2008 A.R.E. GRAPHICS SEMINAR SITE PLANNING gray dougherty, assoc. aia.

Slides:



Advertisements
Similar presentations
Architectural Drawing
Advertisements

EDT Foundation Plan Design1 Weekend Cabin Retreat Project Foundations Sacramento City College EDT 300.
Grimsby Secondary School
PLOTTING SCALE MODEL / LAYOUT PLOTSYTLE “.ctb” FFD 201 – PLOTTING.
13 Floor Plans Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives List the information required.
Accessibility.  A building code is a set of rules that specify the minimum acceptable level of safety for buildings. The main purpose of building codes.
PowerPoint Presentation
Chapter 8 Plot Plans.
Blue Prints.
Residential Architectural Plans
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
FFD 201 – SITE PLAN SITE PLAN.
Graphic Language of Buildings Architectural Plans.
Interpret drawings of domestic structures. Drawing Layout The drawings on the next two pages show how a construction drawing can be laid out to show the.
Site Plans.
INTD 51 rough floor planning. after the pre-planning process is complete, it is time to develop a floor plan that satisfies the needs mapped out through:
Drafting and Dimensioning the Architectural Floor Plan
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
After studying this unit, you will be able to: Interpret architectural drawings Describe how computers can assist in understanding house plans Organize.
ARCHITECTURAL DESIGN Residential Architectural Plans 1 Copyright © Texas Education Agency, All rights reserved.
Building Codes and Interior Design
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Means of Egress Chapter 4.
Construction Drawing Occupational Safety and Fundamentals
Construction Drawings
Code Analysis. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the NFPA)  Mechanical, electrical.
Chapter 23 Elevation Layout and Drawing Techniques.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Space Planning Chapter 7 and 16.
Affordable housing project
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
ID 234 Building Codes Fall 2012 Means of Egress Chapter 4.
Means of Egress Part 3 Chapter 4.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
ID 234 Building Codes Fall 2012 Vertical Components of Egress.
Introduction to BIM Module 02 – Building Envelope.
Introduction to BIM Module 06 – Views and Visualization.
Introduction to BIM Module 04 – Interiors and Circulation.
Codes.
Introduction to BIM Module 01 – BIM Modeling Basics.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 Learning Objectives Identify the primary features included in.
ID 234 Building Codes Fall 2011 Means of Egress Chapter 3, part II.
CEE 578 Senior Capstone Design Types of Construction Drawings
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
Mayor’s Office on Disability City and County of San Francisco Discussion of Common Design and Construction Errors.
Introduction to Building Trades Denver High School.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
Learning Objectives Add various components to a building model. Create stairs using the Stairs tool. Add railings to various locations in a project using.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
Design process project
PowerPoint Presentation
Upon completion of this module, you will be able to:
Learning Objectives • Add various components to a building model.
Design V Prof. Jill Bouratoglou
Elevation Layout and Drawing Techniques
CONSTRUCTION MASTERS BONUS BONUS
Architectural Drafting
Total Fitness Gym By Student Architect Jhonatan Rubio
City of Santa Cruz Accessory Dwelling Unit Development Program
PowerPoint Presentation
Architectural Drawing
Week 5 Drafting and Dimensioning the Architectural Floor Plan.
Building standards Mr. Da Silva.
Presentation transcript:

2008 A.R.E. GRAPHICS SEMINAR SITE PLANNING gray dougherty, assoc. aia

AGENDA  INTRODUCTIONS0.25 HOURS  GRAPHICS OVERVIEW0.50 HOURS  NCARB SOFTWARE0.50 HOURS  SITE PLANNING OVERVIEW0.25 HOURS  SITE GRADING1.00 HOUR  LUNCH0.75 HOURS  SITE ZONING1.00 HOUR  SITE DESIGN2.00 HOURS  QUESTIONS0.75 HOURS 7.00 HOURS

