F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11–12 2005 The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,

Slides:



Advertisements
Similar presentations
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II ASAC-2007, April. 23, 2007 Injection System with a Booster in Separate Tunnel T. Shaftan for the NSLS-II team.
SSRF Light Source Complex Zhao Zhentang for the SSRF Project Team Shanghai Symposium on Intermediate Energy Light Sources Shanghai China, September 24-26,2001.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
AS Diagnostic Collaboration Mark Boland
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
G.N. Kulipanov, N.A.Mezentsev, A.V. Philipchenko, K.V. Zolotarev
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Erhard Huttel ISS/ANKA 1 CLIC damping wiggler CERN Vacuum Requirements etc. for ANKA General Requirements for UHV Vacuum: Pressure without.
SESAME Synchrotron Light for Experimental Science and Applications in the Middle East JSPS Asien Science Seminar Synchrotron Radiation Science Dieter Einfeld.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
Electromagnetic radiation sources based on relativistic electron and ion beams E.G.Bessonov 1.Introduction 2.Spontaneous and stimulated emission of electromagnetic.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
Cornell ERL Vacuum System as a Model for ILC Damping Vacuum System Conceptual Design Yulin Li & Joe Conway C ornell L aboratory for A ccelerator-based.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
Fourth-Generation Sources at Third-Generation Facilities John W. Lewellen Advanced Photon Source Argonne National Laboratory.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
SiriusUVX LNLS – National Synchrotron Light Laboratory CNPEM – Brazilian Center for Research on Energy and Materials A R Rodrigues, M Lisboa, R Madacki.
Abstract Storage Ring Vacuum and Interface to Magnets Hsiao-chaun Hseuh, NSLS-II Project This presentation provided a quick overview of the storage ring.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
ELECTRON MOVING AT CONSTANT VELOCITY
NSLS Vacuum Experience Eugene J. Hu National Synchrotron Light Source Brookhaven National Laboratory Upton, NY USA September 12-13, 2005 (prepared.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
GSI vacuum group Who we are:
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Michael Hahn reporting for Jean-Louis.
TAC Synchrotron Radiation Project Dr. Zafer Nergiz Nigde University Science Faculty Physics Department.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Emanuel Karantzoulis– ESLS XXIII, November, PSI 1 Elettra Status and upgrades Emanuel Karantzoulis.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Alignment of Insertion Device at Siam Photon Source
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
Elettra 2.0 Emanuel Karantzoulis
PETRA III, Status and Upgrade
Experiments on Fast Ion Instability at PLS
Status of HESR 18th March Gießen Dieter Prasuhn.
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
General remarks about the HESR and PANDA vacuum system
Low Emittance Rings 2014 Workshop
Coupling Correction at the Australian Synchrotron
Tango status at Elettra
ALBA capabilities towards contributions to the FCC study
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt,
LHC (SSC) Byung Yunn CASA.
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Presentation transcript:

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco, R.Godnig, R.Giovanoni

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– Synchrotron Light Source ELETTRA is the Italian Synchrotron Light Source located in Trieste. ELETTRA is a large multidisciplinary laboratory open to scientists at national as well as international level for basic and applied research in biology, physics, chemistry, material sciences, medicine and environmental studies.  e - E = 2.0–2.4 GeV I = mA

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA Vacuum System LINAC Transfer Line Storage Ring Front-Ends (Beamlines)

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– GeV LINAC Transfer Line (a Leak Test) The ELETTRA Vacuum System Length: 60 m Pressure Gauges: 10 SIPs 230 l/s: 14 SIPs 45 l/s: 25 P < 1 E-8 mbar (with e-beam) Length: 90 m Pressure Gauges: SIPs 45 l/s: 10 P < 5 E-8 mbar (with e-beam)

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– Storage Ring and a Beamline Storage Ring and Transfer Line: Injection Region Length: 259 m Pressure Gauges: 48 SIPs 120 l/s: 108 SIPs 400 l/s: 24 SIPs 900 l/s: 2 Residual Gas Analysers: 6 P < 2 E-10 mbar (w/o e-beam) P < 5 E-9 mbar (with e-beam) The ELETTRA Vacuum System

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– I.D.Material of the I.D. Vacuum Chambers 1Aluminum (no ante-chamber) 2Aluminum (no ante-chamber) (+ NEG) 3Stainless Steel (with ante-chamber) 4Stainless Steel (no ante-chamber) 5Stainless Steel (with ante-chamber) 6 7Aluminum (no ante-chamber) + NEG 8Aluminum (no ante-chamber) 9Aluminum (no ante-chamber) + NEG 10Aluminum (no ante-chamber) + NEG 11Stainless Steel (no ante-chamber) B.M. Light Port Material 1.1Aluminum 2.1Stainless Steel 3.1Stainless Steel 4.1Stainless Steel 5.1Stainless Steel 6.1Stainless Steel 7.1Aluminum 8.1Stainless Steel 9.1Stainless Steel 10.1Stainless Steel 11.1Stainless Steel 12.1Stainless Steel 12.2Stainless Steel I.D. Light Port Material 1.2Aluminum 2.2Stainless Steel 3.2Stainless Steel 4.2Stainless Steel 5.2Stainless Steel 6.2Stainless Steel 7.2Stainless Steel 8.2Aluminum 9.2Aluminum 10.2Aluminum 11.2Stainless Steel ID Vacuum Chambers (cross sections)

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– Users at ELETTRA (2004) Users’ Uptime in the last 8 years: 93,1 % Users’ Downtime due to Vacuum Failures in the last 8 years: 1,8 % Total number of users: 1002 Total number of experiments: 383 Total number of shifts [8h]: 5554 ELETTRA time for users [h]: 4551

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– New ELETTRA: BOOSTER Operational: summer 2007 Extimated cost: 15 M€ (Free Electron Laser) Operational: 2008 (1 st fase, min. wavelength 100 nm) Operational: 2010 (2 nd fase, min. wavelength 10 nm) Extimated cost: 75 M€ (1st + 2nd fase)

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– BOOSTER GENERAL LAYOUT Pre-injector Injection Booster Service Area Extraction SR Injection point Beam Energy2.5 GeV Minimum Extracted Current (in 100 ns) 4 mA Circumference118.8 m

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– BOOSTER STANDARD ARC LAYOUT Dipole Vacuum pump Sextupole Quadrupole Steerer BPM Standard arcs: int. HxV 48x18 mm thickness: 1.0 mm BOOSTER VACUUM CHAMBER

F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– , 2 2 4, 5 3 FERMI main parts: 1.Injector 2.LINAC 3.Extraction Line 4.Undulator Section 5.Experimental Hall