New Magnet Technology (for high field) Lucio Rossi CERN INFN - CNS1 future strategy Elba 22 May 2014.

Slides:



Advertisements
Similar presentations
Possible Injection Scheme in the (80 km) TOE: Tunnel Of Everything Lucio Rossi, Attilio Milanese and Davide Tommasini CERN Work of H. Piekarz (FNAL) widely.
Advertisements

Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
E. Todesco DIPOLES FOR HIGH ENERGY LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Bordini, L. Bottura, G. De Rijk, L. Evans, P. Fessia, J.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
Block-coil NbTi dipoles for 6 Tesla Rapid-cycling SuperSPS
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Neutrino Factory Workshop UK Magnet Manufacturing Capability Elwyn Baynham CCLRC Rutherford Appleton Laboratory, UK Elwyn Baynham UKNF Oct 2003.
Innovation with Integrity Klaus Schlenga Washington, March 25, 2015 Bruker response to the FCC specifications.
CD meeting R.Yamada1 Thoughts on 4CD (4 th Concept Detector) Solenoid System based on Alex Mikhailchenko’s Basic Design Ryuji Yamada October 20,
Concept of a hybrid (normal and superconducting) bending magnet based on iron magnetization for km lepton / hadron colliders Attilio Milanese, Lucio.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
The FCC Magnet Program: Challenges and Opportunities for HTS
Towards Nb 3 Sn accelerator magnets, challenges & solutions, history & forecast Shlomo Caspi Superconducting Magnet Group Lawrence Berkeley National Laboratory.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
FCC kick-off meeting a summary for magnets L. Bottura
Eric Prebys, FNAL Snowmass 2013 Community Planning Meeting Fermilab, October 11-13, 2012 Minneapolis.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Magnet design issues & concepts for the new injector P.Fabbricatore INFN-Genova Magnet design issues & concepts for the new injector P.Fabbricatore INFN-Genova,
Prospects for fast ramping superconducting magnets (trans. Lines, FAIR, SPS+, VHE-LHC LER) Visions for the Future of Particle Accelerators CERN 10th -
CERN- KEK about LHC upgrades programs Lucio Rossi 14 December 2011.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
Report from WAMHTS-1 in EuCARD2 CM
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
LARP Collaboration Meeting, April 19, 2007Super-Ferric Fast Cycling SPS – Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac - Motivation.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
HHH From Pipetron to LER: history of a brilliant idea and goal of this workshop Lucio Rossi CERN CARE-HHH workshop on LER CERN -11 October 2006.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
FCC EuroCirCol kick-off,CERN, 3 rd June 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
Tentative conclusions. Beam parameters new parameter sets with acceptable electron cloud & pile-up events 25 ns spacing ultimate beam with low  * - may.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
Closing Session Report
High-Luminosity upgrade of the LHC Physics and Technology Challenges for the Accelerator and the Experiments Burkhard Schmidt, CERN.
Hadron Collider Breakout Session Summary
contribution to the round table discussion
Model magnet test results at FNAL
Accelerator Magnet Technology for future machines
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
CERN Conductor and Cable Development for the 11T Dipole
Procurement of Nb3Sn strand for coils assembled at CERN
New Magnets for the IR How far are we from the HL-LHC Target?
HIGH ENERGY LHC E. Todesco CERN, Geneva Switzerland
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Muon Collider Magnet Technologies/Challenges
Muon Collider SR and IR Magnets
Qingjin XU Institute of High Energy Physics (IHEP),
Presentation transcript:

New Magnet Technology (for high field) Lucio Rossi CERN INFN - CNS1 future strategy Elba 22 May 2014

