NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,

Slides:



Advertisements
Similar presentations
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Advertisements

1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Protocol Revision Subcommittee Tom Burke July 2, 2013.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Communication Plan for Change in DG Registration Threshold DG Registration Threshold > 1 MW –ERCOT Market Participant –Non-modeled RARF Aggregated unregistered.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Distributed Generation Registration Threshold Protocols Section 16.5 (5) ERCOT Staff DER Workshop June 18, ERCOT Public.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
NPRRs NPRR 681 Clarifications to Dynamic Ratings. This Nodal Protocol Revision Request (NPRR) adds clarification for Dynamic Ratings provided via ICCP.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 NPRR to Clarify RUC Capacity Shortfall Ratio Share Formula.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Protocol Revision Subcommittee Tom Burke June 7, 2012.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
Resource Cost Working Group October 7, 2015 WMS Update.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
Technical Advisory Committee (TAC) update to RMS Kathy Scott January 3, 2013Technical Advisory Committee 1.
Distributed Generation Registration June 30, 2008.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 16, 2007.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
Commercial Operations Subcommittee Meeting April 13, 2010 Update to RMS April 14, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
1 Nodal Stabilization Market Call December 27, 2010.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Protocol Revision Subcommittee Tom Burke January 3, 2013.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Protocol Revision Subcommittee Sandy Morris August 4, 2011.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Generation Adequacy Task Force Meeting April 10, 2014.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
Commercial Operations Subcommittee (COPS) 4/15/2015 Update to RMS 5/5/2015.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
August 25, 2016 TAC Update to COPS
Ancillary Service Trades and Ancillary Service Settlement
Settlement Update Austin Rosel ERCOT October 11, 2017.
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
Presentation transcript:

NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook, the term “commercial operations” has a different meaning to Resource Entities and financial institutions involved in construction and financing of Generation Resources than it does in the context of performance testing by ERCOT for new Generation Resources. This Nodal Protocol Revision Request (NPRR) replaces various terms used to refer to the date on which Generation Resources complete the Resource interconnection process with the proposed defined terms “Commercial Operations Date” and “Resource Commissioning Date” to provide consistency for references to the end of the generation interconnection process. 712NPRR Clarification of RUC Process. This Nodal Protocol Revision Request (NPRR) is submitted to clarify certain language regarding the Reliability Unit Commitment (RUC) process. Section , QSE Request to Decommit Resources in the Adjustment Period, requires a Qualified Scheduling Entity (QSE) that chooses to decommit an otherwise available Resource, for hours other than the Operating Period, to update the Current Operating Plan (COP) indicating the change in Resource Status for future hours. The RUC process detects the change in COP status from On-Line to Off-Line Available in the future hours as a request for decommitment, and ERCOT is required to review all such decommitment requests during each Hourly RUC (HRUC) sequence 713 NPRR Reactive Power Testing Requirements. This Nodal Protocol Revision Request (NPRR) revises the language in Section , Voltage Support Service Qualification, to reference the reactive power testing requirements in the Nodal Operating Guides and reflect the revisions to harmonize the Nodal Protocol requirements with recently approved North American Electric Reliability Corporation (NERC) Reliability Standards. 719NPRR Removal of Trigger and Requirement to Reduce the Distributed Generation (DG) Registration Threshold. This Nodal Protocol Revision Request (NPRR) removes the requirement for ERCOT to reduce the DG registration threshold when the aggregated unregistered installed capacity of DG greater than 50 kW in any one Load Zone reaches 10 MW.

NPRRs 727NPRR Removal of Language Related to NPRR327, State Estimator Data Redaction Methodology. This Nodal Protocol Revision Request (NPRR) removes NPRR327’s grey-boxed language from the Protocols. 730NPRR Elimination of the RUC Behavioral Pricing Rule. This Nodal Protocol Revision Request (NPRR) eliminates the now unnecessary behavioral pricing rule that applies to Reliability Unit Commitment (RUC)- committed units that places all MWs above the Resource’s Low Sustained Limit (LSL) at the RUC floor price of $1,500/MWh. 737NPRR Clarification of SASM Notifications. This Nodal Protocol Revision Request (NPRR) requires ERCOT to provide notification of a Supplemental Ancillary Services Market (SASM) to all Qualified Scheduling Entities (QSEs) by ERCOT Hotline call in addition to the current electronic communication.