INTRODUCTION  GRAY DOUGHERTY, ASSOC. AIA  ORIGINALLY FROM NEWPORT BEACH, CA  GRADUATED BERKELEY M.ARCH  COMPLETED A.R.E.: 2007  GRE TEACHER FOR KAPLAN NEW YORK  UC BERKELEY GRADUATE STUDENT INSTRUCTOR  ED 4  ARCH 150  CURRENTLY WORKING FOR DOUGHERTY + DOUGHERTY ARCHITECTS  YOU?  NAME  HOMETOWN  CURRENT EMPLOYMENT  A.R.E. STATUS

GRAPHICS OVERVIEW  DIVISIONS  SITE PLANNING  3 VIGNETTES; 3.75 HOURS  BUILDING PLANNING  2 VIGNETTES; 5.5 HOURS  BUILDING TECHNOLOGY  6 VIGNETTES; 6 HOURS  VIGNETTES MAY BE COMPLETED IN ANY ORDER

GRAPHICS OVERVIEW  DIVISIONS  SCORING  BY COMPUTER  VIGNETTE BREAKDOWN  FEATURES, SUB-FEATURES, ETC.  GRADING  ACCEPTABLE, INDETERMINATE, UNACCEPTABLE

GRAPHICS OVERVIEW  DIVISIONS  SCORING  PREPARATION  SOFTWARE  STUDY GUIDES  PRACTICE VIGNETTES  GENERIC CODES  PRACTICE PROBLEMS  THIS CLASS!  ADDITIONAL RESOURCES   Norman Dorf, AIA: Understanding the Graphic Divisions of the Architect’s Exam.   AIAEB Library

GRAPHICS OVERVIEW  DIVISIONS  SCORING  PREPARATION  THE TESTING CENTER  DON’T BE LATE  WEAR LAYERS  BRING 2 FORMS OF IDENTIFICATION  NOTHING CAN BE BROUGHT INTO THE TESTING ROOM  THE 15 MINUTE BREAK IS MANDATORY

GRAPHICS OVERVIEW  DIVISIONS  SCORING  PREPARATION  THE TESTING CENTER

NCARB SOFTWARE  VIGNETTE NAVIGATION  REVIEW OF TOOLS  SKETCH ELEMENTS  PRACTICE, PRACTICE, PRACTICE!

SITE PLANNING OVERVIEW  SITE DESIGN90 MINUTES  BREAK15 MINUTES  SITE ZONING60 MINUTES  SITE GRADING30 MINUTES 3.75 HOURS

SITE GRADING  SUMMARY  INTERPRET AND MODIFY SITE TOPOGRAPHY TO CONFORM TO A GIVEN SET OF PROGRAM REQUIREMENTS  INFORMATION PROVIDED  EXISTING SITE ELEMENTS  CONTOURS  GRADING REQUIREMENTS  A QUICK LESSON ON CONTOURS  SWALE  CROWN  GRADES

SITE GRADING  STRATEGY  UNDERSTAND PROGRAM REQUIREMENTS  NOTE CONTOUR INTERVALS  NOTE GRADE REQUIREMENTS  DETERMINE WHAT CONTOURS CANNOT BE CHANGED  TIPS  NOTE REQ’D MIN/MAX CONTOUR SPACING  USE THE SKETCH CIRCLE TO MEASURE BETWEEN CONTOURS  SAMPLE VIGNETTE

SITE GRADING

SITE ZONING  SUMMARY  UNDERSTAND ZONING AND SETBACK RESTRICTIONS IN BOTH PLAN AND SECTION  INFORMATION PROVIDED  A SITE PLAN AND SECTION AXES  SETBACKS (FROM PROPERTY LINES AND SITE FEATURES)  SITE IMPROVEMENTS  BUILDING  ALLOWABLE BUILDING HEIGHTS

