Scheduling.
Advertisements

To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Operations Management
Inputs and Outputs to Aggregate Production Planning
Scheduling Operations Management - 5 th Edition Chapter 16 Roberta Russell & Bernard W. Taylor, III.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 6 th Edition Chapter.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Scheduling.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Scheduling. Scheduling in a Process-Focused Environment.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management - 5 th Edition Chapter.
1. Facility size 2. Equipment procurement Long-term
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 13 Material Requirements Planning.
1 Material Requirement Planning (MRP) Chapter 16 Feb 9, 2006.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Operations Management Material Requirements Planning
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Resource Planning Lecture Outline   Material Requirements Planning (MRP)   Capacity Requirements Planning (CRP)   Enterprise Resource Planning.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1DSCI4743 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Structure of the MRP System MRP by period report MRP by date report Planned orders report Purchase requirements Exception reports MRP Programs Master.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Material Requirements Planning Defined Materials requirements planning (MRP) is the logic for determining the number of parts, components, and materials.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CAPACITY MANAGEMENT Nyoman Pujawan.
Production Manager 1 Strategic Planning Forecasting
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Activity Scheduling and Control
Resource Planning Chapter 15.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 12 Enterprise Resource Planning.
Manufacturing Systems Engineering
Scheduling.
BUAD306 MRP.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
Basics of Supply Chain Management
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Master Production Scheduling (MPS)
Facility Inventory Old Facilities Modern Facilities Classroom Size
Inputs and Outputs to Aggregate Production Planning
CHAPTER 8 Operations Scheduling
Material Requirement Planning (MRP)
Chap 11 Learning Objectives
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Inputs and Outputs to Aggregate Production Planning
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

MOS 3330 Operations Management Professor Burjaw Fall/Winter

Learning Objectives: 1.What MRP is and does 2.Inputs and outputs of MRP 3.Scheduling basics 4.Scheduling sequencing rules MOS 3330MRP2 Formula Sheet

MOS 3330MRP3 Items Product lines or families Individual products Components Manufacturing operations Resource level Plants Individual machines Critical work centers Production PlanningCapacity Planning Resource Requirements Plan Rough-Cut Capacity Plan Capacity Req’ts Plan (CRP) Input/Output Control Aggregate Production Plan Master Production Schedule (MPS) MRP Shop Floor Schedule All work centers

Aggregate plan provides a framework for shorter-term production and capacity decisions –Disaggregation: The process of breaking an aggregate plan into more detailed plans Material Requirements Planning (MRP): Computerized inventory and production control system that determines the requirements of dependent demand inventory –Introduced in the 1960s –Dependent demand inventory = parts, components, raw materials –Determine what is required, how much is required, and when it is required MOS 3330MRP4

5 MOS Explosion: disassembly of the end product into its components 2. Netting: (Net requirements) = (Gross reqts) – (On-hand inventory) – (Quantity on order) 3. Offsetting: order release is offset by production or delivery lead time 4. Lot sizing: determine the batch size to be purchased or produced Inventory Master File Product Structure File Work Orders Purchase Orders Action Notices Planned Order Releases Master Production Schedule (MPS) Formula Sheet

States the requirements for individual end items by date and quantity MOS 3330MRP6 MPS is Not a sales forecast a wish list a final assembly schedule MPS should be anticipated build schedule realistic and achievable may not be feasible Aggregate Production Plan MonthJanFebMarApr Days Plan21,00019,00023,000 20,000 MPS for April Week Prod X2,0004,0005,0002,500 Prod Y3,0001,0002,500 Totals5,0005,0005,000 5,000

DescriptionInventory Policy ItemBoardLead time2 Item no.7341Annual demand5,000 Item typeManuf.Holding cost1 Product/sales classAss’yOrdering/setup cost50 Value classBSafety stock 25 Buyer/plannerRSRReorder point39 Vendor/drawing07142EOQ316 Phantom codeNMinimum order qty100 Unit price/cost1.25Maximum order qty500 PeggingYMultiple order qty100 LLC3Policy code3 Physical InventoryUsage/Sales On hand100YTD usage/sales1,100 LocationW142MTD usage/sales75 On order50YTD receipts1,200 Allocated75MTD receipts0 Cycle3Last receipt8/25 Difference-2Last issue10/5 MOS 3330 MRP 7