Main parameter: energy E beam  0.3  R  B L dipole field  2/3 L tunnel LHC (R tunnel = 4.25 km): 0.3  2.8km  8.33T= 7.0 (14)TeV 0.3  2.8km  4.76T= 4.0 (8) TeV 0.3  2.8km  7.74T= 6.5 (13)TeV HE-LHC (same tunnel) 0.3  2.75km  20 T= 16.5 (33) TeV 0.3  2.75km  16 T= 13.2 (26) TeV 0.3  2.75km  11 T= 9.24 (18.5)TeV 0.3  2.75km  9.22=7.75 (15.5)TeV (lattice T) The magnetic field is mainly determined by:  Superconductor (B c, J c )  Coil thickness (  Aturns)  Mechanics (ability to keep the huge e.m. forces) However other parameters play a key role: – Magnetic design (optimization) – Stability and Protection – Magnet aperture (SSC! ) beyond 11 T one needs to change Injector (SPS  PS  Booster) 22 May CSN1 Elba2

LHC is the summit of 30 years of SC magnets 22 May CSN1 Elba3

LHC: 300,000 km of SC wires 180,000,000 km of NbTi filaments 22 May CSN1 Elba4 Developing SC is the key in SC accelerators. The perfection of LHC superconductor (thanks also to SSC R&D) is such that we basically «forget» the SC effects Developing SC is the key in SC accelerators. The perfection of LHC superconductor (thanks also to SSC R&D) is such that we basically «forget» the SC effects 6-7  m filament, to limit persisitent currents at injection

Main dipoles: what we can reach? 22 May CSN1 Elba5 Looking at performance offered by practical SC, considering tunnel size and basic engineering (forces, stresses, energy) the practical limits is around 20 T. Such a challange is similar to a 40 T solenoid (  -C)

22 May CSN1 Elba6 Nb-Ti operating dipoles; Nb3Sn cos test dipoles Nb3Sn block test dipoles Nb3Sn cos LARP QUADs

DS collimators ions – 11 T 22 May CSN1 Elba7 11 T Nb 3 Sn Recommended by the Collimation Review

DS collimation 11 T – P7 22 May CSN1 Elba8 11 T Nb 3 Sn Colimation review: preparare and then check real need during Run II

Milestones 11 T Aug. 2010: seminar Rossi at FNAL, proposing the 11 T as part of their GARD October 2010: start of 11 T project in FNAL First test : June 2012 Third test : May 2014 CERN first test : Oct 2014 First twin magents by FNAL : end 2014 First long magnet (5.5 m) CERN: 2016/17 22 May CSN1 Elba9

Quench perfomance 11 1T 22 May CSN1 Elba10 MBHSP01: – limited quench performance – B max =10.4 T at 1.9 K, 50A/s – 78% of SSL – strong ramp rate sensitivity – holding quenches MBHSP02: – improved quench performance – B max =11.7 T at 1.9 K – 97.5% of B des =12 T – low ramp rate sensitivity – holding quenches MBHSM01: o B max =12.5 T at 1.9 K o ~100 (97)% at 4.5 (1.9) K of SSL o low ramp rate sensitivity o no holding quenches MBHSP03: test in progress MBHSP01 MBHSP02, 03 MBHSM01

The Superconductor « space » 22 May CSN1 Elba11 Nb-Ti Nb 3 Sn HTS

The « new » materials 1 – Nb3Sn Recent 23.4 T (1 GHz) NMR Magnet for spectroscopy in Nb 3 Sn (and Nb-Ti) t/y for NMR and HF solenoids. Experimental MRI is taking off ITER: 500 t in ! It is comparable to LHC! HEP ITD (Internal Tin Diffusion): – High Jc., 3xJc ITER – Large filament (50 µm), large coupling current... – Cost is 5 times LHC Nb-Ti 22 May CSN1 Elba mm, 108/127 stack RRP from Oxford OST 1 mm, 192 tubes PIT from Bruker EAS

The successful cable as result of 5 –y R&D (FP6-CARE-NED) 1.25 mm PIT strand, 14 CERN May CSN1 Elba13 Thermo-magnetic instability and FQ issues will continue to play a major role. However the route is traced and we can expect that in the next 5-6 years,also thanks to HiLumi R&D and industrialization, Nb 3 Sn for HEP will be consolidated.

