Feedthroughs & HV supplies Sven Vahsen 4/1/2015. HV supplies: quotes 10-15 KV CAEN HV supplies are to pricey (~$25k for 8 channels of 15kV) So, I want.

Slides:



Advertisements
Similar presentations
The PL-259 Connector Amphenol Nickel Plated Body Silver Plated Pin
Advertisements

Twisted Pair Cable Dense assembly (OD 5-7 mm) with –Twisted pairs : total 21; 44-pin mm dual row Omnetics connector differential signals single-ended.
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Solenoid Pressure Regulator Check Valve Hand-turn Valve Pipe Clamp L-Bracket Mounting Block Plastic Tubing AN Fitting AN T-Fitting Pressure Sensor Base.
Sales Training Outline 2006 Jeff Roye Product Manager Liquid Tight Strain Reliefs 35 Royal Road Flemington, NJ
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
MOONRAKER ANTENNA. 09 Juin 2006 AT-230 : HF MOBILE RADIO Frequency Range : Any frequency between 2-30 MHz Channel Capacity : Infinite between 2-30 MHz,
IEEE’s Hands on Practical Electronics (HOPE)
January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
O Ring Groove (1) Bolt holes for fastening strongback to TPC wheel (26) SHV feedthroughs to feed HV wires to ABDB on side ports, all connectors are vacuum.
1 W12D2 RC, LR, and Undriven RLC Circuits; Experiment 4 Today’s Reading Course Notes: Sections , 11.10, ; Expt. 4: Undriven RLC Circuits.
Assembly of Conductivity Flow Loop EAS 199B living with the lab (in preparation for calibrating conductivity sensor)
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
LUMI 1 LUMI Mechanical Design Details Bill Ghiorso.
RF Signal Cables W. Udo Schröder, 2011 Principles Meas/Electronics 2 RG59/U coaxial cable (BNC) Stiffer than RG58 75 Ohm impedance Dual shielded cable:
AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
UED ASTA Mechanical Mechanical Design Status Eric Bong 20 May 2014.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
The 13 Amp PLUG Fuse Insulating Casing Live Wire Neutral Cable grip Flexible Copper conductors Earth.
January 15, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Electricity Presentation Enjoy!.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Design of High Voltage System Kyungju Ma & Reno Collaboratiors
Simple Circuits & the Transfer of Electrical Energy
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Electricity and Circuits I can describe an electrical circuit as a continuous loop of conducting materials. I can combine simple components in a series.
4/22/20131BEAST MEETING Reminder of BEAST TDR schedule (expected deliverables in red) April 19 th: – Draft specifications for each beast subsystem We need.
PandaX 实验中的电子学概述 郭国栋 Outline Introduction Original scheme Improved scheme PMT base design in PandaX I and PandaX II Decoupler design in.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
4/22/20131BEAST MEETING Draft Specifications of Micro-TPC System red: to be determined/checked who will provide it, install it, operate it: U. Hawaii group;
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
WA105 General meeting CERN – 21 January 2015 Feedthroughs for the 3x1x1m 3 Franco Sergiampietri ETH Eidgenössische Technische Hochschule Zürich Swiss Federal.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Correspondence with HuntVac. Jan 13 Sven, Thanks for the call. Just to recap (and so I don’t lose my notes): · Redesign AL box vessels. · QTY.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
3/9/20131BEAST KEK CAD style figures needed For NIM paper: 1.Dcube-micro sideview (Marc) 1. for BEAST.
Silicon detectors Other components from previous speakers Run and Preparations Overall impression:  heroic and lucky job, because we assembled exp during.
Plugs and Bulbs Lv3: Identify the parts of a light bulb. Lv4: Wire a plug correctly. Lv5: Explain the safety features of a plug. Entrance Activity Neutral.
BEAST micro-TPC Prototype Construction In charge: Igal / Sven now  later Peter / Igal / Sven Main grad students: Michael & Ilsoo Gas supply, measurement,
Correspondence with HuntVac
Integration of the Spectrometer Solenoid Magnets
LAV HV repair plans Matthew Moulson
Installation of the T600 at Fermilab
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
G. Palacios 02/25/18 E_y field as a function of anode vertical position for 200kV CEBAF gun upgrade G. Palacios 02/25/18.
HCAL HV splice box.
Wiring the Light and Relay
SNS PPU Cryomodule Instrumentation
Making a simple steady hand game
Reservoir Loop.
WA105: Order Status IFAE Thorsten Lux.
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Feedthroughs & HV supplies Sven Vahsen 4/1/2015

HV supplies: quotes KV CAEN HV supplies are to pricey (~$25k for 8 channels of 15kV) So, I want to buy 16 channels of 8kV. Now. Delivery time is 10 weeks. Bonus: We can use the extra channels for other detectors in phase 1 Also will buy one extra NDT 1470 (4x8kV) w/ startup funds for our lab. Can use this for production testing at UH.

