NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Advertisements

ESS Cryogenic System Design
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Engineering and Design Group Fermi National Accelerator Laboratory Cryogenic Department AAC Review, May , 2005 Jay Theilacker HPTFCRYOGENICS.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
CRYOGENICS FOR MLC Cryogenic Cooldown Scheme Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
R. Than J. Huang P. Orfin T. Tallerico Jan. 19, 2011
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Jonathan Creel Electrical / Cryogenics Engineer Cryogenics.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
LCLS-II Cryogenic Distribution System CDS Surface Components PDR Jerry Makara December 16, 2014.
Energy efficiency considerations in cryogenics Philipp Arnold Section Leader Cryogenics Proton Driver Efficiency Workshop.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Final Design Cryogenic and mechanical configurations
LCLS-II Technical Requirements
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
Process Requirements and Design Approach
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
Process Simulation for the LCLS-II Cryogenic Systems
FRIB Cryogenic Support
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
ESS Target Cryogenic System European Cryogenic Days CERN
2K Cold Box Process Design
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
Cryogenic System Commissioning Summary Report
Overarching Commissioning Plan
SNS Cryoplant Commissioning Past Experiences
SNS PPU Cryomodule Instrumentation
CTF Users’ Perspective
ESR2 Process Cycle Design
ESR2 Process Cycle Design
Presentation transcript:

NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011

Outline Overview CM1 cooldown System capabilities Technical issues Future plans Summary

NML Cryogenics Overview Two oil-flooded dual stage compound screw compressors Two standalone Tevatron heat exchangers operating in a mixed mode – refrigeration and liquefaction Refrigeration for 5 K thermal shields and distribution system heat leak Liquefaction for supplying cavities 80 K thermal shields are cooled by LN 2 from a dewar Warm vacuum pump is used to reduce helium vapor pressure for superfluid conversion Distribution system to serve Capture cavities and ILC type cryomodules Real time purification and contamination protection systems Inventory management systems State-of-the-art controls and instrumentation

CM1 Cooldown Cooldown to 4.5 K  Accelerator Division approval to operate CM1 was granted on November 17, Cooldown was started at 9:00 am Manual cooldown. Three shifts around the clock  Cooldown from 300 K to 4.5 K was achieved in 54 hours Pumpdown to 2 K  Pumpdown performed on Monday, November 22 nd  It took three hours to get to 12 torr ( ~ 1.8 K) Issues  Following completion of the CM1 cooldown on Friday, November 20 th developed a helium leak in the refrigerator room (3:30 pm)  CM1 helium to insulated vacuum and air to insulated vacuum leaks

System Capabilities Sufficient capacity for > ILC RF Unit* Rate limited cooldown ( req’d by ILC CM design) Stable cavity pressure Precision liquid level control Cryomodule over pressure protection system State-of-the-art controls Sub atmospherically hardened system * - based on the listed ILC cryomodule heat load Picture courtesy P. Perini, INFN

Capacity Feed cap, End cap and CM1 static heat load is estimated to be 18 W* Sustainable delivered capacity: ~ 110 Superfluid temperatures ( 1.6 K or higher) * - Estimate is within ~20% accuracy CM1 HeaterCM1 liquid levelRefrigerators heaters

Cooldown Rate Control Helium Gas Return Pipe (GRP), aka 300 mm strong back  Maximum Vertical Gradient <= 15 degrees  Longitudinal Gradient <= 50 degrees  Cooldown Rate is < 10 degrees/hour or better 5 K and 80 K Thermal Shields – similar constraints Driven by ILC cryomodule design 10 [K/hr] GRP vertical gradient

Pressure stability Cavity pressure fluctuation is 0.1 torr (10 Pa) or better, thus temperature stability is better than 2 mK

Liquid Level Control Dynamically adaptive PID control loop for liquid level control Q loaded Eacc He liquid level Cavity pressure

