Real Options in Project Evaluation: Project Timing Stephen Gray Campbell R. Harvey.

Slides:



Advertisements
Similar presentations
Real Options in Project Evaluation
Advertisements

Capital Budgeting1 Select investments which increase value of firm Maximize wealth of shareholders Important to firm’s long-term success  Substantial.
1 The Basics of Capital Budgeting: Evaluating and Estimating Cash Flows Corporate Finance Dr. A. DeMaskey Should we build this plant?
Chapter 8 Capital Budgeting Techniques © 2005 Thomson/South-Western.
Net Present Value and Other Investment Criteria
Study Unit 10 Investment Decisions. SU – The Capital Budgeting Process Definition – Planning and controlling investment for long-term projects.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
CHAPTER 14 Real Options.
Lecture 8 - Capital Budgeting: Estimating Cash Flows and Analyzing Risk.
WEMBA 2000Real Options26 Introducing Real Options What are Real Options? Expansion Options: Starsoft Inc. is considering expanding its internet software.
Chapter 8: Strategy and Analysis Using NPV
Real Options The Right to do Something Real. Introduction The classical DCF valuation method involves a comparison between the cost of an investment project.
Project Interactions, Side Costs, and Side Benefits 05/05/08 Ch. 6.
Chapter 4 Real Options and Project Analysis
CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Identifying embedded options Valuing real options in projects.
Real Estate Investments David M. Harrison, Ph.D. Texas Tech University Types of Real Options  Abandonment or Shutdown Options  Investment Timing Options.
FINA 522: Project Finance and Risk Analysis Lecture 12 Updated: 19 May 2007.
1 International Project Evaluation and Real Options Global Financial Management Campbell R. Harvey Fuqua School of Business Duke University
Why use NPV? NPV approach is considered the best one for evaluating capital budgeting. NPV is easy to interpret and understand: –Positive NPV projects.
Basics of valuation Value = Sum of discounted cash flows Future cash flows have lower value. Discount rate R = time value of money Present value of a stream.
Chapter 9 Net Present Value and Other Investment Criteria Copyright © 2012 by McGraw-Hill Education. All rights reserved.
Copyright © 2003 Pearson Education, Inc.Slide 17-1 Chapter 17 Real Options.
Real Options and Other Topics in Capital Budgeting
10 Capital Budgeting: Decision Criteria and Real Option Considerations ©2006 Thomson/South-Western.
4. Project Investment Decision-Making
1 Today Evaluating projects ‧ Real options ‧ Alternative investment criteria Reading ‧ Brealey, Myers, and Allen Chapters 5, 10, and 11.
McGraw-Hill © 2004 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Making Capital Investment Decisions Chapter 9.
Yale School of Management 1 Emerging Market Finance: Lecture 10: The Real-Option Approach to Valuation in Emerging Markets.
Valuing real options1 From financial options to real options 3. Real option valuations Prof. André Farber Solvay Business School ESCP March 10,2000.
Chapter 8 – Net Present Value and Other Investment Criteria
1 Real Options Analysis Office Tower Building Portfolio Presentation Fall 2008 ESD.71 Professor: Richard de Neufville Presented by: Charbel Rizk.
Steve Paulone Facilitator Sources of capital  Two basic sources – stocks (equity – both common and preferred) and debt (loans or bonds)  Capital buys.
Option Pricing Models: Theoretical Justification For all possible values of the underlying asset at expiration: (i)Calculate the option payoff at that.
Copyright ©2003 South-Western/Thomson Learning Chapter 9 Capital Budgeting: Decision Criteria and Real Option Considerations.
Growth Options Martin Development Co. is deciding whether to proceed with Project X. The cost would be $9 million in Year 0. There is a 50 percent chance.
1 Practical Problems in Capital Budgeting Lecture 3 Fall 2010 Advanced Corporate Finance FINA 7330 Ronald F. Singer.
Chapter 6 Capital Budgeting Techniques Sept 2010 Dr. B. Asiri © 2005 Thomson/South-Western.
MINICASE.
IB Business and Management
12-1 Capital Budgeting and Financial Planning LECTURE 22 Course Instructor: M. Jibran Sheikh.
MIT SLOAN SCHOOL OF MANAGEMENT Class Evaluating projects (3) Class 5 Financial Management,
Berlin, Fußzeile1 More About Present Values Applications: Concept of Net Present Values.
FIN 614: Financial Management Larry Schrenk, Instructor.
Net Present Value and Other Investment Criteria Chapter 8.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
© Copyright 2004, Alan Marshall1 Real Options in Capital Budgeting.
13-1 CHAPTER 13 Real Options and Other Topics in Capital Budgeting Identifying embedded options Valuing real options in projects Evaluating projects with.
Dr. M. Fouzul Kabir Khan Professor of Economics and Finance North South University Lecture 5: Project Appraisal Under Uncertainty.
CHAPTER 9 Net Present Value and Other Investment Criteria.
Capital Budgeting and Financial Planning Course Instructor: M.Jibran Sheikh.
CAPITAL BUDGETING &FINANCIAL PLANNING. d. Now suppose this project has an investment timing option, since it can be delayed for a year. The cost will.
Contemporary Engineering Economics
1 Real Options Ch 13 Fin The traditional NPV rule is a passive approach because … The traditional NPV approach assumes  mangers do not have influence.
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
1 CHAPTER 12 Real Options Real options Decision trees Application of financial options to real options.
9-0 Discounted Payback Period Compute the present value of each cash flow and then determine how long it takes to payback on a discounted basis Compare.
U8-1 UNIT 8 Project Valuation Should we build this plant?
CH 9 NET PRESENT VALUE AND OTHER INVESTMENT CRETERIA.
BPP LEARNING MEDIA CIMA P2 Advanced Management Accounting For exams in 2016 江西财经大学会计学院 吉伟莉
Chapter 6 – Multiple Cash FlowsCopyright 2008 John Wiley & Sons 1 CHAPTER 10 The Fundamentals of Capital Budgeting.
1 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating projects with embedded options Valuing real options in projects.
1 Capital Budgeting Techniques © 2007 Thomson/South-Western.
CHAPTER 11 COST OF CAPITAL 1.
CHAPTER 14 Real Options.
Ch. 9: Making Capital Investment Decisions
REAL OPTIONS: TAKING STOCK AND LOOKING AHEAD
Introducing Real Options
Option Pricing Models: Theoretical Justification
Valuation Tools webcast: Valuing a patent
Evaluating financial feasibility of long term Investment opportunities
Presentation transcript:

