joint Technical Secretariat Seminar for Beneficiaries February 2012 Narva, Estonia.
Contracts FP6. PRESENTATION OUTLINE è Legal Framework è Participation è Contract Structure è Collective Approach l signature and entry into force l collective.
REPORTING, BUDGET, ELIGIBLE COSTS. Main steps of the financial management of the project.
Cooperationand consortium building Luis Araque de Juan European Commission International Cooperation and Development DEVCO/EuropeAid Unit R.3 Legal Affairs.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Kick-Off Meeting, Brussels 22 October 2004.
EuropeAid Version November 2010 Summary of the main changes.
Participation and dissemination Rules and Contracts FP6.
Grant contract and annexes Training for Auditors Estonia/Latvia/Russia ENPI CBC Programme Riga, Tartu, April 2012.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Reporting requirements - contractual and financial issues NGO Kick-off meeting Lorenzina Bruno, Senior Financial Officer Manuel Montero Ramírez, Project.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
Sixth Framework Programme : Contracts è Legal Framework & General Principles è Contract Structure è Collective Approach l signature and entry.
Technical Assistance Office 1 Contract, Reports and errors to avoid! GRANT AGREEMENT 2005 Comenius coordinators’ meeting, 17/10/2005 Maryline Fiaschi,
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
2014 ANNUAL PROGRAMME: MEETING WITH LEAD INSTITUTIONS & END BENEFICIARIES March 2016 CFCU.
EN DG Regional Policy & DG Employment, Social Affairs & Equal Opportunities EUROPEAN COMMISSION Luxembourg, May 2007 Management and control arrangements.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
EuropeAid/152087/DD/ACT/LB Cultural activities 2016 Information Session 13 th June 2016.
27 th of June 2013 GCCA Tanzania:Integrated Approaches for Climate Change Adaptation Information session on the Call for Proposals Contract and budgetary.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
The LIFE Programme: the EU funding tool for the Environment and Climate Action Lorenzina Bruno, Senior Financial Officer EASME – C.1.6 LIFE NGO Kick-off.
Chisinau, Republic of Moldova 2017
Version November 2010 Summary of the main changes
Chisinau, Republic of Moldova 2017
Tender Evaluation and Award Process
Preparation of a tender and tender documents
Content of Tender Dossier - Instructions to Tenderers - Tenders
Content of Tender Dossier Instructions to Tenderers
Particular Conditions of Contract & Appendix to Tender
Evaluation Grids Evaluation Grids.
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
PRAG PRACTICAL GUIDE FOR CONTRACT PROCEDURES
Contractual obligations
Drafting the Guidelines for applicants
International Open Procedure (1) – PRAG 4.3
Management Verifications & Sampling Methods
I - General and Financial Rules II - Applicant Eligibility
Management Verifications & Sampling Methods
Financial and Administrative presentation on PARTICULATES project
Presentation transcript:

EuropeAid PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EC EXTERNAL ACTIONS EuropeAid/G7

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 1, Introduction o 10th EDF – Modification of annex IV of the Cotonou Agreement: alignment to procedures applicable to projects financed from the EC general Budget Chapter 2, Basic Rules o Managemement mode/method of implementation: Essential elements for the financing decision o Eligibility EDF: experts engaged by tenderer may be of any nationality o EDF: local market purchases up to € o Additional advice on verification of certificates of origin

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 2, Basic Rules (cont.) o Exclusion criteria: clarifications concerning entities which due to its nature cannot fall into some of the situations; clarifications regarding natural persons representing legal entities o Visibility measures: also applicable in delegated management o Clarification of the use of the suspensive clause (Budget/EDF) o Record keeping: timelimits for different documents o Greener AIDCO action plan: consideration to environmental aspects o EDF: procurement procedures and thresholds aligned with those of the EC general budget o Competitive dialogue: award criteria must be best value for money o Amendments: clarification that award conditions may not be altered

