Jump Vehicle Details Ping Pong Productions. Design Strategy Start with an already proven vehicle concept Improve upon it with modern technology Allow.

Slides:



Advertisements
Similar presentations
UF Hybrid Rocket Teams Mile High Club Brought to you by Chris Leonard, Ty Morton, Sam Darr, and Josh Childs.
Advertisements

BYU Rocket Team Special thanks to:
Physiology of Flight Objective: Know the protective equipment used in actual flight.
PANTHR Hybrid Rocket Final Design Review December 6 th 2006.
Preliminary Design Review. Rocket & Payload Schematic.
Northwestern University Space Technology and Rocketry Society (NUSTARS) NASA Student Launch Flight Readiness Review March 16, 2015.
UAA Rocketry PDR Presentation NASA Student Launch
Blue Origin AIAA Civil Space Symposium Huntsville, Alabama
Student Launch Project Preliminary Design Review January 10, 2014.
Illinois Space Society Tech Team USLI CDR Presentation.
Model Rocketry Mr. Capella Technology Education. Parts of a Model Rocket n Nose cone n Body tube n Fins n Launch lug
Title: Intro to Water Bottle Rockets
Project Λscension. Vehicle Dimensions Weight: 19.6 Ib Length: in (9 ft. 4.5 in) Diameter: 6 in Fin Semi-Span: 6 in.
St. Vincent – St. Mary CDR Presentation NASA Student Launch Initiative.
St. Vincent – St. Mary FRR Presentation NASA Student Launch Initiative.
UAA Rocketry Critical Design Review Presentation.
NASA SLI 2010 Mulberry Grove High School Flight Readiness Review Measurement of UVB Radiation Absorption by Cloth Material at Different Altitudes and Measurement.
Student Launch Project Critical Design Review February 28, 2014.
Century College Digital Fabrications Lab White Bear Lake, Minnesota Fab9 Yokohama August 21, 2013.
Flight Readiness Review. Intimidator 5: 5” diameter, 10’ length, 47 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude 5203’- RockSim.
Critical Design Review. Intimidator 5: 5” diameter, 10’ length, 45 lbs  Motor: Aerotech L1300R 4556 N-Sec of impulse  Predicted altitude RockSim.
Rocket Based Deployable Data Network University of New Hampshire Rocket Cats Collin Huston, Brian Gray, Joe Paulo, Shane Hedlund, Sheldon McKinley, Fred.
Intercollegiate Rocket Engineering Competition Spring 2015 EML Ethics and Design Project Organization.
Team Members:Tony Guzzo Eric Jacob Bill Liewehr Alex Schlaupitz Design of a Level 2 Rocket for the Wisconsin Space Grant Consortium Advisor: Dr. William.
Tropos-1 Hybrid rocket Project
Student Launch Project Flight Readiness Review April 21, 2014.
Science Fiction. Rocket flight Centre of Mass or Centre of Gravity (CM or CG) Centre of mass is the mean or central location of all the mass of an object.
 Vehicle dimensions, materials, and justifications  Static stability margin  Plan for vehicle safety verification and testing  Baseline motor selection.
Windward Community College University of Hawaii
Flight Readiness Review Team Hawaii. Vehicle Properties Diameter (in)6 inches Length (in)127 inches Gross Liftoff Weight (lb)50.25 lb Launch Lug/button.
Project: Water Rockets Your water rocket and report will be a major grade for the 3rd marking period. Rocket Launch Date: Friday, January 30 th Reports.
3/19/09. Animal Motor Works (AMW) K475WW High Power Rocket Motor. 54 mm casing, 40.3 cm long, 2.9 seconds burn time, 1394 N-sec total impulse, and
The Rocket Men Project One Giant Leap. Final Launch Vehicle Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom.
University of Arkansas Senior Project- When Pigs Soar.
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Flight Readiness Review Student Launch Initiative SCS Rocket Team Statesville Christian School April 2, 2008.
Rockets Applied Science Fall 08 Mrs. Dickerson.
Critical Design Review- UCF Jeremy Young Anthony Liauppa Erica Terry, Emily Sachs Kristen Brightwell Gillian Smith 1.
Atomic Aggies CDR. Final Launch Vehicle Dimensions Diameter 5.5” Overall length: inches Approximate Loaded Weight: lb.
Project Ares University of Central Florida NASA Student Launch 1/28/2015.
TESLA Rocket Project Lecture #3 10/28/15
Hemodynamics Star Splitters 4-H Club Two Rivers, WI Hemodynamics.
HARDING UNIVERSITY FLYING BISONS A Study of Atmospheric Properties as a Function of Altitude Flight Readiness Review.
University Student Launch Initiative Preliminary Design Review University of Illinois at Urbana-Champaign Team Rocket.
NUSTA RS NASA Student Launch MAV Challenge 2016 Critical Design Review 15 Janurary2015 Northwestern University | 2145 Sheridan Road | Evanston, IL
January 14,  Length: inches  Diameter: 6 inches  Mass: oz. / lbs.  Span: 22 inches  Center of Gravity: inches 
Critical Design Review Presentation Project Nova.
Flight Readiness Review UNIVERSITY OF SOUTH ALABAMA CONNER DENTON, JOHN FAULK, NGHIA HUYNH, KENT LINO, PHILLIP RUSCHMYER, & ANDREW TINDELL MENTOR : RICHARD.
UCF_USLI Preliminary Design Review David Cousin Freya Ford Md Arif Drew Dieckmann Stephen Hirst Mitra Mossaddad University of Central Florida.
Physics 11 Rocket Design Day Mr. Jean. The plan: Video clip of the day Rocket Designs and builds.
 Snake River Canyon Jump Twin Falls, Idaho September 8 th, 2014.
Auto Tow Conversion Course
Preliminary Design review
Critical Design Review Presentation
2018 First Nation Launch - Flight Readiness Review
Eric building the fin mount.
Mr. Capella Technology Education
Critical Design Review
Electrical Engineering, Wentworth Institute of Technology
Final Readiness Review
2019 First Nation Launch – FRR Virtual Review
2019 First Nation Launch – PDR Virtual Review
2019 TEKNOFEST ROCKET CONTEST PRELIMINARY DESİGN REPORT (PDR)
2019 First Nation Launch – Oral Presentation
Dual-Deploy Launch Checklist
2019 First Nation Launch – CDR Virtual Review
University of Iowa USLI
2019 First Nation Launch – Oral Presentation
Presentation transcript:

