DOE Presentation 12/10/03P. M. Grant, EPRI. DOE Presentation 12/10/03P. M. Grant, EPRI.

Slides:



Advertisements
Similar presentations
Metropolitan Transportation Authority November 2009 Financial Plan MTA 2010 Final Proposed Budget November Financial Plan 2010 – 2013 November.
Advertisements

Student Finance 2010 Teri O’Hara. Home/EUFees: Full time£3290 Part time£430 per module Undergraduate students.
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
Rural Development Rural Energy for America Program REAP Clean Energy Ambassadors Webinar September 23, 2014 Kelley Messenger, Acting Energy Coordinator/Business.
Eng. K A Noel Priyantha Chief Engineer (Renewable Energy) Ceylon Electricity Board 21 October, 2007 Pricing policy for renewable energy - Cost Based Technology.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
SCDC Cables Pitfalls and Potential (or vice versa) Paul M. Grant W2AGZ Technologies DOE Wire Development Workshop, Panama.
CODE Project WP3 – Modelling support for cogeneration across the EU27.
Nebraska Investment Finance Authority © 2007 Tax Credit Basics.
17-1.  The Federal Reserve system-is a bank for banks  You cannot personally open an account  Federal reserve system- set up by the government to supervise.
© 2010 South-Western, Cengage Learning Chapter © 2010 South-Western, Cengage Learning Buying and Owning a Vehicle 23.1Buying a Vehicle 23.2Maintaining.
Energy Efficiency and Arizona’s Energy Future Jeff Schlegel Southwest Energy Efficiency Project (SWEEP) April
10-1 Mortgage Loans You have to make a down payment Mortgage Loan
Houghton College/NextEra Solar Array. Solar Array Details 2.5 MW system covering 11 acres 2.92 million kWh production (equivalent to powering 270 homes.
The effects of not achieving a goal of Full Employment (High Unemployment)
Small Renewable Net Metering - An Investor Owned Utility Perspective John R. Grimwade Senior Director Strategic Planning & Development Presentation to.
Rory McIlmoil, Downstream Strategies. Introduction to distributed energy The case for distributed renewable energy Opportunities for developing distributed.
Year Review of Major Financial Funds Mount Vernon Community School District.
Capacity Factor Summary 1. Note: Figure only includes the 20 countries with the most installed wind capacity at the end of 2007 Wind as a Percentage of.
ISO New England Overview M A R C H 2 4, | H O L Y O K E, M A.
Sonoma County CCA Feasibility Study Summary Cordel Stillman Deputy Chief Engineer.
NISSAN HAS STARTED A MOVEMENT!. Leaf Production Plants #1 Oppama, Japan Production Start: Oct 2010 Capacity: 50K p/a #2 Tennessee, USA Production Start:
WEST DELTA WATER CONSERVATION AND IRRIGATION REHABILITATION (WDWCIR) PROJECT ByA.M.Farahat.
Rural Development’s Rural Energy for America Program (REAP) Grants and Loans Guarantees & Renewable Energy Feasibility Studies June 5, 2009.
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
Increase electric power flow in existing transmission lines, instead of building new lines Kalyan Sen, Ph.D., P.E. 16 June, 2009 Washington,
College An investment in human capital. Why is college an investment? Getting a long-term benefit for short term spending Lifetime earnings are much higher.
Why would a store want to go to Green Hills area? Why would it not?
Service Firm Accounts. Overview O What is a Service Firm? O Why do Service Firms keep accounts? O What type of accounts do Service Firms use?
Annual Percentage Rate (APR) The amount it costs you a year to use credit, expressed as percentage rate Interest, transaction fees, and service charges.
Wind Energy Update Larry Flowers National Renewable Energy Laboratory November 30, 2007 Salt Lake City, UT.
SUPER NOTES CHs LOOK for the $-MONEY QUESTIONS.
Commercial Matters Dublin Waste to Energy Project.
Leasing. Leasing is a process by which a firm can obtain the use of a certain fixed assets for which it must pay a series of contractual, periodic, tax.
Important Tax Forms W-2 form: reports employee’s annual wages and total amount of taxes withheld from his or her paycheck W-4 form: Determines how much.
Regulatory Reform to Support New Infrastructure Steve Kidwell MARC 2010 June 7, 2010.
Chapter 3 Financial Management Part 2 BCN 4772 Summer 2007.
©2011 Cengage Learning. Chapter 15 ©2011 Cengage Learning REQUIRED GOVERNMENT REPORTS.
UnitedSavings&Loans.
Compound Interest Home Buying Project College Prep Math Project Example.
Energising your Budgets Bruce Pittingale Carbon Special Reserve
Ice Storage for Peak Load Reduction Chris Smith NYSERDA NARUC 2007 Summer Meeting.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
PRESENTATION CH# 4 Economics Of Power System  GROUP MEMBER:. KASHIF ISHTIAQ (BSEE ). RANA MASHOOD.
Chapter 14.   Retailer – a business that sells to the final user (consumer).  Wholesaler – a business that sells to retailers. The Operating Cycle.
Nuclear vs. Solar By Prantick Dhar, Farhad Razaq, Jose Estrada, Luis Bayron.
The 100 pennies represent $1 dollar in sales Sales
My Budget and Balancing By James Shirey. Carpentry Carpentry position at Zaveta Custom Homes for interior and exterior construction located in Doylestown,
BUYING ON CREDIT: INSTALLMENT PLAN BUY NOW, PAY LATER!
MBOI Infrastructure Loan Application Administration & Finance May 27, 2015.
How sustainable is North America's energy future? What role could/will nuclear power play in North America?
Wind Power in New Hampshire 2016 ACEC / NHDOT Technical Exchange Conference April 7 th, 2016.
PV Panel Investment. Overview  Solar Global Trends and Growth  Solar Process and Net Metering  Sample System Breakdown  Personal System Details.
Characteristics of the US Economy & Types of Businesses.
HOLT, RINEHART AND WINSTON A MERICAN GOVERNMENT HOLT 1 Local Government Section 1: U.S. Communities Section 2: Local Government Organization Section 3:
ECONOMIC GROWTH 4.2: Analyze the factors that influenced the economic growth of the United States and its emergence as an industrial power, including the.
The Mitchell-Lama Program and Village East Towers: How the Mitchell-Lama Program Benefits Our Shareholders Prepared for the VET Annual Meeting January.
Loan Programs.  What is the PFA?  How does PFA financing work?  What is the Capital Financing Program?  What is the State Revolving Fund Program?
Chair of Education and Culture Commission Prof. Tamar Taliashvili
Wind Power Norway had a goal of 3000 GWh annual wind energy production within Government investment support - 1 Euro- cent per kWh wind energy. National.
The New York Power Authority
Terms to know Imports- goods brought into a country
هجرة الشباب الدولية والتنمية الفرص والتحديات
CONSTRUCTION PROJECT IN YAGOTYN DISTRICT, KIEV REGION
Investment Chapter 9.
OUTLINE Questions? Comments? Quiz Results Return Quiz Chapter 5.
Innovative Financing Tools for Cleaner-Burning Appliances March 2009 Amanda Aldridge,
Ch. 18: Demand and Supply in Factor Markets
Anna Garcia Air Innovations Conference August 2004
Economic Flow/Financial Institutions
Presentation transcript:

