The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Rakhine State Office Priorities and Detailed Description.

Slides:



Advertisements
Similar presentations
Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Assessment of Individual Transitional Housing constructed by the DRD in Thandwe.
Advertisements

National Electrification Planning for Myanmar (NEP):
11 PUBLIC WORKS AND INFRASTRUCTURE DEVELOPMENT ENERGY & ELECTRICITY PROJECTS IN THE CENTRAL REGION Director: K.J Leepile SEPTEMBER 2011.
Resettlement Campaign. Action Plan on Resettlement of the Affected Populations in Rakhine State Sr. No. Township Affected HH Implementations Implementing.
Win Theikdi Turbine Presentation by:
1 SINGLE-PHASE METALLIC RETURN TECHNIQUE Presented by Moncef AISSA Senior Engineer STEG-Tunisia March 7, 2006 contributors - E. Cecelsky - A. Ounalli -
Outline of JICA’s Assistance prepared for
Rural Electricity Access by MOLFRD
UPDATE ON ASSETS IN CESC’S T&D NETWORK.
Electricity Transmission and Distribution. Transformer A device that transfers electricity from one circuit to another.
Policies.
Antenna Electrical Infrastructure Selection of OMT Design for the EVLA X-band Receiver Bob Broilo Electrical Engineer.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Myanmar: Towards Universal Access to Electricity by 2030 Nay Pyi Taw, January 28, 2015.
Rural Electrification Access by Department of Rural Development
Page No. 1. Page No. 2 PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT KARACHI PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT.
Budget Financing in Myanmar Daw Ni Ni Than Director Treasury Department.
Country profile Burma. Country Profile - Burma Official name: Union of Myanmar Population: 49.2 million (UN, 2008) Capital: Nay Pyi Taw Largest city:
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
1 by Mr. Zay, Ms. Lai, Ms. Sandar, Ms. Kyi. High Value Food Processing SME Cluster In Myanmar Presented By; Mr. Zay Yar Swe Ms. Sandar Tun Ms. Khin May.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayah State Office Priorities and Detailed Description of.
The Republic of the Union of Myanmar Ministry of Electric Power
The Republic of the Union of Myanmar Ministry of Electric Power
Surveillance Plan on Malaria Control/Elimination in Myanmar.
1 Manufacturer’s Outreach Workshop, Thingaha Hotel, Naypyitaw Myanmar. October
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Ayeyarwady Region Office Priorities and Detailed Description.
Electrical Engineering
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Mandalay Region Office Priorities and Detailed Description.
PROCUREMENT UNDER THE PROJECT National Electrification Project.
Submitted To:- Submitted By:- Mr.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
Special Education in Thailand: Mae Hong Son Model By Amnat Wichayanuwat (Ph.D) Director of Bureau of Special Education Office Of The Basic Education Commission.
Current status & future plans for power system development U Moe Thet, Deputy Chief Engineer Power System Department Myanma Electric Power Enterprise.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Douglas Bowman, PE, PMP Project Manager Entergy Corporation New Projects and Processes Ensure Power Transfer for Northeast Arkansas Customers.
Economic Comparison off Grid System. Q1 : Sizing of Solar Panel System Let us consider that one house needs following loads; 10W, 2 lamps for 3 hours.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Kayin State Office Priorities and Detailed Desription of.
How IT Transition can feed green growth and energy transition through innovation 25th MAY, 2016 Masaaki Yamamoto New Energy and Industrial Technology Development.
Sustainable Management of Peatland Forests in Southeast Asia SEApeat Project - Myanmar Component Progressive Report for Current year 2014 (January to June)
Current Electrified Villages Sagaing Region Townships - 11 Villages - 91 Households Kayin State Townships - 5 Villages Households
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Eastern Shan State Office Priorities and Detailed Description.
The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Magway Region Office Priorities and Detailed Description.
Electricity.  Aims – To understand the process of providing Electricity to buildings.  Objectives  To understand how Electricity is Generated.  To.
Ministry of Electricity and Energy
Ministry of Electricity and Energy
Communications channels, tools and methodologies
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
The Republic of the Union of Myanmar Ministry of Electric Power
National Training Programme For C&D Employees (Variant 3-Financial Management ,Store Accounting and Office Admininstration) )
The Republic of the Union of Myanmar Ministry of Electric Power
SUB-STATIONS.
Electricity is produced at the power station.
The distribution grid Carcano & Cividini V A/AUTOMAZIONE
The Republic of the Union of Myanmar Ministry of Electric Power
Information about the resort recreation area "Kenderli"
Electric Utility Master Plan Update
Off-grid Electrification Department of Rural Development
The Republic of the Union of Myanmar Ministry of Electric Power
INTRODUCTION TO LOAD SHEDDING TRANSFORMER
AGRICULTURAL COOPERATIVES ACTIVITIES IN MYANMAR
ESKOM RURAL ELECTRIFICATION EXPERIENCES - LESSONS LEARNT -
The Republic of the Union of Myanmar Ministry of Electric Power
Installation And Estimation of Service Connection
Yangon Region Rural electrification plan
The Republic of the Union of Myanmar Ministry of Electric Power
The Republic of the Union of Myanmar Ministry of Electric Power
ENCLAVE POWER COMPANY LIMITED
BRIEFING ON THE INTERCONNECTION LINES OF THE
Overview of Electrification Options
Road And Bridge Construction Experiences Over the Last 6 Years S/N
Presentation transcript:

