Southeast LDC Gas Forum Infrastructure Updates… Expanding Your Distribution Network Beyond the Pipeline April 12, 2016 Atlanta, Georgia David Lavoie Vice.

Slides:



Advertisements
Similar presentations
Water Utility Business Applications. 2 Agenda Industry overview and trends Our application visionary solution Business values Wireless network components.
Advertisements

Methane Capture and Use: Current Practices vs. Future Possibilities.
The Gas Advantage ! Information contained in this document is the intellectual property of Venus Gas Products & Services (Mysore) Pvt. Ltd. (VGPSPL) and.
1. 1. Compressor site on pipeline2. Delivered in composite containers 3. Customer Off-Load Station4. Empty trailers return for refilling How Does.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
Thermostats, Pressure Switches, and Other Electric Control Devices
PROSPERING IN A CARBON CONSTRAINED ECONOMY & ADAPTING TO CLIMATE IMPACTS JULIE HARRISON FEBRUARY 24, 2010.
Energy Efficiency Lighting Sponsor: Presentation by: Allan Grant, VP Business Development, Corvus Energy Topic:Advanced Energy Storage Solutions as a Key.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
John B. Wharton, PE Technical Executive Baltimore, Maryland October 16, 2013 Perspectives on Grid-Integrated Microgrids Maryland Clean Energy Summit.
SMALL SCALE LNG PROSPECTS
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
FiberCo/WaveCo Update Joint Techs February 12, 2007 Minneapolis, Minnesota.
IntelliGrid: Enabling The Power Delivery System of the Future Don Von Dollen EPRI IntelliGrid Program 9th International Symposium on Power- Line Communications.
Supply Chain Management
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Solutions for Flaring & Venting CNG Marine Transportation
Mark Kempic President Columbia Gas of Maryland, Inc. Maryland-District of Columbia Utilities Association Fall Conference Fueling the Economic Engine.
Terry Chandler Power Quality Inc, USA Power Quality Thailand LTD Sept /6/20091www.powerquality.org all rights reserve.
2015 World Forum on Energy Regulation May 25, 2015
Gas supply and infrastructure – New South Wales APA Group presentation – Energy Forum Armidale 17 th Aug 2012.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 Draft Policy Note 4 : Policy Support for the Development of Domestic Gas Markets.
Dubai, 2 nd – 3 rd November, 2014 Operational Aspects to ensure the Quality of Service provision in Telecommunication/ICT market Louisa Ama Sosu, Vice-Chair.
Confidential Project Update: District of Chetwynd Bruce Wells, Vice President, Project Development February 02, 2015.
The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use, reproduction or.
The Evolving Roles and Responsibilities of Gas Utilities In Today’s Markets Presented by: Hank Linginfelter Executive Vice President, Utility Operations.
Don’t Scrub When You Can Be Clean A Mobile CNG Pipeline Operational in 6-12 months Low capital expense Relatively short contract duration Phased-in approach.
Development of Micro-Hydro Projects Stacey Simms Associate Director, Programs CREA Energy Innovations Summit.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
Rick Allison – Chief Engineer, Enercon Engineering Presented by Lawrence Tangel V.P. Enercon Engineering Chairman of USCHPA NON TRADITIONAL METERING flkjsflkfjl.
New Hampshire Energy Summit Rich Paglia President, Maritimes & Northeast Pipeline Vice President, Marketing New England Pipeline Expansion Update.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
WINTER PREPAREDNESS PLAN ALLIANT GAS. Alliant Gas is the propane gas company that operates as a regulated utility in the towns of Payson and.
Energy Security Powered by Microgrid Infrastructure Presented By: Colin Kelly Principal Distributed Energy Development Improving energy infrastructure.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
Biomethane and the European gas infrastructure EBA Workshop 3 September 2015 Thierry Deschuyteneer Executive Secretary.
Alameda Power & Telecom An Enterprise of the City of Alameda ENTERING THE BROADBAND BUSINESS.
IEA Bioenergy Conference 2015 UK Biomethane Market Update 50 Plants Injecting Gas by End th October 2015 John Baldwin Managing Director CNG.
Who Pays for Safety? Who Should? November 19, 2015.
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
Business Process Mapping “Power Sector - Distribution”
HRM Council Environment & Sustainability Standing Committee July 7, 2011.
- DISCOVER THE DIFFERENCE - Florida’s Natural Energy - DISCOVER THE DIFFERENCE -
Compressed Air Energy Storage (CAES) Wind Integration Study Team September 10, 2009.
Boiler Operations, Maintenance and Performance Conference.
London 2062 Symposium London’s Energy Future Peter North 19 th March 2012.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
1 cleanenergyfuels.com State of Louisiana Briefing LNG Vehicle Fueling & Infrastructure Greg Roche Director of Business Development (562) 493 – 2804
Bringing Natural Gas to North Dakota EDND Summer Conference Doug Lee – CEO – Progress Solutions June 22, 2016.
Billy MaloneSWANA TDIBR Landfills DeKalb County Sanitation Board Clean Cities-GA Sanitation Director.
. com Page 1 ENRON.COM Sketches for New Services Area May 18, 2000 *This presentation includes sample content from the Energy Transportation Services area.
BROADBAND STATUS UPDATE January 31, County-Wide Broadband Study Long-standing need in the County for better telecommunications services Coverage,
Community Solar Dan McIlroy Clean Energy Collective.
Karratha, WA 3rd November 2016
North Georgia Water Resources Partnership
TriFuel Alternative Fueling Stations
Uniper Energy Services
Expanding Your Distribution Network Beyond the Transmission Pipeline
FiberCo/WaveCo Update
Infrastructure & Safety
Expanding Your Distribution Network Beyond the Transmission Pipeline
October 9, 2014 Kenneth W. Yagelski Managing Director Gas Supply
Compressed Natural Gas Supply Vehicles
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Christian Rodrigues 2nd period poe
Meeting the challenge: Electrification and Climate Change
Presentation transcript:

Southeast LDC Gas Forum Infrastructure Updates… Expanding Your Distribution Network Beyond the Pipeline April 12, 2016 Atlanta, Georgia David Lavoie Vice President, Business Development NG Advantage LLC 1

What is a Virtual Pipeline? 2 Compressor site takes gas from transmission pipeline and gas loaded into tube trailers 40’ trailer hauls CNG housed in carbon-fiber cylinders to offloading station Industrial customer has offloading station installed onsite

What is a Gas Island? Isolated distribution network of pipeline routed to industrial, commercial, and residential users within a defined area Compressed natural gas is delivered to the offloading station via “virtual pipeline”  Compressed natural gas delivered by tractor trailers 24/7 Distribution network connects to offloading station that serves end user  Owned and operated by LDC 3

4

Gas Island Partnership Virtual pipeline service provider not interested in being a regulated utility LDC constructs, owns, and operates the gas island distribution loop LDC maintains relationship with customer, including direct billing 5

Gas Island Partnership Virtual pipeline service provider constructs and operates the offloading station  LDC or virtual pipeline service provider may own offloading station Virtual pipeline partner provides service 24/7 When or if gas island is connected to the rest of the network, offloading station and associated equipment are removed 6

Why Build a Gas Island? Serve new customers in advance of planned pipeline extension Distribute to new customers not feasible to serve with traditional pipeline extension Encourage economic development and preserve jobs 7

Why Build a Gas Island? Generate revenue from customers in advance of pipeline construction Fast time to market Lower capital costs 8

First-in-the-Nation Gas Island Vermont Gas Systems (VGS) partnered with NG Advantage (NGA) to develop a local distribution network in advance of their planned pipeline extension Impetus to build remote network – feedback from potential, new customers VGS planned, obtained necessary permits, and built their network in less than a year Launched in Middlebury, Vermont in

First-in-the-Nation Gas Island NGA procures natural gas from VGS and transports it to offloading site VGS bills customers and maintains direct relationship with them Almost six miles of low pressure piping connect a large dairy processing cooperative, a hard cider producer, a college, and hospital 10

What are the Logistical Challenges? Capital investment  $ 5,000,000 - $10,000,000 per compressor station  $500,000 for carbon fiber trailer Optimizing trailer capacity when filling trailers in heat and cold Emptying trailers completely Managing just-in-time routing of trailers 11

What are the Technological Challenges? Sophisticated real-time data management requirements  SCADA tools for knowing when trailer is full or empty and when system needs to switch over to 2 nd trailer  Telemetry on trucks and compressors  Telemetry to monitor customer sites  Video to monitor and assist drivers 12

What are the Reliability Challenges? Guarantee of firm service Adequate storage to cover several days of operation  CNG, LNG Redundancy Backup supply contingent upon requirements of customer base 13

Thank You Southeast LDC Gas Forum PresenterDavid Lavoie Vice President, Business Development