SITE ZONING  STRATEGY  PLAN  NOTE STREET ORIENTATION (FRONT YARD)  DRAW SITE IMPROVEMENT AREA  DRAW BUILDING AREA  SECTION  DRAW GRADE LINE  DRAW BUILDING OUTLINE  TIPS  THERE IS ONE RIGHT SOLUTION  ON A CORNER LOT, THE REAR YARD IS OPPOSITE THE FRONT YARD  USE SKETCH CIRCLES IN PLAN FOR FEATURE SETBACKS  USE SKETCH LINES IN SECTION  USE THE GRID  FOLLOW THE INSTRUCTIONS!!!!  SAMPLE VIGNETTE

SITE ZONING

SITE DESIGN  SUMMARY  SYNTHESIZE PROGRAM, CIRCULATION, ZONING, AND TECHNICAL REQUIREMENTS INTO A COHESIVE AND COMPETENT SITE DESIGN.  INFORMATION PROVIDED  BUILDINGS  TYPE AND NUMBER  ORIENTATION, ACCESS, AND ADJACENCY REQ’S  CIRCULATION  CAR  SERVICE  PEDESTRIAN (INCLUDING PLAZA)  PARKING  NUMBER (STANDARD & HANDICAP)  DIMENSIONS

SITE DESIGN  A QUICK LESSON ON PARKING LAYOUTS  CIRCULATION  SIZING RULES OF THUMB  HANDICAP PARKING

SITE DESIGN  STRATEGY  PLACE ALL SITE ELEMENTS ON SITE TO ASSESS SCALE  LOCATE THE MOST RESTRICTIVE SITE BUILDING FIRST  PLAN PARKING AND VEHICULAR CIRCULATION  PLAN PEDESTRIAN CIRCULATION & PLAZA  CHECK FOR TREE REMOVAL  TIPS  THERE IS MORE THAN ONE RIGHT SOLUTION  SERVICE ACCESS CANNOT BE THROUGH PARKING LOT  DRAW PLAZA AROUND ENTRANCES (KEEP SHAPE SIMPLE)  SAMPLE VIGNETTE

SITE DESIGN

SUMMARY & QUESTIONS

03|01| A.R.E. GRAPHICS SEMINAR BUILDING TECHNOLOGY gray dougherty, assoc. aia

AGENDA  BUILDING PLANNING OVERVIEW0.25 HOURS  BUILDING SECTION0.75 HOURS  STRUCTURAL LAYOUT1.00 HOURS  LUNCH0.75 HOURS  MECHANICAL/ELECTRICAL PLAN0.75 HOURS  ROOF PLAN0.75 HOURS  ACCESSIBILITY/RAMP1.00 HOURS  STAIR DESIGN1.50 HOURS  QUESTIONS0.25 HOURS 7.00 HOURS

BUILDING PLANNING OVERVIEW  BUILDING SECTION60 MINUTES  STRUCTURAL LAYOUT45 MINUTES  ACCESSIBILITY/RAMP45 MINUTES  BREAK15 MINUTES  MECHANICAL/ELECTRICAL PLAN60 MINUTES  STAIR DESIGN60 MINUTES  ROOF PLAN45 MINUTES 6 HOURS WHICH ONE DO I DO FIRST?  CALCULATION INTENSIVE PROBLEMS FIRST (MECH, STAIR)  SHORTER, MORE FINITE PROBLEMS FIRST (SECTION, STRUCTURAL)  DO THE PRACTICE PROBLEMS AND DRAW YOUR OWN CONCLUSIONS.

BUILDING SECTION  SUMMARY  SYNTHESIZE A BUILDING PLAN AND VARIOUS VERTICAL CLEARANCE REQUIREMENTS INTO A BUILDING SECTION  INFORMATION PROVIDED  FIRST AND SECOND FLOOR BACKGROUND FLOOR PLANS  ARCHITECTURAL, STRUCTURAL, AND MECHANICAL COMPONENTS  A SECTION CUT LINE  CLEARANCE AND HEIGHT REQUIREMENTS  A QUICK LESSON ON FOOTINGS