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 2, Basic Rules (cont.) o Cancelled procedures: clarification that in case of division into lots, possible to cancel only one lot and not necessarily the whole procedure o Appeals: reminder of the possibility of hierarchical appeals o EDF: introduction of expenditure verification in service contracts o Terms of reference/technical specifications: reminder to consider environmental aspects + to ensure neutrality. Backbone strategy on Technical Cooperation: approval by beneficiary country of ToR/TS, participation in evaluation committees (centralised management) o Procedural rules and arbitration: reminder of the rules applicable for the EC general budget o Nomination of evaluation committees in decentralised ex-post

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 3, Service contracts o EDF: alignment with procedures and thresholds for EC general budget o Backbone Strategy on Technical Cooperation: TA contracts usually decentralised; beneficiary country approval of tender dossier; beneficiary country voting member; beneficiary country approval of experts (incl replacements); telephone interviews standard practise o Negotiated procedures: reference to new annex on crisis and emergency situations; clarification of unsuccessful use of a framework contract o Selection criteria should be possible to prove o EDF: possible to proceed even with less than 4 shortlisted candidates o EDF: prefinancing guarantee only required above €

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 3, Service contracts (cont) o Most economically advantageous tender = best value for money o Evaluation Committee: cross-reference to section 2.8 o Technical evaluation: further practical advice provided o Variants: framework for use of variants provided o Framework contract: advice to extend 14 day tender period to improve quality of experts o Competitive negotiated procedure: reminder of the possibility to use the simplified tender dossier; EDF: one compliant offer sufficient o Modification of contracts: clarifications & cross-references introduced, complementary services may be done through an addendum o Experts: clarification regarding evaluation of experts

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 4, Supply contracts o EDF: alignment with procedures and thresholds for EC general budget o Negotiated procedures: reference to new annex on crisis and emergency situations; o Beneficiary country; approval of the tender dossier and voting member (centralised management) o Reference to variants deleted (can only be used where the award criteria is best value for money whereas the award criteria for supplies is lowest price)

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 4, Supply contracts (cont) o Cancellation of tender procedure: introduced cross-reference to o Reminder of the possibility to use the simplified tender dossier for local tenders and thresholds below o Competitive negotiated procedure: EDF: one compliant offer sufficient o EDF: guarantee for prefinancing only required above € o Evaluation committee: cross-reference to section 2.8. introduced o Modification to contracts: further precisions given for additional deliveries; clarification of administrative orders for variations

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 5, Works contracts o EDF: alignment with procedures and thresholds for EC general budget o Negotiated procedures: reference to new annex on crisis and emergency situations; o Reference to variants deleted (can only be used where the award criteria is best value for money whereas the award criteria for supplies is lowest price) o Beneficiary country; approval of the tender dossier and voting member (centralised management) o Further advice on price revision formulas

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 5, Works contracts (cont) o EDF: guarantee for prefinancing only required above € o Evaluation committee: cross-reference to section 2.8. introduced o Cancellation of tender procedure: introduced cross-reference to o Competitive negotiated procedure: EDF: one compliant offer sufficient o Modification to contracts: extensive clarifications as regards measurements and price revisions, explanation when modification of contract is needed and by what means, administrative orders vs addenda, execution period

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 6, Grants o Clarification of the difference between grants and joint management o Additional information about PADOR o CRIS call for proposals module obligatory for the registration of applications as from 1 January 2009 o Clarification about the use and scope of exceptions to the nationality rule o Operating grants: reminder that they shall be gradually reduced when renewed. EDF: award within 6 months after the start of the budgetary year of the beneficiary o Exceptions to the non-profit rule

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 6, Grants (cont) o Direct award: reference to new annex on crisis and emergency situations o Submission deadline: advice how to deal with late arriving applications o Elaborated information about PADOR o Call managed by HQ: concerned EC-delegation(s) to be consulted even when assessors are not used o Regional calls: HQ may take the role as coordinator for comments from concerned EC-delegations o External assessors: the appropriate procedure for service contracts to be used

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 6, Grants (cont) o Clear separation between administrative and eligibility criteria o Reminder that the Contracting Authority has the right not to undertake the concept note evaluation if justified o Expenditure verification must be attached to the final report for grants of more than € o Clarification of the difference between grants and joint management o Extensive elaboration on grants to international organisations

