Arterial Travel Times Using Bluetooth Detection Presented by Amit Sidhaye, P.E., PTOE Project Manager SIGNAL SYSTEMS & ITS ARLINGTON COUNTY May 16, 2013.

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

TransPHAT IP Radios Glenn Anderson
SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview
2005 NW ESRI Conference - City of Yakima, Washington Yakima Transit & Refuse AVL Client, Server and Web Applications Tom E. Sellsted Supervising Senior.
Breaking the Static Barrier: Building Regional Support for Implementation of Dynamic Traffic Assignment in Long-Range Planning Processes TRB Planning Applications.
.nowNAZTEC 1. Overview AGENDA Benefits Algorithm Simulation 2 Case Studies Real-time adaptive traffic control system Adjusts signal timing based on current.
WMATA Bus ITS Project Update Transit Signal Priority Briefing to the Traffic Signals and Operations Working Group April 21, 2005.
I-95 Corridor Coalition Vehicle Probe Project Project Overview I-95 Corridor Coalition Vehicle Probe Project AASHTO SSOM Rick.
Update on VDOT’s Northern Virginia ITS Architecture Plan and Integrated Corridor Management (ICM) Activities MANAGEMENT, OPERATIONS, AND INTELLIGENT TRANSPORTATION.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
TRB Lianyu Chu *, K S Nesamani +, Hamed Benouar* Priority Based High Occupancy Vehicle Lanes Operation * California Center for Innovative Transportation.
Opportunities & Challenges Using Passively Collected Data In Travel Demand Modeling 15 th TRB Transportation Planning Applications Conference Atlantic.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
Lawrence Regional ITS Architecture Update. Today’s Agenda What is ITS? Review 2007 ITS Plans Review the proposed work plan Define project goals and objectives.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Advanced Lane Management Assist (ALMA) for Partially and Fully Automated Vehicles Robert L. Gordon, P.E. 1.
Signalized Intersection Delay Monitoring for Signal Retiming SafeTrip-21 Safe and Efficient Travel through Innovation and Partnership in the 21 st Century.
The Use of IPASS to Improve Mobility and Safety Through Traveler Information April 2004.
Ohio Department of Transportation Marian Thompson Freeway Operations Engineer September 20, 2005 Current / Future Direction of ITS Programs.
Regional Traffic Monitoring System for Maryland’s Eastern Shore Dr. Gang-Len Chang Traffic Safety and Operations Lab University of Maryland, College Park.
Next Generation Traffic Management Centers Brian L. Smith and Robert Kluger Webinar series presented by MAUTC, University of Virginia and VDOT.
The Dutchess County Fair Traffic Plan Talking Operations Web Seminar April 26, 2006.
By Syd Bowcott, URS Corp Bayne Smith, URS Corp.  Purpose of this Presentation  Overview of Project Area  Background  Project Goals  Stakeholders.
National VII Architecture – Data Perspective Michael Schagrin ITS Joint Program Office US Department of Transportation TRB 2008 Annual Meeting Session.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
March 27, 2007 – Hill Farms March 28, 2007 – NE Region Wisconsin LCS Lane Closure Planning System LCS Oversight Group Meeting Steven Parker - TOPS Lab.
Technology and Society The DynamIT project Dynamic information services and anonymous travel time registration VIKING Workshop København Per J.
Rural Application of the Colorado Transportation Management System Presented at ITS America, June 2007, Palm Springs, CA By Raj Chaudhuri and Ken DePinto.
1 Dixie ITS Architecture Study Section ? Utah ITS History.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
Keeping Wisconsin Moving: An Overview of WisDOT’s DMS Travel Times Kelly Langer, WisDOT, Freeway Operations Supervisor.
 Presentation at the 15 th TRB National Transportation Planning Applications Conference Atlantic City, NJ Monday, May 18 th Nick Wood, P.E. Texas A&M.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
Minnesota I-394 ICM Corridor. What is Integrated Corridor Management? Independent Network of Transportation Systems –Freeways, including managed lanes.
July 29, 2009 George Saylor, PE ODOT Senior ITS Engineer.
Travel Speed Study of Urban Streets Using GPS &GIS Tom E. Sellsted City of Yakima, Washington Information Systems and Traffic.
1 IntelliDrive SM Research, Development and Emerging Technologies National ITS Perspective Panel Joseph I. Peters, Ph.D. Federal Highway Administration.
THE I-75 DAYTON RECONSTRUCTION
Enhanced 511: Beyond the Basics Jerry Woods Florida DOT – District 5 iFlorida - Automated Message Generation Based on Travel Times.
Southwest Washington ITS Traffic Data Collection & Analysis: A Tale of 3 Projects Jill MacKay ITE Traffic Simulation Roundtable October 4, 2012.
Implementation Transit Priority System and Mobile Internet Passenger System in the City of Los Angeles Kang Hu and Chun Wong City of Los Angeles Department.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
1 Arterial AMS Deployment Case Study By Joseph Brahm (847)
ITS PCB T3 Webinar October 21, 2008 Montgomery County, Maryland Advanced Transportation Management System Automated Parking Information System Operational.
Success with Miami-Dade County’s ATMS Upgrade Success with EMBEDDED INTEGRATORS Presented at: ITS America Annual Meeting Houston, Texas May 4th, 2010 by.
Tennessee DOT SmartWay Update Presented by: Don Dahlinger, P.E. – TDOT September 2006 Presented by: Don Dahlinger, P.E. – TDOT September 2006.
Integrated Corridor Management Multi-Modal Perspective Duana Love, P.E. ITS Midwest 2006 Annual Meeting February 7, 2006.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Clay Packard, PE ITS GC Software Project Manager Florida Department of Transportation WAZE – FDOT Integration.
July 13, 2005ITE District 6 Annual Meeting Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages.
Traveler Information Applications: How Can VII Improve the Quality of Travel? TRB Session 644: Using VII Data, Part 1 Ben McKeever, US DOT, ITS Joint Program.
Educating Students for ITS Careers: Are Universities Meeting the Challenge? Transportation Agencies Perspectives Model Operations Nicolaas P. Swart, P.E.
Overview of King County Transit Signal Priority Program T3 Webinar January 22, 2008.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
Work Zone Operational Enhancements Jennifer Livingston, P.E. ADOT – Senior Project Manager.
FHWA Sponsored Webinar August 18, 2009 Denise Markow, PE TMC/ITS & Program Manager NH Department of Transportation Gail Hambleton IT Leader Transportation.
VDOT’s Operations Program Update and Opportunities June 6, 2014 Dean Gustafson, P.E., PTOE State Operations Engineer Operations Division.
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
ITS Virginia Annual Conference April 20, 2012 Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other product and company.
Local Government Roundtable Session Arlington, Virginia
Traffic Signal Performance Measures in a Small Urban Area
An ACSLite Case Study Riva Road in Annapolis, MD
Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages CTS Transportation Seminar Series, January.
ITE Midwestern District Conference June 20, 2017
Presentation transcript:

Arterial Travel Times Using Bluetooth Detection Presented by Amit Sidhaye, P.E., PTOE Project Manager SIGNAL SYSTEMS & ITS ARLINGTON COUNTY May 16, 2013

Arterial Travel Times Using Bluetooth Detection Presentation Overview System Overview Design & Integration Process DMS Applications Lessons Learned

Arterial Travel Times Using Bluetooth Detection How we got to where we are today… System Engineering (2010) RFI (December 2010) System Design ( ) RFP (March 2012) Construction (Ongoing) Full Deployment (Summer 2013)

Arterial Travel Times Using Bluetooth Detection RFI – December 2010 No constraint on technology Focus on Arterial experience 3 vendors participation for demo Add KHA RFI Details

Arterial Travel Times Using Bluetooth Detection RFI Data Collection

Arterial Travel Times Using Bluetooth Detection RFI Data Collection

Arterial Travel Times Using Bluetooth Detection Project Flow RFI Vendor Demonstration Concept of Operations Rule 940 Checklist DesignConstruction

Arterial Travel Times Using Bluetooth Detection Lee Hwy – 5.3 miles Rt. 50 – 4.5 miles Col. Pike – 3.2 miles Number of Detectors – 6 Number of VMS – 2 Communication – Fiber & Wireless Corridor AADT – 57,500 Location of server – Arlington County – Traffic Management Center (TMC) First Deployment – Rt. 50

Arterial Travel Times Using Bluetooth Detection Bluetooth Travel Time System - Basics

Arterial Travel Times Using Bluetooth Detection Arlington’s System Vantage Velocity (Iteris) Bluetooth detectors Daktronics Signs (w/ Vanguard Travel Time module) Detectors on wireless modems and fiber

Arterial Travel Times Using Bluetooth Detection Data Flow

Arterial Travel Times Using Bluetooth Detection System Calibration One size fits all approach may not work. Consider variance, volume, and roadway characteristics.

Arterial Travel Times Using Bluetooth Detection Data Sharing / Reporting XML / CSV feeds Web portal with map and report Graphical report features

Arterial Travel Times Using Bluetooth Detection DMS Messages Updated every 3 minutes Time stamped messages No messaging during extreme off peak hours

Arterial Travel Times Using Bluetooth Detection Early System Results Good data for travel time analysis for 24 hour test The # of matches from total matches from end-to-end in each direction was lower than expected based on the total number of matches for the individual segments. Need adjustment of standard omni-directional antenna used at Rt. 50 & Glebe Rd.

Arterial Travel Times Using Bluetooth Detection Application Accurate Travel Time information Signal Optimization – Before & After travel time runs Alternate route choice Regional integration Incident management Transit arrivals reporting Origin-Destination data Affects driver behavior

Arterial Travel Times Using Bluetooth Detection Lessons Learned Early IT department involvement DMS infrastructure Specifications follow up Knowledgeable contractor Back up support

Arterial Travel Times Using Bluetooth Detection Questions? Contact: Amit Sidhaye, PE, PTOE Project Manager, Signal Systems & ITS Arlington County, VA