IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Stave -1 status and other reports Stave Loading Meeting, November 8 th 2011 G. Barbier, F. Cadoux, A. Clark, D. Ferrère, C. Husi, G. Iacobucci, A. La Rosa,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
IBL Loading Activity Overview Franck, Maarten, Coralie, Didier Loading tool workshop University of Geneva, Aug 31 st 2011.
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
Stave loading with Si-heaters at UniGe with jigs v-1 August 2011 Maarten, Coralie, Franck, Didier.

SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Hybrid Integrated Circuit
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
The ATLAS Insertable B-Layer (IBL) Project C. Gemme, INFN Genova On behalf of the ATLAS IBL COllaboration RD11 Firenze July 2011.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Pixel/IBL status and plans A.Rozanov A.Rozanov ATLAS-France
IBL MoU G. Darbo – INFN / Genova 17 April 2010 o IBL MoU Contribution prepared for Marzio’s talk at April RRB G. Darbo - INFN / Genova.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
1 H. Pernegger/CERNVertex 2011 ATLAS Insertable B-Layer Overview Vertex 2011 Rust, Austria H. Pernegger / CERN on behalf of the ATLAS IBL collaboration.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
Dec
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Loading and QA activities Introduction, Workflow, Tooling, Tasks UniBe – UniGe regular IBL-Upgrade meeting D. Ferrère Aug, 11 th 2011.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
IBL project for DT Science-Techno Tea
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
WP9 ITS Mechanics and Cooling
WG4 – Progress report R. Santoro and A. Tauro.
Module/Ladder Assembly
Update on ATLAS insertable B-layer
Presentation transcript:

IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10 th 2011

Management Board G. Darbo (PL) / H. Pernegger (TC) IBL Activities across the Working Groups WG1: Module F. Huegging / M. Garcia-Sciveres WG2: Stave O. Rohne / E. Vigeolas WG3: Integration/Installation R. Vuillermet / F. Cadoux WG4: Offd-etector T. Flick / S. Débieux Module Task Force  Sensor and module design X0 Task Force  Survey and correct design if possible 2 All the WG undertake and work for the IBL accelerated schedule for Installation in 2013 PIXEL / IBL “LIAISON” Common Pixel / IBL Membership:" Offline Software: F. Djama" DAQ: P. Morettini" DCS: S. Kersten" IBL Test Beam Coordination

IBL Layout and Beam Pipe 3 IBL Beam pipe ordered! ID 47 mm (was 45mm) More coverage by TAS for IBL/Pixel protection Reduced clearance between beam pipe envelope to stave envelope from 3.5mm to 2.5mm All others unchanged Staves will have to stay inside a 9mm envelope (radius)! IST ID: 85mm

IBL Modules for Loading 4 Features which matter for loading: -Single chip modules (3D) and double chip modules (planar) - Module gap: 100 µm (3D) and 200 µm (planar) - HV integrity: 150V (3D) and 1000V (planar) - Module pitch and flex wing connections are compatible for both types 2 types of modules compatible for the loading and flex connection 2 types of modules compatible for the loading and flex connection Both types are equally fragile to handling, loading and thermal cycling stresses Double chip digital module (dummy sensor) First electrical functional modules available for loading on full length stave 41.3mm 20.1mm Module flex

Latest design submitted for fab Could be cut out in case of envelope issue Flex and wing investigation Optional slits depending if the flex is laminated to the stave or not Features: - 1 flex serves half stave modules (16 FEI4) - Multilayer flex with a mix of Cu/Al studied for integration (8 layers) - The flex will be glued/laminated to the stave back side - The flex design include 16 wings to be folded and glued to the modules Al/Cu prototype under electrical tests Measurements made in Genova Crosstalk seen by the LVDS receiver 527.2mm long 5

 Special Jigs have been made for loading accurately the single chip modules. - Metrology of those modules were made before loading allowing to make precisions jigs  Loading of the short W-shape stave with bump bonded dummy modules : - Stave with Barcelona modules * completed (AgSn bumps): a mistake was made when placing the middle odd module. Did not check carefully the sensor edge contact. - Stave with Genova modules (In bumps): completed with success. No issue with placement!  Metrology survey done on the cutting edge - Confirmation of the loading problem with the Barcelona module stave  Electrical results from Genova and Barcelona – before vs after loading Thanks to G. Darbo, A. Rovani and S. Grinstein - In bump modules: OK and even better after loading - AgSn bump modules: 2 modules got open bumps after loading Loading -Dummy Bump Bonded Modules Sensors against alignment refs 100 microns thick shims 20g load added * Thanks to ICTS 6 Extraction of modules from gel pack was difficult NB: IBL modules will be delivered on a frame flex PCB