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 7, Relations with International Organisations, Member States, Beneficiary Countries and other donors: Delegated Cooperation and Co-financing o The chapter has been entirely redrafted; it outlines the applicable rules and provides detailed guidance on delegated cooperation and co- financing Chapter 8, Legal text o Adapted to the new legal framework for EDF (10th EDF + revised annex IV of the Cotonou Agreement)

EuropeAid SUMMARY OF CHANGES TO THE PRAG Chapter 9, List of annexes o New annexes: Guidelines (crisis situations, drafting technical specifications for IT equipment, office furniture and vehicles) EDF: conciliation & arbitration rules Summary procurement notice for services (local publication) Terms of Reference for global price contracts Simplified tender dossiers (services & supplies) Delegation agreement (special & general conditions) Transfer agreement

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES General annexes o A1 glossary: extended glossary o A2 Eligibility EC programmes: modified EDF legal framework, updated OECD-DAC list on developing countries (applicable from 1 January 2009) o A8 notification letter: waiver of supporting documents if submitted for another procedure less than 1 year ago; language of supporting documents; copies of documents; declaration if concerned entity cannot fall into any of the exclusion situations, reminder that contract implementation may not start before contract signature o A10 negotiation report: in decentralised management, EWS must be verified with the European Commission o New annexes: e.g guidelines, co-financing agreements etc

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Services o Merger of EDF & Budget annexes o New annex b2_b – summary procurement notice o b2 procurement notice: elaborated instructions and clarifications to the standard text for selection criteria; example criteria for natural persons o b3 application form: introduction of environmental aspects; clarifications to applicants which are public bodies; may be submitted in copy; reminder of submission of documentary proofs; clarification of possible financial penalties o b5 shortlist report: EWS check in decentralised management: must be verified with the EC Terms of Reference

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Services (cont) o b7 letter to non shortlisted entities: deleted ”as well as those of the shortlisted candidates” o b8 admin.grid: key experts is only present in one tender as key experts o b8 general conditions: definitions moved to annex A1; assignees must not fall into exclusion situations; subcontractors may not subcontract unless agreed by the contracting authority (ref to art 34 and 36); general obligations added ”for matters not governed by the contract”; added the range of possible administrative and financial penalties; new clause covering errors, irregularities or fraud; intellectual and industrial property rights (ref to art 7.4); Terms of Reference

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Services (cont) o b8 general conditions (cont): beneficiary country approval in the case of replacement of experts; clarification in the text concerning amendment of contract; leave entitlement in fee based contracts; travel under the contract by most direct route may be working time; clarification to reporting requirements; invoice for the expenditure verification; clarifications to the checks of the expenditure verification and reference to the ToR for the same; clarifications to the payment schedule and late payment interest; release of the financial guaranteee; clarification to recoveries; additional case of suspension and termination; introduced a general termination clause; Terms of Reference

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Services (cont) o b8 general conditions (cont): clarification to the force majeure provision; extensive elaboration of settlement of disputes o b8 terms of reference; further guidance on how to specify requirements for experts e.g local expertise, minimum vs preferred requirement; abolition of definition longterm/shortterm experts; clarification of how to budget administrative staff; clarification on incidental expenditure, e.g. acceptance of C02 offsetting for missions under the contract; clarification to reporting requirements + beneficiary country approval; introduction of environmental considerations; specific ToR template elaborated for global price contracts Terms of Reference

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Services (cont) o b8 financial guarantee; introduction of temporary substitution in (decentralised management) o b8 ToR expenditure verification: clarifications & modification following an evaluation by unit G2 o b8 contract: late payment interest; o b8 invitation: reference to deadline and address in the instructions to tenderers o b8 instructions to tenderers: range of financial penalties; precisions on subcontracting; environmental considerations; clarification on the exclusivity of key experts; experts subject to the approval of the beneficiary country; only proven experience may be considered; clarifications to documentary evidence (e.g copies acceptable, when declaration, rely on previous documents) Terms of Reference