DOE Presentation 12/10/03P. M. Grant, EPRI

DOE Presentation 12/10/03P. M. Grant, EPRI

DOE Presentation 12/10/03P. M. Grant, EPRI

DOE Presentation 12/10/03P. M. Grant, EPRI

DOE Presentation 12/10/03P. M. Grant, EPRI

DOE Presentation 12/10/03P. M. Grant, EPRI

DOE Presentation 12/10/03P. M. Grant, EPRI

DOE Presentation 12/10/03P. M. Grant, EPRI

DOE Presentation 12/10/03P. M. Grant, EPRI Decreases pollution from power plants in and near New York City. Lessens the demand for new power plants in and near New York City. Helps budget-stretched Metropolitan Transportation Authority, New York State Thruway Authority and Amtrak by paying significant annual fees. Creates large number of union jobs during installation. Pays substantial taxes. Encourages the development of clean and renewable power upstate. Sets a precedent for underground invisible transmission. Benefits

DOE Presentation 12/10/03P. M. Grant, EPRI Cost Return $ 750 M ($ 400 M “banked”) X Years for Construction Loan Payment (4%, 40 yrs, 750 M$) =35 M$/yr Labor, Overhead, Maintenance = 5 M$/yr Tariff =0.5 ¢/kWh 50% Capacity = 4 M$/yr Full Capacity = 48 M$/yr