The Republic of the Union of Myanmar Ministry of Electric Power Electricity Supply Enterprise Rakhine State Office Priorities and Detailed Description of Electrification Plan For Rakhine State Dated -21.Oct.2015

Priority Electrification Project List for Rakhine State NoTownship Name of Village To be Electrified No of House House hold Popu lation To be constructed Estimated cost (Mil Kyates) Task by regional Cost for 11 kV Line 11/0.4 kV Transform er 400 V Lines (Miles) Estimated Cost (Mil Kyats) mileKVANo 1SittweMg Ni Pyin Shwe Pyi Thar Kyia Taw(Paik Seik) Par Da Late A Myint Kyum Che Lai Pinn Kyite Tee Pon nagyunRa Pauk Chaung Zay Ti Yinn

Priority Electrification Project List for Rakhine State NoTownship Name of Village To be Electrified No of House House hold Popu lation To be constructed Estimated cost (Mil Kyates) Task by regional Cost for 11 kV Line 11/0.4 kV Transform er 400 V Lines (Miles) Estimated Cost (Mil Kyats) mileKVANo 10AnnPel Pa Doe Zar Ti Maw Zan To Zu Pot Pinn Taw Ram reeRon Bu Zae Ah Wa Taung Than dwe Mat Chanug (Upper) Mat Chaung (Lower) Mel Gyum (1) Nan Yar Kone Tum Pin Sai Sar Ni Taung

The additional electrification statement due to newly 66/11kV substation and newly power line for Rakhine State Sr NoTownship To Be ConstructedThe effective area Estimated Cost (millon kyats) Substati on 66kV Line (mile) 33kV Line (mile) Total Villages (Nos) Total Househo ld (No) Total Populati on (No) Material Installati on Total 1 Ponnagyun (Yotayourk) Newly 66/11 kV 5 MVA Maruk U (Tainnyo) Newly 66/11 kV 5 MVA Total

5

6

To be Constructed  11 kV Distribution Line 28.9 miles  400 V Distribution Line 18.5 miles  11/0.4 kV Distribution Transformer 28 Nos Kyauk Phyu District No. of Villages - 6 Nos Household Estimated Cost (mil kyats) Sittwe District No. of Villages - 9 Nos Household Estimated Cost (mil kyats) Thandwe District No. of Villages - 6 Nos Household Estimated Cost (mil kyats) Electrification Plan for Villages of Rakhine State (Within 2 miles from Existing 11 kV Distribution Line) Rakhine State No. of Villages - 21 Nos Household Estimated Cost (mil kyats) 7

Detailed Electrification Plan for Rakhine State (Within 2 miles from Existing 11 kV Distribution Line) NoDistrict Name of Village To be Electrifi ed No of Hous e Hous e hold Popu latio n To be constructed Estim ated cost (Mil Kyate s) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Mile s) Estima ted Cost (Mil Kyats) mile Materi al Cost Tran sport Cost Cons tructi on Cost TotalKVANo Mate rial Cost Tran spor tCos t Con stru ctio n Cos t Total 1.Sittwe Maungda w Maruk U Kyauk Phyu Thandwe Total

Detailed Electrification Plan for Sittwe District (Within 2 miles from Existing 11 kV Distribution Line) NoTownship Name of Village To be Electrifie d No of Hous e Hous e hold Popu lation To be constructed Estimat ed cost (Mil Kyates) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Miles ) Estima ted Cost (Mil Kyats) Mile Materia l Cost Transp ortCos t Const ructio n Cost TotalKVANo Mate rial Cost Tran sport Cost Con stru ctio n Cos t Tota l 1.Sittwe Ratitaung Ponnagyu m Pauk taw Total

Detailed Electrification Plan for Sittwe District (Within 2 miles from Existing 11 kV Distribution Line) Ratitaung (No) Sittwe No. of Villages - 7 Nos Household Estimated Cost (mil kyats) Sittwe No. of Villages - 7 Nos Household Estimated Cost (mil kyats) Pauktaw (No) Sittwe District No. of Villages - 9 Nos Household Estimated Cost (mil kyats) Ponnagyun No. of Villages - 2 Nos Household Estimated Cost (mil kyats) Ponnagyun No. of Villages - 2 Nos Household Estimated Cost (mil kyats) 10

Detailed Electrification Plan for Kyauk Phyu District (Within 2 miles from Existing 11 kV Distribution Line) No Town ship Name of Village To be Electrifi ed No of Hous e Hous e hold Popu lation To be constructed Estimat ed cost (Mil Kyates) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Miles ) Estimat ed Cost (Mil Kyats) mile Materia l Cost Trans portC ost Const ructio n Cost TotalKVANo Mate rial Cost Tran sport Cost Cons tructi on Cost Total 1. Kyauk Phyu Ann Ramree Munaung Total