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Services (cont) o b8 instructions to tenderers (cont): currency of contract = currency of payment; budget of expenditure verification and incidental expenditure to be prefilled in the budget template; guidance on variants; submission deadline to be specified; interviews (by phone) standard practise; suspension/cancellation in case of irregularities, fraud etc; text referring to the simplified environment moved to the simplified tender dossier; reference to the PRAG for appeals. o b8 tender form: acceptable in copy; environmental considerations; clarified exclusion situations and possible penalties; precisions to the Statement of Availability and Exclusivity (key-expert, part-time, conflict of interest etc) Terms of Reference

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Services (cont) o b11 evaluation report: EWS check in decentralised management: must be verified with the EC; EDF preferential rules o b12 evaluator’s grid: revised scores must be justified in the evaluation report o b14 award notice: extension of information to be provided o b8 simplified tender dossier: updated with changes to the standard tender dossier Terms of Reference

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Supplies o Merger of EDF & Budget annexes o c2 procurement notice: elaborated instructions and clarifications to the standard text for selection criteria; example criteria for natural persons; minor changes to be published on the internet o c4 general conditions: definitions moved to annex A1; assignees must not fall into exclusion situations; general obligations added ”for matters not governed by the contract”; provisions for tax and customs arrangement to be laid down in the special conditions; clarification to implementation periods in case of lots/same contractor; clarification to recoveries and interest rates; extensive elaboration of settlement of disputes; new clause covering errors, irregularities or fraud; general termination clause; added the range of possible administrative and financial penalties;

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Supplies (cont) o c4 evaluation grid: reminder that selection criteria must be assessed before the technical evaluation o c4 instructions to tenderers: elaborated instruction text on supplies to be provided; variants removed where award criteria is the price; clarification of exclusion criteria; precisions regarding subcontracting; currency of contract= currency of payment; clarification of the validity period; clarification of the language of the offers and supporting documents; introduction of environmental considerations; text referring to the simplified environment moved to the simplified tender dossier; contractor must respect labour standards; suspension/cancellation in case of irregularities, fraud etc. reference to PRAG for appeals.

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Supplies (cont) o c4 performance guarantee, pre-financing guarantee: decentralised management: the HoD must countersign requests to pay; temporary substitution by the Commission. o c4 special conditions: price revision formula (if applicable); tax and customs arrangements; delayed payments; settlements of disputes; o c4 tender form: copies acceptable; environmental considerations; clarified exclusion situations and possible penalties; o c5 opening checklist: added that tenderers representatives must sign the presence list

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Supplies (cont) o c7 evaluation report: table for discounts and spareparts; EWS check in decentralised management: must be verified with the EC; preferential rules for EDF o c8 letter to unsuccessful tenderer: return of the original tender guarantee o c9 award notice: extension of information to be provided o c4 simplified tender dossier: updated with changes to the standard tender dossier

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Works o Merger of EDF & Budget annexes o d2 procurement notice: minor changes to be published on the internet o d4 financial offer: addition of a detailed price breakdown o D4 administrative and evaluation grid: now 2 separate files o d4 instructions to tenderers: completely restructured and redrafted o d4 performance-, pre-financing- and retention guarantees:decentralised management: the HoD must countersign requests to pay; temporary substitution by the Commission. o d4 special conditions: alignment with the new general conditions; price revision formula; delayed payments; settlements of disputes; origin

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Works (cont) o d4 general conditions: extensive revision based on the ex-EDF version (e.g texts moved from ITT/Special Conditions to GC); definitions moved to annex A1; clarification of administrative orders; subcontractors and assignees may not be in an exclusion situation; clarification of timing for supply of documents, guarantees, programme for implementation of tasks and approval of the latter; integration of the EU visibility requirements; respect of labour standards; provisions for design & build contracts; address of contractor’s representative; issuing entity of financial guarantees do not need to respect the eligibility rules of the contract; release of performance guarantee; detailed breakdown of prices; contractor’s drawings and approvals & changes of these;

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Works (cont) o d4 general conditions (cont): overlapping contracts; clarification to implementation periods in case of lots/same contractor; extensions to the period of implementation of tasks; clarification of contract modifications; origin of supplies & materials; payments; release of retention guarantee; final statement of account; end date; maintenance obligations renamed to defects liability; termination clauses; loss or damages limited to 10% of contract price; settlement of disputes; ethics clauses; administrative and financial penalties; new clause covering errors, irregularities or fraud; checks and audits; o d4 techofferform 4.4: financial figures to be provided for the past 3 years