HV supplies: Negative currents

Feedthroughs: approach Waiting for quote for welded 316 stainless sideplate w/ welded fdthrus Will in addition get 2 aluminum sideplates w/o holes. We can use these for leaktesting, and mount or own base-plate feedhthrouhgs if we want After first two vessels, decide on stainless+welded versus aliminum+baseplate for the remaining six vessels.

Welded feedthrough quote (Ceramtech) Quoted amount: $7,172 Budgeted amount: $15,848

feedthrough plate Sven Vahsen 3/25/2015

Option1 : welded electrical feedthroughs 2 x threaded hole : for 1/8 NTP fitting cts_home.aspx?part=SS &item=20b6dcb5-5a04-42f1-9df7- a5d3fd3672c3# cts_home.aspx?part=SS &item=20b6dcb5-5a04-42f1-9df7- a5d3fd3672c3# 5 x SHV : 1/2" holes ($60) ments/FA12842SL.pdf Solid Sealing part number FA12842 ($60 / each) ments/FA12842SL.pdf 1 x mil-C 19 pin: 1 1/8” hole ??? Ceramtech part # W _subsubsection.cfm?SectionID=36&Subs ectionID=237&SubSubsectionID= W _subsubsection.cfm?SectionID=36&Subs ectionID=237&SubSubsectionID=215 1 x BNC : 1/2" hole ($35) oughs/instrument_feedthroughs_bnc_si ngleend.cfm?pgid=weld oughs/instrument_feedthroughs_bnc_si ngleend.cfm?pgid=weld swap Swap one of the NTP holes with the BNC hole

We may want to move around the feedthrough locations as shown above – let’s revisit the exact positions after we have 3D CAD in hand

Backup material – please ignore

Open questions Exact positioning – wait for 3D CAD Nickel in HV feedthrough pins – problem? Is there shielding on vacuum side of 10-kV baseplate feedthrough? Exposed option possible?

Option 2: baseplate electrical feedthroughs 1 x SHV : 1.0” hole (1x$225) dthroughs/instrument_feedthroughs _shv5_singleend.cfm?pgid=baseplate dthroughs/instrument_feedthroughs _shv5_singleend.cfm?pgid=baseplate Mil-C: – $480 for 10 pins: roughs/instrument_feedthroughs_multi pin_ms_singleend.cfm?pgid=baseplate roughs/instrument_feedthroughs_multi pin_ms_singleend.cfm?pgid=baseplate – $325 for 10 pins w/ air side plug products/multipin/ms-multipin/multipin-10- pin-700v-10a-baseplate.aspx 2 x threaded hole for 1/8 NTP fitting. < 1/2" (not sure of exact size) swap

Feedthrouhg on long side of vessel SHV-10: $300 _feedthroughs_shv10_singleend.cfm?pgid=baseplate _feedthroughs_shv10_singleend.cfm?pgid=baseplate

Weldable BNC Single side BNC : 1/2" hole ($35) _feedthroughs_bnc_singleend.cfm?pgid=weld _feedthroughs_bnc_singleend.cfm?pgid=weld – Stainless pin, alumina insulation Single side BNC : 1/2" hole ($35) d=MDC&p=i &g=m d=MDC&p=i &g=m61011 – Stainless pin, alumina insulation Single side BNC : 1/2" hole Solid Sealing part number FA10326 ($25) – Nickel pin, not ideal

Weldable 5-kV SHV

Weldable MIL-C 19 pin atalog07/view_subsubsecti on.cfm?SectionID=36&Sub sectionID=237&SubSubsec tionID=215 atalog07/view_subsubsecti on.cfm?SectionID=36&Sub sectionID=237&SubSubsec tionID=215 – Ceramtech part # W W

Other options [Ignore] mini HV: ubsection.cfm?SectionID=35&SubsectionID=2 85&SubSubsectionID=263 ubsection.cfm?SectionID=35&SubsectionID=2 85&SubSubsectionID=263

NPT fittings me.aspx?part=SS &item=20b6dcb5- 5a04-42f1-9df7-a5d3fd3672c3#

# MIL-C pins needed LVDS: 8 (ethernet cable) LV: 2 HIT-OR: 1 Copper plate R/C circuit: total

All from one vendor?