BUILDING SECTION  STRATEGY  DRAW GRADE LINE  DRAW BEARING WALLS, FOOTINGS, AND SLAB ON GRADE  ADD FIRST FLOOR AND DOUBLE HEIGHT CEILINGS  PLACE JOISTS ACCORDING TO LARGEST DUCT COMBINED WITH LIGHT FIXTURE CLEARANCE (BE CAREFUL TO NOTE SIZE AND ORIENTATION)  ADD DUCTS AND PARTITIONS  REPEAT FOR SECOND FLOOR  EXTEND PARAPETS  TIPS  USE THE SKETCH CIRCLE TO MEASURE VERTICAL CLEARANCES  TURN ON THE GRID AND ORTHO  DRAW THE SECTION ON TOP OF THE FLOOR PLAN TO PREVENT SCROLLING  A SLAB ON GRADE MEANS THAT YOU SHOULD DRAW A GRADE LINE AND PUT THE SLAB ON TOP OF THAT LINE  SAMPLE VIGNETTE

BUILDING SECTION

STRUCTURAL LAYOUT  SUMMARY  DESIGN A BASIC STRUCTURAL SUPPORT SYSTEM FOR A GIVEN SET OF FLOOR PLANS  DOES NOT TEST QUANTITATIVE KNOWLEDGE OR COMPUTATIONS  INFORMATION PROVIDED  A LOWER AND UPPER LEVEL FLOOR PLAN  CONSTRUCTION MATERIALS  GENERAL REQUIREMENTS  CLEARANCES  COLUMN FREE SPACES  A QUICK LESSON ON VERTICAL LOAD TRANSFER  DECKING, JOISTS, BEAMS, COLUMNS, AND BEARING WALLS

STRUCTURAL LAYOUT  STRATEGY  START AT THE UPPER FLOOR AND WORK YOUR WAY DOWN  NOTE THE MAXIMUM SPAN OF DECKING AND USE FOR JOIST SPACING  TIPS  READ AND FOLLOW THE INSTRUCTIONS (THIS IS KEY TO ALL BUILDING TECHNOLOGY VIGNETTES)  DO NOT USE BEARING WALLS UNLESS IT IS REQUIRED  COMPUTER GRADING  ALL VERTICAL LOADS MUST BE TRANSFERRED TO THE GROUND  DO NOT SUPPORT COLUMNS, BEARING WALLS, OR BEAMS WITH BEAMS  SUPPORT ALL EDGES OF ROOF DECKING  SAMPLE VIGNETTE

STRUCTURAL LAYOUT

MECHANICAL/ELECTRICAL PLAN  SUMMARY  LAYOUT A REFLECTED CEILING PLAN BASED UPON HVAC AND LIGHTING REQUIREMENTS  INFORMATION PROVIDED  FLOOR PLAN WITH STRUCTURE AND MECHANICAL EQUIPMENT  LIGHTING REQUIREMENTS  HVAC REQUIREMENTS  A QUICK LESSON ON LIGHTING  LIGHT DISTRIBUTION DIAGRAMS

MECHANICAL/ELECTRICAL PLAN  STRATEGY  PLACE CEILINGS IN ROOMS  CALCULATE LIGHTING REQUIREMENTS  PLACE LIGHTING IN CEILINGS  ROUTE RIGID DUCTWORK AND PLACE FIRE DAMPERS  PLACE GRILLS AND DIFFUSERS BASED ON AIR DISTRIBUTION REQ’S  ROUTE FLEXIBLE DUCTWORK  TIPS  USE ONLY ONE TYPE OF LIGHTING FIXTURE PER ROOM  CEILING GRIDS CAN ROTATE  DON’T FORGET FIRE DAMPERS  SAMPLE VIGNETTE

MECHANICAL/ELECTRICAL PLAN

ROOF PLAN  SUMMARY  CREATE A ROOF PLAN BASED UPON CLEARANCE REQUIREMENTS AND OTHER PROGRAM  INFORMATION PROVIDED  ROOF OUTLINES  REQUIRED ROOF SLOPES AND STRUCTURE  CLERESTORY, HVAC, SKYLIGHT, FLASHING, AND OTHER REQ’S