No Pipe Fittings at PP0 Loading with 1.3m long pipe stave and using temporary fitting is the fastest procedure RequirementsEquipmentPassed or plan Vacuum chamberThanks to S. Mathot (EN-MME-AF)OK EM induction effectsTested in March 11OK Brazing tests with induction headUnder fabrication (S. Mathot, Teddy)Imminent Upgrade of the vacuum chamber for long pipe To be worked out (S. Mathot)tbd Integration of the vacuum chamber on a bench in SR1 To be worked out (S. Mathot + UniGe)tbd 38 kHz signal measured if cable close to induction block Max power V No induction measured When probe cable far from induction block  No induction measured Test done with S. Mathot, T. Todorov, S. Débieux, D. Ferrère 7 Important step to be validated Option to load and QA with 7m long stave is also considered

Full Length Stave – Handling Frame Handling frame features: Stave should never be removed from its support frame until it is integrated to the beam pipe Allows to handle and protect the stave between operations, storage and final integration Will have reference holes to precisely hold jigs and extensions bars for 7m long stave Will have to support stave with the same IBL/IST ring fixations even for thermal cycling, metrology, electrical test, wire bonding, … 8 Handling frame End block with support Tuning mechanism to adjust stave height and imperfections In total handling frames will have to be produced! Thanks to Maarten for 3D views

9 Work Preparation for the Loading Activities - Jigs Handling frame inside the cradle Grease mask added 1 st Si-heater or digital module 2 nd added with 200µm gap Half stave loaded Wing handling to free the loading space Wing glue + adhesive hold in an envelope defined by the jig Thanks to Maarten for 3D views

Cooling and Stave Thermal Tests 10 Required limit Results with face plate are better than expected Stave with 3M Adhesive Stave with raw foam Thick Parylene Face plate TFOM of loaded Si-heaters on short staves IBL cooling system layout Loaded stave : -24.4°C Unloaded stave -39°C Test system - measurements Long connection lines with accessible manifolds are feasible USA-15 Junction box – Muon sector 5 (accessible) 14 IBL IBL staves

Support frame Half pipe as a rotating cradle Mechanism for stave “docking” 9m long stand is mandatory from this stage Delicate kinematic Stave integration tool under design 7m long stave to be integrated in a restricted envelope with less 1mm clearance with neighboring staves Stave Loading around the Beam Pipe 11

12 Multipurpose tooling with the Long Guiding Tube (LGT) for Beam pipe, IST, IBL Multipurpose container ID Supporting frame IBL installation tooling developed by LPSC (Grenoble) Rotation table Long Guiding Tube I/F table I&I WG: Insertion/Extraction Tooling This technique is the only one under investigation to remove ATLAS Beam Pipe when needed 12 Fixed Table Beam Pipe

I&I WG: Technical challenges to investigate soon (summer 2011) 2400mm long Dummy IST (used for Stave assembly around the beam pipe) 1 out of 4 tubes… IST: 3 segments of IST assembled in Seattle (K13C fibers) LGT: for Long Guiding Tube… used for BP extraction (active system to keep a straight tube over 7m) To be assembled and Tested on ITF at CERN in Summer (a Dummy Beam pipe in Carbon fibre is needed, same technique as for IST…) 13 Next is to fabricate the dummy beam pipe for practicing the BP extraction

FE-I4 voltage regulators proposed to be set in partial shunt mode to guarantee a minimal current. The goal is to limit transient voltage excursion. First complete prototype of optobox in October ROD fabrication has started: 2 prototypes expected by next month ROD firmware design is ongoing The design of a full DAQ chain simulation environment has started BOC: prototypes expected by September, then testing and redesign until the end of the year RX plugin: investigation underway to use commercial SNAP12 modules Grounding & Shielding concept is now integrated into the whole IBL detector Optobox concept for nSQP and IBL Off-detector 14 BOC block diagram FEI4 powering

IBL Schedule for Installation in 2013 – Brief Summary 15 ActivitiesStartingEnding FEI4-BJuly 11: SubmissionOct to Dec 11 for wafer tests Bump bondingAug 11: pre-productionJuly 12: Completion Module assemblyFeb 12: 1 st modules ready for loading Oct to Dec 12 depending of sensor Module loadingFeb 12:  4 staves to be ready by Apr 12 Jan 13: Completion Stave loadingSep 12: starting with the 1 st available staves Feb – Mar 13: Completion Final tests and commissioning Sep 12Jul 13: IBL Installation All is tight and does not allow early delay in the all program The production has started or is starting for some items The Beam pipe should be ready in July 12 and 2 month later the staves should already be integrated The current work preparation for stave fabrication, flex, module assemblies, loading and tests is requiring a lot of effort across all WGs The mechanics for the integration and beam pipe removal/insertion is under work preparation and should be tested with the mock-up this year in bldg 180