LC14 Statement Oliver Day UKPN (on behalf of DNOs) 1 | Energy Networks Association 1 December 2011.

Slides:



Advertisements
Similar presentations
What is an M and E Plan?. Organizing the Work of M and E An M and E System -- the 12 components as a whole – Sets out broad vision at national level An.
Advertisements

Update on IDNO/DNO working group DCMF 12 November 2009.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
EDCM update Mo Sukumaran (on behalf of CMG)
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Update from DCUSA DCUSA Secretariat 16 August | Energy Networks Association - DCMF.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
Distribution Charging Methodologies Forum (DCMF) 27 th DCMF Institute of Physics London 01 December | Energy Networks Association.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 14 June | Energy Networks.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
BSBPMG504A Manage Project Costs 7.2 Determine Budget Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of aggregating.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
Recent PSD Experiences in SWRO Regulatory & Statutory Requirements Relationship with EPA Federal Land Managers - FLAG Appeals.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
Standard Contract Forum 2 September 2004 Charles Walker 2 September 04.
DCUSA Update ElectraLink. The following Change Report are due to be presented to the DCUSA Panel at its meeting on Wednesday 16 January 2013: DCP 143.
Market Credit Working Group update to the Wholesale Market Subcommittee 04/06/
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Task XV Extension: Task Status Report Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting New Delhi,
COPS Communication Working Group Conference call on 3/8/05 from 1:00 – 2:00 Reviewed scope document and 2005 Goals Reviewed Notification Template.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Water and Wastewater Five Year Rate Schedules City Council Meeting May 13, 2008.
Market Operations Standing Committee March 5, 2003.
DCMF SIG terms of reference Harvey Jones Elizabeth Lawlor 2 December | Energy Networks Association - DCMF.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 02 February | Energy Networks Association - DCMF.
Structure of Charges: Update and next steps DCMF 10 September 2008.
INTRODUCTION TO DOCUMENT AUTHORING AND ELECTRONIC PUBLISHING.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
IEEE Input for the Regulatory SC Mission Statement
CMG and Workstream Update
Overview of Documents for Third Earth Observation Summit
IEEE Input for the Regulatory SC Mission Statement Rich Kennedy
Fleet Charge.
IEEE 802 Newsletter Date: 14-Nov-06 Authors: November 2006 Month Year
doc.: IEEE <doc#>
Registration Process for new messages
Fast Track Maintenance Process (for existing messages)
Yearly Maintenance Process (for existing messages)
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Exit Capacity Substitution and Revision
Generation Dominated Areas(GDA)
doc.: IEEE <doc#>
Key movements from September 17
IEEE Input for the Regulatory SC Mission Statement Rich Kennedy
OCC & Standard Commodity Changes
SHQ Review Process Update
November 2018 Opening Report
Incremental Entry Capacity Release Methodology Statement
Registration Process for new message variants
YEAR 9 – GCSE Business HT 1 (3rd September – Friday 25th October, weeks) HT 2 Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 HOLIDAY Wk9 HT 2 (4th.
Presentation transcript:

LC14 Statement Oliver Day UKPN (on behalf of DNOs) 1 | Energy Networks Association 1 December 2011

UoS Charging Statement Industry sub-group established to review UoS statement. Group developed a second statement option. Mini-consultation held to identify stakeholder preference between options 1 and responses received all in favour of 2 option. 2 | Energy Networks Association 1 December 2011

Option 2 Restructured document to provide better clarity and improve organisation of wording. Statement updated for EDCM import charge changes. Schedule of charges tables placed in an annex to the statement. Spreadsheet with charge tables will also be provided. These are intended to mirror the tables in the model. 3 | Energy Networks Association 1 December 2011

Next Steps Statements are now being prepared by DNOs. These will need to be individually ‘form’ approved by the Authority for each DNO area. The three month notices of the April price change will be issued towards the end December. Receipt of form approval for the published charging statement is required before 1 April | Energy Networks Association 1 December 2011