ROOF PLAN  STRATEGY  DRAW CLERESTORY  DRAW ROOF RIDGES  INPUT SLOPES AND ELEVATIONS, ALLOWING FOR CEILING CLEARANCES  PLACE SKYLIGHTS, HVAC EQUIPMENT, PLUMBING STACKS AND VENTS  PLACE ROOF GUTTERS AND DOWN SPOUTS  ADD CRICKETS AND FLASHING (DON’T FORGET THE CHIMNEY)  TIPS  ONLY ADD SKYLIGHTS AND OTHER ELEMENTS WHERE REQUIRED  KEEP ROOFS SIMPLE, MINIMIZE NUMBER AND AVOID DIAGONAL RIDGES IF POSSIBLE  DON’T FORGET TO FLASH THE CHIMNEY AND ADD CRICKETS IF NECESSARY  SAMPLE VIGNETTE

ROOF PLAN

ACCESSIBILITY/RAMP  SUMMARY  CREATE A PLAN TO ACCOMMODATE A SLIGHT GRADE CHANGE USING A STAIR AND RAMP  INFORMATION PROVIDED  FLOOR PLAN  PROGRAM  GENERIC CODE  THIS MAY BE SLIGHTLY DIFFERENT IN YOUR EXAM

ACCESSIBILITY/RAMP  STRATEGY  DETERMINE REQ’D RAMP LENGTH AND NUMBER OF RISERS  DRAW ROUGH RAMPS, STAIRS AND LANDINGS TO USE FOR LAYOUT  ADD SPOT ELEVATIONS TO LANDINGS  ADD HANDRAILS  DRAW IN WALL AND EXIT DOOR  TIPS  HANDRAILS EXTEND 12”  EXIT DOORS IN DIRECTION OF EGRESS TRAVEL  STAIRS AND RAMPS DO NOT REDUCE IN WIDTH IN DIRECTION OF EGRESS  HANDRAILS CAN REDUCE REQ’D WIDTH 4” (ALLOW SPACE TO HOLD)  MINIMIZE NUMBER OF RISERS  ENTRANCE TO RAMP SHOULD BE NEAR ENTRANCE TO STAIR  THERE IS MORE THAN ONE SOLUTION!  SAMPLE VIGNETTE

ACCESSIBILITY/RAMP

STAIR DESIGN  SUMMARY  CREATE A STAIR DESIGN THAT ACCOMMODATES TWO LEVEL CHANGES AND MEETS GENERIC CODE REQUIREMENTS  INFORMATION PROVIDED  TWO FLOOR PLANS  REFERENCE SECTION (SOMETIMES PROVIDED)  PROGRAM  OCCUPANT LOAD  NECESSARY CLEARANCES  GENERIC CODE

STAIR DESIGN  STRATEGY  CALCULATE MINIMUM EXITING WIDTHS  OCCUPANT LOAD  HANDRAIL PROJECTIONS  DETERMINE LENGTH OF STAIRS  DRAW STAIRS AND LANDINGS  ADD SPOT ELEVATIONS  DRAW HANDRAILS  TIPS  CHECK SECTION DOOR HEIGHTS FOR LANDING CLEARANCES  DON’T FORGET DOOR CLEARANCES  USE SKETCH RECTANGLES FOR AREA OF REFUGE  KEEP IT SIMPLE!  SAMPLE VIGNETTE

STAIR DESIGN

SUMMARY & QUESTIONS

03|02| A.R.E. GRAPHICS SEMINAR BUILDING PLANNING gray dougherty, assoc. aia

AGENDA  BUILDING PLANNING OVERVIEW0.25 HOURS  INTERIOR LAYOUT1.75 HOURS  LUNCH0.75 HOURS  SCHEMATIC DESIGN3.50 HOURS  QUESTIONS0.75 HOURS 7.00 HOURS

BUILDING PLANNING OVERVIEW  INTERIOR LAYOUT60 MINUTES  BREAK15 MINUTES  SCHEMATIC DESIGN240 MINUTES 3.75 HOURS YOU CANNOT MOVE BETWEEN SECTIONS!