Real Options in Project Evaluation: Project Timing Stephen Gray Campbell R. Harvey

NPV and Real Options n NPV: –Often misapplied –Ignores strategic values if misapplied n Real Option Valuation: –Values contingencies in project outcomes (i.e., alternative future uses of the asset).

Project Timing Example n A company has the opportunity to build a new power project in a foreign country. n Net cash flows are $100mm in the first year of operation.

Project Timing Example n Net cash flows in the second year of operation depend upon whether the government sponsors a link to bypass a transmission “bottleneck”. n This is an example of political risk.

Project Timing Example n If the link goes ahead, demand for power from the new plant will be low and net cash flow will be $80 mm. n If the link does not go ahead, demand for power from the new plant will be high and net cash flow will be $125 mm. n Similar uncertainty surrounds Year 3 net cash flows. n Cash flows beyond Year 3 are perpetual.

Expected Net Cash Flow

Expected Net Cash Flow...

Case 1 n Now or never. n Cost to build is 1,100. n NPV=1, ,100 = -56. n Negative NPV. n Reject the project.

Case 2 n Now or never. n Cost to build is 1,000. n NPV=1, ,000 = +44. n Positive NPV. n Accept the project.

Case 3 n Option to delay for one year. n During this one-year delay, the generator learns whether or not the new entrepreneurial link will proceed. n Based on this additional information, a “smarter” decision can be made. n Cost to build is 1,100.

Expected Net Cash Flow in “up” state Expected Net Cash Flow in “down” state... “up” state “down” state 0.5

Expected Net Cash Flow in “up” state...

Expected Net Cash Flow in “down” state...

Case 3 (con’t) n Option to delay for one year. n Cost to build is 1,100. n Wait one year: –proceed if “up state”, NPV=177. –reject if “down state”, NPV=0. n Expected NPV today is:

Case 4 n Option to delay for one year. n Cost to build is 1,000. n If we build now, NPV 0 = 44. n What if we wait one year?

Case 4 n Wait one year: –proceed if “up state”, NPV=277. –reject if “down state”, NPV=0. n Expected NPV today is:

Conclusions n The option to delay can be valuable, even if the project has positive NPV if started immediately. n The value of these options is ignored by standard DCF techniques. n Proper analysis of these options is needed not just for project valuation, but also for project timing.

Case 5 - Abandonment n Plant can be abandoned at any time for 800. n This option will be exercised whenever the PV of future cash flows falls below 800. n This only happens at the lowest node, where perpetual cash flows are 64.

Yearly Cash Flows One-time Liquidation Value

Case 5 (con’t) n When the abandonment option is incorporated, the NPV of building the project now is +77. n The NPV of waiting for one year is n It is still optimal to delay for one year in this case, although the incremental value of delaying has decreased. n The value of the option to delay is lower if it is easy to exit a bad investment.