CERN Program Nb 3 Sn HiLumi: consolidate cable by 2014 and magnet desing – perfomance at T by 2016 Hilumi magnets has high quality only at collision FCC: launch conductor R&D now for new generation Design T dipole (small aperture) now, first model by 2018? HTS Started basic R&D (Eucard2) Explore the parameter space Demonstrate technical feasibility (the equivalent of LARP program for Nb3Sn) by 2018 Cost reduction program (2020) Design and test accelerator magnets by HTS will be needed for HE-LHC or FCC at least in some regions of the accelerator. Boost % in energy. 22 May CSN1 Elba14

Defferent shapes (field optimization & structure) 22 May CSN1 Elba15 Cos Coil Bloc Coil Canted Solenoid Coil

First consistent cross section, 2010 WG and Malta (fits our tunnel) 22 May CSN1 Elba16 Magnet design: 40 mm bore (depends on injection energy: > 1 Tev) Very challenging but feasable: 300 mm inter-beam; anticoils to reduce flux Approximately 2.5 times more SC than LHC: 3000 tonnes! Multiple powering in the same magnet for FQ (and more sectioning for energy) Magnet design: 40 mm bore (depends on injection energy: > 1 Tev) Very challenging but feasable: 300 mm inter-beam; anticoils to reduce flux Approximately 2.5 times more SC than LHC: 3000 tonnes! Multiple powering in the same magnet for FQ (and more sectioning for energy) L. Rossi and E. Todesco

LHC, the construction timeline: a 25 year old project 22 May CSN1 Elba17

What is the possibile for HE-LHC? (done in 2011) 22 May CSN1 Elba US 16 T small dipole EuCARD 13 T large dipole+ 18 T small insert US 13 T Quads FP7-HiLumi US NbSn-HTS development T dip final proto & Industrialization Final delivery Magnets HE-LHC HE-LHC start-up HE-LHC preliminary study HTS for HE-LHC: yes.or.no LARP 11 T long quad EuCARD R&D Industry contracts, start constrution US basic programs and LARP R&D EU FP6-CARE-NED EuCARD2 full bore dipole HTS T R&D dipole models and prototypes Full profit of the HiLumi program

Rough cost rough evalution (personal) LHC (machine): about 3.2 BCHF, 1.7 BCHF for the magnet system, HE-LHC: The non-magnet is  same 1.4 BCHF – Nb3Sn based (26 TeV c.o.m) :  3.5 BCHF ( for a total of BCHF for th whole machine + inj renewal)) – Nb3Sn based (18 TeV c.om.):  BCH (for total of 4.5 BCHF for whole LHC ring+ inj. renewal). – HTS based (33 TeV c.o.m) :  5 BCHF (for a total of for the whole machine + inj renewal) – Ecomomy could be made:Cryo and other system needs only renovation; however one should consider the cost of LHC removal) 22 May CSN1 Elba19

Other important issues (among many …) Synchrotron radiation 15 to 30 times! The best is to use a window given by vacuum stability at around K (gain a factor 15 in cryopower removal!) First study on beam impedance seems positive but to be verified carefully Use of HTS coating on beam screen? Beam in & out Both injection and beam dump region are constraints. Ideally one would need twice stronger kickers Beam dumps seems feasable by incresing rise time from 3 to 5  s Injection would strongly benefit form stronger kckers otherwise a new lay-out is needed (different with or wihtout experiments) 22 May CSN1 Elba20

Injector chain Various reason to renew Age! PS 80 years old by 2039 SPS will have seen an amount of radiation well beyond its design Chance to redign the chain in synergy with other programs – Low energy physics – Neutrino SPS+ (1-1.2 TeV) R&D is progressing thanks to FAIR SIS300 design. Discorap INFN magnet, 4.5 T pulsed at 1-2 T/s, test in July 22 May CSN1 Elba21

Between Linac4 and SPS+ 22 May CSN1 Elba22 HE-LHC Linac4 SPS+ New injectors optimization

Alternate scenarios Injectors Avoid touching the SPS Install a Low Energy Ring in the LHC tunnel using superferric Pipetron magnets (W. Foster). Possible with adequate logistic and change inthe experiment (workshop 2006 FP6-CARE-HHH network, revisited for LHeC ring-ring option). Work done in colalbporation with Fermilab (H. Piekartz) 22 May CSN1 Elba23