Over Pressure Protection System Cryomodule Relief System (Dual MAWP)  4 bar (43 psig) Main Relief (6” x 8” nominal size)  2.05 bar (15 psig Relief) (2” x 3” nominal size)  7 psig Operational Relief  Reliefs Utilize Conflat Flanges  12” Relief Header with Low Pressure Rupture Disk

Open Technical Issues Primary  Helium flow meter accuracy (explore alternative designs)  Improve insulating vacuum (install additional insulating vacuum pump cart, improve CM seals) Minor  North H/X return helium vaporizer (condensation in the building)  J-T heat exchanger thermometry (ground loops)  Replace South H/X bayonet with modern design ( leaking ball valve)

FCI Thermal Flowmeter Vendor calibrated primary thermal flowmeter and secondary variable area meter were tested by changing electrical heater power input to CM1

Insulating vacuum Helium to insulating vacuum leak intensifies at normal He to superfluid transition Insulated vacuumHe pressure

Future Plans Resolve open issues Increase system capacity  Modify and install CTI-4000  Supplement NML heat exchangers from CMTF Improve compressor system availability  Commission purifier compressor  Install a spare Mycom compressor Streamline cryomodule interconnects installation

Summary The NML cryogenic system has supported initial CM1 cooldown. It has been reliably operated for the past six months The system has achieved expected capacity and performance The cryogenic systems allows for continuous operation of ILC cryomodules NML has unique cryogenic capabilities specifically tailored for testing and operating of ILC cryomodules

Thanks to dedication and talent of many involved …

Supplemental material

NML Refrigerator Continued  Reciprocating expanders  Valve Box  Helium Dewar  Heat Exchanger  Bayonet Cans  Two Standalone Refrigerators  Capacity: K or 4 g/s LHe each  Located Southeast End of NML Satellite Refrigerators

Main Helium Compressors  Located at Lab B  Two oil-flooded screw compressors  Manufactured by Mycom  Capacity 60 g/s each  Pressure Discharge ~280 psig Suction ~ 1.2 psig  Oil Removal System  Power ~400 hp each

Helium Gas Storage and Liquid Nitrogen Supply  4 Helium Storage Tanks  Total Capacity = 42,900 gallons  MAWP = 250 psig  2 Tube Trailer Fill Stations  Liquid Nitrogen Dewar  6000 gallon capacity

Recovery Booster Compressor  Contamination Concerns due to Sub-atmospheric Operation  Frick Helium Screw Compressor (100 hp)  Vacuum Pump Discharge Flow  14 g/s of Helium at 1 psig Inlet Pressure  New Oil Removal System Installed  Compressor Flow can diverted to Helium Purifier  Two Full Flow Helium Purifiers Available

Helium Pumps (Superfluid Operations)  Ambient Temperature Pumping Cycle  Kinney Model KLRC 2100 Liquid Ring Pump  Kinney Model KMBD – 10,000 Roots Blower  Identical to Skid Used at MP7  Reworked for Helium Service  Helium Guarded Dynamic Seals  Sub-atmospheric Components  Several Stages of Interlocks for Protection  Connected to Cryogenic Load via Main Pumping Header  CC1, CC2 and Cryomodule String have individual low pressure control valve to independently regulate cavity pressure

Cryomodule Distribution System Feed Cap Cryomodule End Cap Feed Box Transfer line

Feed box Feedbox contains J-T heat exchanger, dewar/subcooler/phase separator, all the valves and instrumentation to distribute cryogens to all of the CM circuits

Feed cap WPM Beam Tube 5 K 80 K Support Plate ~30 ton Force

End cap Connects to 300 mm GRP Phase separator with liquid level probe and two heaters 80 K thermal shield 5 K thermal shield

Interconnects 27

AEM Meeting 28 Dec 20, 2010 Interconnects (cont’d)

29 Interconnects (cont’d)

30 Interconnects (cont’d)

31 Interconnects (cont’d)

32 Interconnects (cont’d)

33 Interconnects (cont’d)

34