Ann No. of Villages - 4 Nos Household Estimated Cost (mil kyats) Ann No. of Villages - 4 Nos Household Estimated Cost (mil kyats) Kyauk Phyu (No) Ramree No. of Villages - 2 Nos Household Estimated Cost (mil kyats) Ramree No. of Villages - 2 Nos Household Estimated Cost (mil kyats) Munaung (No) Kyauk Phyu District No. of Villages - 6 Nos Household Estimated Cost (mil kyats) Detailed Electrification Plan for Kyauk Phyu District (Within 2 miles from Existing 11 kV Distribution Line) 12

Detailed Electrification Plan for Thandwe District (Within 2 miles from Existing 11 kV Distribution Line) No Town ship Name of Village To be Electrifi ed No of Hous e Hous e hold Popu lation To be constructed Estimat ed cost (Mil Kyates) Task by regional Cost for 11 kV Line11/0.4 kV Transformer 400 V Lines (Miles ) Estima ted Cost (Mil Kyats) mile Materia l Cost Trans portC ost Const ructio n Cost TotalKVANo Mate rial Cost Tran sport Cost Constr uction Cost Tota l 1. Thandw e Toungup Gwa Total

Detailed Electrification Plan for Thandwe District (Within 2 miles from Existing 11 kV Distribution Line) Toungup (No) Thandwe No. of Villages - 6 Nos Household Estimated Cost (mil kyats) Thandwe No. of Villages - 6 Nos Household Estimated Cost (mil kyats) Gwa (No) Thandwe District No. of Villages - 6 Nos Household Estimated Cost (mil kyats) 14

The Statement of Fiscal Yearly Budget and Electrified Connection for Rakhing State NoNo Fiscal Year State/Region Capital Budget for ESE (mil Kyats) State/Regi on Capital Budget for DRD (mil Kyats) Electrified Connection ON GridOff Grid Total Cost For 11 kV Line & 11/0.4 TR TotalC ost for 400 V Line TotalOff Grid Villa ge (Nos) Consum er (Nos) Villa ge (Nos) Consu mer (Nos) Estimate (RE+BE) Estimate (RE+BE) Budget Estimate (RE+BE) Grand Total

Sr No DescriptionQuantitiesTransported Site 1 11/0.4 kV, 100 kVA Transformer 14Sittwe District PMO Office 2.10 meter Concrete Pole265Sittwe District PMO Office 3. D.S, L.A, D.O.F Set (OR) L.A, Cut Out Fuse Set 14Sittwe District PMO Office 4.12kV SAC Cable 95mm mSittwe District PMO Office V Distribution Panel for 100kVA 14Sittwe District PMO Office 6.Other AccessoryLotSittwe District PMO Office Main Materials List Transported to Sittwe Township 16

Sr No DescriptionQuantitiesTransported Site 111/0.4 kV, 100 kVA Transformer2Sittwe District PMO Office 2.10 meter Concrete Pole102Sittwe District PMO Office 3. D.S, L.A, D.O.F Set (OR) L.A, Cut Out Fuse Set 2Sittwe District PMO Office 4.12kV SAC Cable 95mm Sittwe District PMO Office V Distribution Panel for 100kVA 2Sittwe District PMO Office 6.Other AccessoryLotSittwe District PMO Office Main Materials List Transported to Ponnagyun Township 17

Sr No DescriptionQuantitiesTransported Site 111/0.4 kV, 100 kVA Transformer4Ann Township PMO Office 2.10 meter Concrete Pole283Ann Township PMO Office 3. D.S, L.A, D.O.F Set (OR) L.A, Cut Out Fuse Set 4Ann Township PMO Office 4.12kV SAC Cable 95mm Ann Township PMO Office V Distribution Panel for 100kVA 4Ann Township PMO Office 6.Other AccessoryLotAnn Township PMO Office Main Materials List Transported to Ann Township 18

Sr No DescriptionQuantitiesTransported Site 111/0.4 kV, 100 kVA Transformer2Kyaukphyu District PMO Office 2.10 meter Concrete Pole161Kyaukphyu District PMO Office 3. D.S, L.A, D.O.F Set (OR) L.A, Cut Out Fuse Set 2Kyaukphyu District PMO Office 4.12kV SAC Cable 95mm Kyaukphyu District PMO Office V Distribution Panel for 100kVA 2Kyaukphyu District PMO Office 6.Other AccessoryLot Ramree ESE OfficKyaukphyu District PMO Officee Main Materials List Transported to Ramree Township 19

Sr No DescriptionQuantitiesTransported Site 111/0.4 kV, 100 kVA Transformer6Thandwe District PMO Office 2.10 meter Concrete Pole365Thandwe District PMO Office 3. D.S, L.A, D.O.F Set (OR) L.A, Cut Out Fuse Set 6Thandwe District PMO Office 4.12kV SAC Cable 95mm Thandwe District PMO Office V Distribution Panel for 100kVA 6Thandwe District PMO Office 6.Other AccessoryLotThandwe District PMO Office Main Materials List Transported to Thandwe Township 20

21