HFT-Beam Pipe D. Beavis BNL March 14, 2012. Overview Update on new Beam pipe –Assembly drawing –Material changes –Length changes Outlook 2 HFT F2F at.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
MICE Meeting at Columbia University June 13, 2003 Implementation of argon gas jacket Edgar L. Black IIT.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Water Tests of Hg System V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting Dec 8, 2006.
Hg Delivery System Fabrication Status V.B. Graves P.T. Spampinato Muon Collaboration Friday Meeting May 5, 2006.
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
John Amann – ILC Mechanical Engineering 11/13/06
RF shield thinning17/05/2013CERNMassimiliano Ferro-Luzzi 1 LHCb upgrade: thin VELO RF shield  Thinning by chemical etching –an investigation on a backup.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
D. Beavis (BNL) HFT Workshop March 10-11, 2009 BNL HFT Beam Pipe and Safety.
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Robert Pak 1 DOE VTX Review June 2, 2009 Mechanical Integration & Safety Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
LQ03 Titanium Pole Length Study Fred Nobrega LQ Collaboration Video Meeting June 27, 2008 BNL - FNAL - LBNL - SLAC.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
RHIC 56 MHz HOM Damper Fundamental Damper Fundamental Power Coupler Pick-ups S. Bellavia January 19 th, 2010.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Robert Pak, FVTX Annual Review, Nov WBS Mechanical Integration Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Engineering Division 1 Phased Cone Proposal Eric Anderssen, LBNL.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
Richard Soluk – U of Alberta – June 9, Upstream Face of VELO.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
Section5.1 Angles and Their Measure
Beam Pipe and Service Support Structure Production Progress
Spectrometer Solenoid Fabrication Status and Schedule
TM0s and TM1 components inventory and procurement schedule
. - t !!l t. - 1f1f J - /\/\ - ' I __.
Update of the impedance of new LHC experimental beam pipes
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
LARP Phase II Secondary Collimator RC-1
Section 4.1 Angles and Their Measure
UPPSALA UNIVERSITY_GERSEMI PROJECT
TRIFLEX® WINDOWS PipingSolutions, Inc. 12 June 2004
Presentation transcript:

HFT-Beam Pipe D. Beavis BNL March 14, 2012

Overview Update on new Beam pipe –Assembly drawing –Material changes –Length changes Outlook 2 HFT F2F at LBNL March 14, 2012

Assembly 3

East end changes HFT F2F at LBNL March 14, Spool piece 30 inches 316 SS Taper shorter and flanges are Al-TI bimetal

West changes HFT F2F at LBNL March 14, Tapered section shorter and has Al-Ti flanges Section from 280cm to 403 cm may be desirable to be SS or Ti for cost purposes

Outlook Awaiting for cost/schedule for NEG coating and heating jacket Determining how to fabricate the Al2219 pipe –May try other alloys –May machine from solid piece –All fabrication awaiting the determination of the Al2219 pipe Still appears that pipe can be complete in time for the next run. Will update as get schedule details Update (3/14/12) –We heard from CERN and they can have the Be pipe NEG coated and wrapped by the end of June. –The Italian company will respond by tomorrow. They need to look up one more price on things. –Also CERN said they could provide the heating material to us so that BNL can wrap the pipes. 6 HFT F2F at LBNL March 14, 2012