TREND 963 Basic Operation Course Helpful hints for running your Trend system
Possible Items which can be controlled Boilers Pumps Hot Water Systems Air Conditioning Utility meters Outside lighting Slide 1
Important Components of controlled heating system Time Schedules Optimiser Compensator Slide 2
Accessing the system Type these numbers into Address bar GCC Corporate sites External Address all Schools, (except Pupil Referral Units), Type into Address Bar NOT Search Engine Slide 3
Agenda item 5 Logging in Slide 4
Slide 5
Menu Page To adjust temperatures Click schematics Slide 6
Alternative home page To Make Adjustments Slide 7
Click services you want to adjust Slide 8
Adjusting temperatures Slide 1 Click green tab Slide 9
Adjusting temperatures Slide 2 Slide 10
Adjusting temperatures – increase to 20.0C Slide 3 Larger version Slide 11
Slide 12
Adjusting temperatures Slide 4 Complete Slide 13
Adjusting times Slide 1 Click diary Slide 14
ALL SITE DIARIES WILL BE SHOWN HIGHLIGHT TO VIEW EACH DIARY Slide 15
CREATE NEW TIME SCHEMES AND EDIT OR DELETE EXISTING TIMES Slide 16
Slide 17
Slide 18
Slide 19
Slide 20
Slide 21
Slide 22
Slide 23
Slide 24
Slide 25
Adjust times by using sliders Slide 26
Slide 27
Slide 28
Slide 29
Slide 30
Slide 31
Hover over option – turns blue then Click here to return to normal diary Slide 24 Slide 32
Larger version Slide 25 Slide 33
Exception – slide 1 Click ‘new special day’ Slide 34
Exception – slide 2 Select label and colour for ‘new special day’ and times for whole day Slide 28 Slide 35
Slide 36
Slide 37
Slide 38
Slide 39
Slide 40
Slide 41
Slide 42
Slide 43
Slide 44
Slide 45
Slide 46
Slide 47
Slide 48
Main page To view schematics click here Slide 49
Grey Box = Sensor showing the data held on sensors – slide Slide 50
Click on Grey box for Outside Temp – 24 hours data held in 15 minute intervals Click on line to see actual data at a specific time Available as graph or list Slide 51
Click on List to see data in table format Slide 52
Select Space Temp for inside temperature graph or list Slide 53
Space (inside) Temp Graph Slide 54
Coffee Break
Common faults and control management on site Summer/winter switch Duty cycle pumps not working Manual settings Location of sensors Doors and windows left open Obstacles in front of radiators Changes of use in rooms Secondary heat from servers Extensions to buildings Extended loss of power Slide 55
Support that will be available to you at your premises:- Direct telephone support Property Care Support (if purchased via ‘Buy back’) Slide 56
Contacts:- Jason Gregory Fax Building helpdesk Property Care Engineers (Buyback option) Slide 57
Energy Team Chris Bewley Rachel Clarke Contacts:- Slide 46