Pismo Beach City Council San Luis Obispo Council of Governments April 5, 2011 Focused Public Opinion Poll & Supplemental Funding Assessment Item 8.B.

Slides:



Advertisements
Similar presentations
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Advertisements

Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
TBITE 05/15/ Heather Sobush, Senior Planner Christopher Cochran, Senior Planner
Wisconsin Transportation Finance and Policy Commission Freight Rail Day 2012 October 26, 2012.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
1 Measure M Investment Plan Update. 2 Measure M: A Contract With the Voters Approved by 55 percent of voters in November 1990 after two failures One-half.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
US 101 Corridor Mobility Master Plan Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1.
April 8, 2008 Dakota County Regional Chamber of Commerce Dakota County Transportation Update.
Colorado Transportation Finance and Implementation Panel Overview Fort Morgan,Colorado September 13, 2007.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
1 6-Year Transportation Improvement Program ( ) Kit Baker, Chair ( Citizen’s Transportation Advisory Committee ) Desiree’ Winkler, P.E. ( Transportation.
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
1 S.R. 426/C.R. 419 Project Update City Council Work Session November 13, 2006.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
Workshop Presentation for Canyon County Jurisdictions for Canyon County Jurisdictions Corridor Management Plan.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
Dianne Steinhauser Executive Director Program and Project Delivery Marin County April 9, 2010.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
A New Regional Vision ASPA Conference April 2010 Steve Heminger, MTC Executive Director.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
Transportation Program Status Orange County Transportation OCBC Infrastructure Committee Meeting April 14, 2009 Kia Mortazavi, OCTA, Executive Director,
2006 Annual Report on the Status of the Implementation of Proposition 400 Management Committee 9/6/06.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
The Transit “T” Craig Lamothe UPA Transit Project Manager City of Minneapolis City of Lakes Innovative Choices for Congestion Relief.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
0 Regional Measure 2: Capital Program Update May 12, 2010 Programming and Allocations.
Transportation Investment Act of 2010 AASHTO/MTAP Conference December 6-9, 2010 Savannah, Georgia Steve Kish, Transit Program Manager Georgia Department.
Local Pots of Gold Local Pots of Gold Maintaining Fiscal Constraint for Local Funds in the TIP Srikalyani Srinivasan Metropolitan Transportation Commission.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
Lakes Region Transportation Workshop November 15, 2013.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
BUDGET WORKSHOP FY13 April 4, City of Hendersonville Budget Workshop – April 4, 2012 GOALS and OBJECTIVES for 2013 To present a balanced budget.
Orht I-5 North Coast Corridor Project CA Transportation Planning Conference – New Directions in Planning Integrating Resource and Infrastructure Plans.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Active Transportation Program California Transportation Commission Mitch Weiss 01/14/141.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
CITY OF FLAGSTAFF – PROP. 406 ROAD REPAIR AND STREET SAFETY 1.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Next Steps.  To begin Planning Council discussion about the MPO’s Next Steps. Now that the 2035 Regional Transportation Plan has been updated and adopted,
1 City Council Work Session September 24, 2012 State of Transportation in San Leandro.
DESTINATION 2030 Regional Local Personal Adopted May 24, 2001.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
Meaningful Public Input for…
21st Century Transportation Committee Finance Subcommittee
Capital Improvement Program
SANDY SPRINGS CITY COUNCIL MEETING
Interlocal Cooperative Agreement FY 20
Presentation transcript:

Pismo Beach City Council San Luis Obispo Council of Governments April 5, 2011 Focused Public Opinion Poll & Supplemental Funding Assessment Item 8.B

Who We Are SLOCOG BOARD 12 Members 1 from each City Council (7) Board of Supervisors (5) 3 Advisory Committees  Technical (City/Co./Caltrans)  Citizens (appointed by Board)  Social Services (Transit focus) San Luis Obispo Council Of Governments Responsibilities: Planning Programming $ Services

Planning Regional Transportation Plan Regional Transportation Plan Timeframe: 25 Years Timeframe: 25 Years Projected Funding: $1.8B optimistically expected Projected Funding: $1.8B optimistically expected Improvements to: Improvements to: Highways Highways Downtown Corridors Downtown Corridors Major Roads Major Roads Bikes Bikes Transit Transit Road Maintenance (local $ only) Road Maintenance (local $ only) Ridesharing Ridesharing Corridor Plans and Special Studies Corridor Plans and Special Studies

Local Transportation Fund Passenger Fares Gas Tax Subventions Prop 42 (local) General Fund Sales Tax Developer Fees ITIP & Reauthorization Transit 53’s Other STP Other RTIP $1.8 B 2010 RTP Projected Revenue $3B Shortfall