INTERIOR LAYOUT  SUMMARY  DEVELOP AN INTERIOR PARTITION AND FURNITURE PLAN BASED UPON A GIVEN FLOOR PLAN AND PROGRAM REQUIREMENTS  INFORMATION PROVIDED  FLOOR PLAN  SPACE AND FURNITURE REQUIREMENTS  GENERIC CODE  RELATIVELY SIMPLE  5’ TURNAROUND AND 3’ PATHS OF TRAVEL  A QUICK LESSON ON FURNITURE PLANNING

INTERIOR LAYOUT  STRATEGY  SIZE THE CONFERENCE ROOM  LOCATE ROOMS BASED UPON REQUIRED ADJACENCIES  PLACE ALL REQUIRED FURNITURE NEAR ROOMS (DON’T FORGET ANY)  PLACE FURNITURE AND DOORS IN ROOMS AND ADJUST ACCORDINGLY  TIPS  TOOLS  USE SKETCH CIRCLES FOR CLEARANCES  THE ROTATE TOOL IS KEY  YOU DRAW ROOMS, NOT WALLS (DOORS DISAPPEAR)  ONLY PLACE DOORS WHERE REQUIRED  BE MINDFUL OF DOOR CLEARANCES  DO NOT SWING DOORS INTO RECEPTION  SAMPLE VIGNETTE

INTERIOR LAYOUT

SCHEMATIC DESIGN  SUMMARY  DEVELOP A TWO STORY FLOOR PLAN BASED UPON A GIVEN SITE AND PROGRAM  INFORMATION PROVIDED  SITE PLAN  BUILDING REQUIREMENTS  GENERIC CODE  STAIRS  CORRIDORS (DEAD END, WIDTH)  A QUICK LESSON ON VISUAL PROGRAM ORGANIZATION

SCHEMATIC DESIGN  STRATEGY  SUMMARIZE PROGRAM ON SCRATCH PAPER  ALLOCATE ROOMS TO FLOORS  NOTE ADJACENCIES AND VIEWS  PLACE MAJOR FIRST FLOOR ELEMENTS ON SITE TO ASSESS SCALE  BLOCK OUT FIRST FLOOR  BLOCK OUT SECOND FLOOR (MUST BE WITHIN OUTLINES OF FIRST FLOOR)  REVISIT TO FIRST FLOOR (USE THE LAYERS TOOL)  FINE TUNE WALLS TO ALIGN  VERIFY CORRIDORS ARE WITHIN REQUIRED SQUARE FOOTAGE  VERIFY ROOMS ARE WITHIN SQUARE FOOTAGE TOLERANCE  ONCE SPACE LAYOUT IS SET, ADD DOORS (THEY DISAPPEAR IF YOU MOVE A WALLS)  ADD WINDOWS

SCHEMATIC DESIGN  TIPS  DON’T FIGHT THE PROGRAM (THIS IS NOT A TEST OF CREATIVITY)  KEEP CORRIDORS TIGHT  KEEP ROOMS AS CLOSE TO SQUARE AS POSSIBLE  DON’T WORRY ABOUT THE ELEVATIONS  TOILETS & WALLS DO NOT NEED TO LINE UP BETWEEN FLOORS  AVOID L-SHAPED CORRIDORS IF POSSIBLE  DOUBLE LOAD CORRIDORS IF POSSIBLE  PLACE UTILITY SPACES BETWEEN DOUBLE HIGH SPACE AND CORRIDOR  READ THE INSTRUCTIONS!  SAMPLE VIGNETTE

SCHEMATIC DESIGN

SUMMARY & QUESTIONS