MOS 3330MRP8 Clipboard Rivet (2) Iron Rod (3 in.) Spring (1) Spring Steel (10 in.) Bottom Clip (1) Top Clip (1) Pivot (1) Sheet Metal (8 in 2 ) Clip Assembly (1) Sheet Metal (8 in 2 ) Board (1) Pressboard (1) Finish (2oz.) Bill of material (BOM): lists which and how many items that go into a product Parent Child

Example 1: Based on the product structure diagram on the previous page: a) How much spring steel is needed to fill an order of 500 clipboards if on-hand inventory = 0? (Explosion & netting) b) How much sheet metal is needed to fill an order of 1000 clipboards if on- hand inventory = 7000? (Explosion & netting) c) In order to produce 1000 clipboards, subassembly takes 1 day and final assembly takes 1 day. For b), when should an order for sheet metal be placed if 1000 clipboards are needed by April 11? Order lead time = 5 days. (Offsetting) d) In b), if the order lot size is 2000, how much would you order? (Lot sizing) MOS 3330MRP9

MRP is not a demand planning tool –Input quantities are production quantities, not demand –Production plan derived from aggregate production planning MRP is deterministic –All input numbers are known –Problems show up as the action notices Main MRP problem = shortage of components/finished goods MRP is a simulation tool –Can estimate the production outcome  identifies potential shortage before actual production –Does not solve problems on its own  requires human input Solution examples: to purchase or produce more ahead of time; to move some jobs forward (expediting) or backward (de-expediting) –Can show how the change in MRP input (i.e., a potential solution) affects MRP output  shows whether or not the solution would work MOS 3330MRP10

Allocation of resources to accomplish specific tasks –Last stage of planning before production Scheduling objectives –Meet customer due dates –Minimize job lateness, response time, completion time, overtime, idle time, and work-in-process inventory –Maximize labour or equipment utilization Scheduling performance measures –Job flow time: total time a job spends in the shop incl. waiting, setup –Makespan: total time to finish a batch of jobs –Average number of jobs in the system: measure of WIP inventory –Job lateness: ahead of, on, or behind the schedule –Job tardiness: how long after the due date the job is completed MOS 3330MRP11

Length of a production run, flow schedule, line balancing Bottleneck: an operation with the lowest effective capacity Optimized Production Technology (OPT): a technique used to schedule bottleneck systems Theory of Constraints (TOC): a management philosophy that extends the concepts of OPT Coordination difficulty from having a variety of orders, tasks & process requirements Loading: assigns jobs to work centres according to performance efficiency, skill requirements, and job priority Sequencing: determines the sequence in which jobs assigned to a work centre are to be processed MOS 3330MRP12

First come first served (FCFS) Last come first served (LCFS) Earliest due date first (EDD): min. tardiness Shortest processing time first (SPT): min. average flow time Longest processing time first (LPT) “Formulas” for Scheduling Performance Measures: Job flow time = (waiting time) + (processing time) Makespan = finish time for the last job Avg. # jobs in the system = (  all jobs job flow time)/(makespan) Job lateness =  all jobs (finish time  due time) Job tardiness =  only late jobs (finish time  due time) MOS 3330MRP13 Formula Sheet Formula Sheet Formula Sheet Formula Sheet Formula Sheet

Example 2: A hospital lab has one MRI, and 5 patients need scheduling. Job:ABCDE Processing time (hrs):47263 Pickup time (hrs from now): MOS 3330MRP14 FCFS LCFS EDD SPT Sequence Avg. flow time Tardiness LPT Flow time =wait+process Tardiness =finish-due

Scheduling in services –Complicated because demand is often variable and difficult to forecast –Service scheduling: appointments, reservations, posted schedules, backlogs –Staff scheduling: peak demand, floating, on-call, seasonal, part-time Maintenance scheduling –Repair scheduling –Preventative maintenance MOS 3330MRP15