Widenings, Realignments, and Auxiliary Lanes Cuesta Grade Widening Cuesta Grade Widening 41 realignment and bridge (Atascadero) 41 realignment and bridge (Atascadero) 101 Aux / Climbing Lanes (4) (Pismo Beach / Arroyo Grande) 101 Aux / Climbing Lanes (4) (Pismo Beach / Arroyo Grande) 101 Aux Lanes (SLO City: Madonna to Marsh) 101 Aux Lanes (SLO City: Madonna to Marsh)Interchanges 101/41 (Atascadero) 101/41 (Atascadero) 101 / Willow (funded with ARRA) Nipomo 101 / Willow (funded with ARRA) Nipomo 101 / Tefft (Nipomo) 101 / Tefft (Nipomo) 101 / Oak Park (PB/AG/GB) 101 / Oak Park (PB/AG/GB) 101 / 4th St. (Pismo Beach) 101 / 4th St. (Pismo Beach) 101 / LOVR (funded, but delayed) SLO city 101 / LOVR (funded, but delayed) SLO city 101 / 46E (Paso Robles) 101 / 46E (Paso Robles) 101 / 46W Phase 1 (Paso Robles). 101 / 46W Phase 1 (Paso Robles). Highway Accomplishments

2010 RTP Projected Revenues Highway Improvements Does not include any $ necessary to widen 101 to 6-lanes PROJECT CANDIDATES 101/Brisco/Grand Interchange (Arroyo Grande) SB 101 Oak Park to Halcyon Climbing lane (Arroyo Grande)

Streetscapes and landscaped medians Streetscapes and landscaped medians Class II bike lanes Class II bike lanes Shoulders Shoulders Left and right turn pockets Left and right turn pockets Capacity projects Capacity projects Operational improvements Operational improvements Roundabouts and Intersection improvements Roundabouts and Intersection improvements Road and Frontage extensions Road and Frontage extensions Regional Route Accomplishments Recently completed Price St. Erosion Control 4 th St. Drainage, Sidewalks, Bike lanes

2010 RTP Projected Revenues Regional Routes $650M+ requested 25% ($161M ) available 75% unfundable. PROJECT CANDIDATES Price Cyn Shoulders/Bikelane widening Price St. Erosion Control: Long term stabilization Shell Beach Rd Improvements ($: 13/14) Hinds Ave. Bridge widening Inland arterial: Oak Park to Price Cyn Rd

Boardwalks Boardwalks Promenades Promenades Multi-Use Trails Multi-Use Trails Recreational Class I Trails Recreational Class I Trails Park and Ride Lots Park and Ride Lots Land Acquisitions Land Acquisitions Non-Motorized Accomplishments Recently completed Promenades Phase 1, Phase 2, Phase 3, Phase 4a and 4b Dinosaur Caves Park Sidewalks Pismo Lakes purchase

PROJECT CANDIDATES Pismo Creek / Anza Trail Segments Replace Bello St. Historic Bridge Class 1 Bicycle gap closure (PD$) Route 101 underpass Class 1 Path: Cave Landing Road North Promenade phases Other Bike Plan Needs 2010 RTP Projected Revenues Non-Motorized $600M+ requested 21% ($128M ) available 79% unfundable

Ridesharing Grover Beach Rail Station Transit Bus Aviation Services Recently completed South County Transit Hub South County Transit Hub Bus Stop Improvements Bus Stop Improvements Prime Outlets Park & Ride Prime Outlets Park & Ride Public Transit Accomplishments

2010 RTP Projected Revenues Transit Past 20 years, transit services doubled in the region. $540M for Transit purposes No doubling of service in the next 25 years is possible 45% increase of regional transit services and 8% expansion of local fixed routes. 1% expansion of Paratransit PROJECT CANDIDATES Grover Beach Train Station ExpansionGrover Beach Train Station Expansion SCAT ExpansionSCAT Expansion Pismo Beach Park & Ride lot(s)Pismo Beach Park & Ride lot(s)

2010 RTP Projected Revenues Road Maintenance $1.1B identified as needed to improve ALL local roads. $624M assumed. On average, expectation was minimal improvement. Some jurisdictions would see improvement Some would see further degradation Some Jurisdictions faced with need to reconstruct large part of road system, However, any redirection of ‘General Funds’ to other programs or Local Transportation Funds to Public Transit WILL result in degrading conditions.