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Works (cont) o d4 tender form: copies acceptable; environmental considerations; clarified exclusion situations and possible penalties o d7 evaluation report:EWS check in decentralised management: must be verified with the EC; preferential rules for EDF o d8 letter to unsuccessful tenderer: return of the original tender guarantee o c9 award notice: extension of information to be provided

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Grants o e3a guidelines: reminder that standard text not to be modified without approved derogation; notice open/restricted calls; clarification and consistency of terminology; precisions regarding subgrants; number of applications; elaboration on PADOR incl supporting documents; concept note content; environmental considerations; receivability of applications; information during the procedure to applicants (website); introduction of environmental sustainability in the evaluation; automatic penalisation of points removed in case no partnership; reference to PRAG for appeals

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Grants (cont) o e3b application form: environmental considerations; harmonisation and consistency of terminology; clear separation between administrative- & eligibility criteria and clarification on the assessment of these; full proposal: introduction of cover page, info already provided in the concept note form do not need to be repeated; adaptations to PADOR (family/network entity, sectors, experience during the last 7 years) o e3h_1 special conditions: execution period specified; clarification as regards the financing of the action (total cost of the action vs eligible costs); subgrants follow the nationality rules of the contract; eligibility of VAT; exceptions to the non-profit rule.

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Grants (cont) o e3h_2 general conditions: definitions moved to the glossary in annex A1, deleted sentence in art 1.2 ”The CA does not acknowledge any contractual link…”, extended information to be published ex-post; clarifications as regards amendments to the contract; additional cases for termination of contract (e.g. irregularities and fraud); eligible costs: clarification of incurred costs; gross salaries; contribution in kind in kind may be accepted as co-financing but is not an eligible cost; approval of reports and suspension of timelimit for approvals; reference to ToR on expenditure verification; expenditure verification report required for final reports in case of grants above € ; auditor to examine revenue of the action

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Grants (cont) o e3h_2 general conditions (cont): clarifications to the payment schedule & interest on pre-financing; technical and financial checks: added external auditor ”authorised by the Contracting Authority”; clarification of totalt costs vs eligible costs; clarifications concerning debit notes; o e3h_3 award procedures: alignment of procurement thresholds of Budget to EDF o e3h_5 interim report: introduction of an executive summary; report on planned activities that were not undertaken; link to logframe indicators.

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Grants (cont) o e3h_6 final report: introduction of an executive summary; report on planned activities that were not undertaken; link to logframe indicators; materials produced o e3h_8 expenditure verification: clarifications o e5a concept note evaluation grid: added ”if applicable” for partners o e5b proposal evaluation grid: added ”if applicable” for partners; abolished automatic penalty of points if no partnership; introduced environmental sustainability as a criterion. o e6a_opening report: separation of administrative- and eligiblity criteria; justification if recommendation not to undertake concept note evaluation

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES Grants (cont) o e6b_concept evaluation report: EWS check in decentralised management: must be verified with the EC o e6d_final evaluation report: EWS check in decentralised management: must be verified with the EC; separation between administrative- and eligiblity criteria o e9a_letter submission admin check: for acceptance added ” The above is without prejudice to any potential grounds for exclusion of your application which may be established during the further stages of the procedure” o e9b_letter cn preselection and e9c_negative letter: redrafted following the application of PADOR o e11 publication: extension of information to be provided

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES International organisations, Members States and other donors o f1 contribution agreement general conditions: deleted ”The Contracting Authority recognises no contractual link between..”; ex- post publication of beneficiaries; eligible costs: provisions in accordance with the organisation’s accounting rules in case of joint management); interest earned and accounting rules in case of multi- donor actions; clarifications regarding debit notes o f1 contribution agreement, special conditions: clarification of joint management and multi-donor actions; reference to the applicable framework agreement; clarifications to the financing of the action;

EuropeAid SUMMARY OF CHANGES TO THE PRAG ANNEXES International organisations, Members States and other donors o New annex f4 delegation agreement (general- and special conditions) o New annex f5 transfer agreement