Jump Vehicle Details Ping Pong Productions

Design Strategy Start with an already proven vehicle concept Improve upon it with modern technology Allow for full scale testing with final vehicle

Improvements over X-2: Replaceable Crush Nose Cone Pilot Escape System Filament Winding Body Fabrication Carbon Overwrapped Pressure Vessel Ballistic Recovery Systems (BRS) Parachute Egress Cockpit cgcg cpcp Increased Static Margin

Fuselage Construction Filament wound composites fabrication 2.5x stronger and 45% lighter than aluminum Greater launch height with smaller motor Less stress on parachute system Allows for flight testing with final vehicle ISO9001, AS9100 and ISO17025 certifications

Steam Rocket Engine Safest and most reliable rocket motor type Same motor can be reused after flight tests Carbon Overwrapped Pressure Vessel Tested to 30,000 psi (operates at ~700 psi) 1/3 rd the weight of stainless steel (X-2) Significantly more c g flexibility for stability

Parachute System Ballistic Recovery Systems (BRS) design Rocket extraction deployment Assures rapid opening from any attitude FAA Certified – over 30,000 installed units Computer assisted deployment timing Dual systems / dual actuation methods

Egress Cockpit Integrated 5-point harness / BASE parachute Proven 3-ring release system Low minimum altitude Concept successfully tested from L-39 jet