CTC 2010 Annual Report Key Findings State’s transportation system continues to deteriorate State’s transportation system continues to deteriorate Federal Highway Trust Fund is insolvent Federal Highway Trust Fund is insolvent SB 375 requires funding to succeed SB 375 requires funding to succeed State Focus: State Focus: Innovative financing Innovative financing Innovative project delivery Innovative project delivery New revenue sources needed, but None Are Recommended New revenue sources needed, but None Are Recommended

SHA = State Highway Account TCRF = Traffic Congestion Relief Fund TE = Transportation Enhancements TIF = Transportation Improvement Fund P1B = Proposition 1B SHA Prop 1B Our Fiscal Challenges

Local Transportation Fund Passenger Fares Gas Tax Subventions Prop 42 (local) General Fund Sales Tax Developer Fees ITIP & Reauthorization Transit 53’s Other STP Other RTIP $1.8 B Major Inter- Regional Highways Highways RoadMaintenance Transit Bike & Ped Downtown Enhancements Major Roads 2010 RTP Projected Revenue Reductions

SHA Prop 1B Our Fiscal Challenges Transit: $11M/year $6M/yr stable; $5M/yr unstable Highways: Past $15M/year Now $6M/yr Interchange Example (41/101) Programmed 1998: $8M Delivered 2010: $30M

Implications: Reduced Funding Inability to deliver planned transportation improvements, maintain current services, or repair roads. Transportation Impacts Increasing Congestion, More Bottlenecks, More Potholes Quality of Life: Livability/Walkability/Tourist-oriented projects: Downtown and Corridor enhancements Bikeways / Promenades Economic Impacts Engineering and Construction jobs Engineering and Construction jobs Loss of Public $ to match developer funding Loss of Public $ to match developer funding

Pre 2010 Transportation Measures 19 Counties (85% of State’s Population) passed. 8 Counties tried but failed to achieve 2/3rds voter support. MontereyKings VenturaMerced Santa CruzSolano KernStanislaus 2010 Vehicle License Fee increase 5 (of 7) Counties passed by majority vote Supplemental Funding: Other Regions 70% 67% 84% 79% 68% 2008 Results Transportation Funding: Statewide: $200M/yr Self-Help Co.s: $2.5B/yr

SLOCOG Board: Jan., 2011 SLOCOG Board presented with two options: Continue to pursue State and Federal funding and prioritize limited funding for programming (Live with less) Or Poll the public to identify investment priorities and opportunities for supplemental funding.

Next Steps Select a Consultant Select a Consultant Meet with Stakeholder groups Meet with Stakeholder groups Identify key Identify key Projects / Programs / Services Projects / Programs / Services Supplemental Funding options include: Supplemental Funding options include: Regional Impact Fees Regional Impact Fees Local Option Gas Tax Local Option Gas Tax Local Option Sales Tax Local Option Sales Tax Vehicle Registration Fees Vehicle Registration Fees Polling Polling Develop Results and Findings Develop Results and Findings

Pismo Beach City Council San Luis Obispo Council of Governments April 5, 2011 Focused Public Opinion Poll & Supplemental Funding Assessment

All PB City: 2010 RTP projects Recently completed Recently completed Price St. Erosion Control Price St. Erosion Control Promenades 1, 2, 3, 4a, 4b Promenades 1, 2, 3, 4a, 4b Pismo Lakes purchase? Pismo Lakes purchase? Dinosaur Caves Park Dinosaur Caves Park Shell Beach Bike Lanes Shell Beach Bike Lanes 4 th St. Interchange 4 th St. Interchange Oak Park Interchange Oak Park Interchange Prime Outlets ramps Prime Outlets ramps 4 th St. Drainage, Sidewalks, Bikelanes 4 th St. Drainage, Sidewalks, Bikelanes PnR – Prime Outlets PnR – Prime Outlets FNYC FNYC Pismo Creek / Anza Trail gap closure (Proj. Devel. funding recommended) Pismo Creek / Anza Trail gap closure (Proj. Devel. funding recommended) Shell Beach Rd Improvements Shell Beach Rd Improvements Highway Improvements (PISMO) Highway Improvements (PISMO) Price St. Extension (frontage road to 101) with Hinds Overcrossing – Unconstrained Price St. Extension (frontage road to 101) with Hinds Overcrossing – Unconstrained RORS Improvements New N/S inland arterial w/ bike lanes north of 101 from Oak Park Blvd to Price Canyon Road – Unconstrained Long term stabilization features for erosion control below Price Street – Unconstrained Shell Beach Rd Improvements Park n Ride Lots In Price Canyon area - Mid North of Dolliver - Long Non-Motorized Pismo Creek / Anza Trail Segments Replace Bello St. Historic Bridge Class 1 Bicycle gap closure Route 101 underpass Class 1 Path: Cave Landing Road North Promenade phases Other Bike Plan Needs SCAT expansion