US Army Corps of Engineers BUILDING STRONG ® Intracoastal Waterway Setback Guidance Shelley Trulock Project Manager, Programs & Project Management Division.

Slides:



Advertisements
Similar presentations
Project Certification & Encroachments The SR 305 Experience Project Certification & Encroachments The SR 305 Experience.
Advertisements

1. Regulatory Requirements 2. Written Policies & Procedures 3. Documentation of Expenses 4. Managing Cash 5. Efficient Accounting System 6. Budget Controls.
OMB Regulatory Requirements Regulatory Requirements 2. Written Policies & Procedures 3. Documen- tation of Expenses 4. Managing Cash 5. Efficient.
Coastal Use Permit Program Pipeline Permitting Coastal Use Permit Program Pipeline Permitting Scott Angelle, Secretary Louisiana Department of Natural.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
GulfSafe Notification System GULF
BCC PUBLIC HEARING ON BZA #VA , OCTOBER 3, 2013 APPLICANT: YURI FERRO APPELLANT: WILLIAM A DAVIS, SR. and REBECCA M. DAVIS Orange County Zoning.
Section 408 Approval Process (New 408 Regional General Permit)
Florida Department of Environmental Protection Environmental Resource Program Workshop Series 2010/ Exemptions and Self Certification Process.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
FDOT R/W Guidelines Use of License Agreements
Deborah M. Smith United States Magistrate Judge District of Alaska LAWS AND LAW ENFORCEMENT RELATED TO FRESHWATER ECOSYSTEMS Second Asian Judges Symposium.
Acquisition of partial interest EASEMENTS. Does USPAP require a definition of the rights being appraised? Std Rule 1-2(e) Identify the characteristics.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
US Army Corps of Engineers BUILDING STRONG ® Regulatory Program Glen Justis Chief, Policy & Administration Regulatory Division Alaska District 2010 Building.
Engineer Circular Requests to Alter USACE Projects
Hydraulic Screening and Analysis Needed for USACE Review
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
HRB Meeting June 9, 2015 City Council Remand of AP 14-02/ZC
Savannah Harbor Expansion Project
Chapter 12.1 The Federal System.
Shoreline Alteration/Dredge & Fill Permit Request Wesley B. and Judith Davis District 5 September 16, 2008 Environmental Protection Division Environmental.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Cost Principles – 2 CFR Part 200 Subpart E U.S. Department of Education.
Bureau of Watershed Management Regulatory Proposal Chapter 105 Dam Safety and Waterway Management February 21, 2007.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Cooperating Agencies & Coordination Federal Land Policy and Management Act (FLPMA) and BLM Regulations Federal Coordination with Local Government Hosted.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Bilingual Students and the Law n Title VI of the Civil Rights Act of 1964 n Title VII of the Elementary and Secondary Education Act - The Bilingual Education.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Interpretation of the US Constitution US Supreme Court before 1830.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
Building Strong! May Deep Draft Navigation Cost Sharing Jeremy LaDart Office of Water Project Review HQUSACE.
Building Strong! May Deep Draft Navigation Module 2011 Planning Associates Class Jeremy LaDart Office of Water Project Review HQUSACE Mission Overview.
Revoking Consent for Special Education Services COSA Fall Special Education Conference October 2009 Rae Ann Ray Office of Student Learning & Partnerships.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Presented to: By: Date: Federal Aviation Administration Noise 101: Federal Noise Laws and Regulations Town of Payson M.L. Chittick, Scottsdale FSDO January.
AV Training Presentation 3 33 CFR, Part 66 Private Aids to Navigation.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
Request to Alter USACE Projects
Island County Planning and Community Development Permitting 101.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
Department of Army Permitting Process: Dredging
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
Submerged Lands Leasing Program Dan Prichard Bureau of Parks and Lands Department of Conservation.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
§ 1983.Civil action for deprivation of rights Every person who, under color of any statute, ordinance, regulation, custom, or usage, of any State or Territory.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
Applicant: Robert Ganem Addresses: 7304 & 7312 Black Oak Lane Planning Commission Meeting – August 21, 2015.
Lions, Tigers, Coast Guard Permits – Oh My!
Washoe County Board of Adjustment June 1, 2017
Flood Damage Prevention Code Update
Continuing Authorities Program
Aiding Navigation through Centralizing Information Dissemination
May 7, 2018 Milton Boyd, U.S. Army Corps of Engineers*
GulfSafe Notification System
Michigan Dept. of Environmental Quality Water Resources Division
GOVERNMENT OBLIGATIONS AND SERVICES
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Intracoastal Waterway Setback Guidance Shelley Trulock Project Manager, Programs & Project Management Division Tori White Deputy, Regulatory Division September 13, 2014

BUILDING STRONG ® Outline  Navigation & Dredging Requirements  Requirements for Structures -  Setback Guidance  Questions

BUILDING STRONG ® Federal Waterway Navigation  Congressionally authorized project  12’ deep x 125’ wide, Jacksonville to Fort Pierce  10’ deep x 125’ wide, Fort Pierce to Miami  Corps must maintain a safe waterway  Efficient and cost-effective  Limited federal funds  Contributed funds  Partnership with FIND

BUILDING STRONG ® Federal Waterway Navigation  Various sections at minimum width to maintain current navigation needs  All structures can affect navigation, safety and the Corps’/FIND’s ability to maintain the channel

BUILDING STRONG ® Impact of Structures on Waterway Maintenance  Growing number of fixed shoreline structures ► Docks ► Dock pilings ► Bulkheads ► Rock revetments ► Boatlifts ► Moored vessels ► Marginal docks

BUILDING STRONG ® Impact of Structures on Waterway Maintenance Channel shoaling + Channel conditions on the waterway = Potentially dangerous situations and maintenance difficulty

BUILDING STRONG ® Impact of Structures on Waterway Maintenance  Must manage the waterway smartly! ► The decisions we make now will have impacts later

BUILDING STRONG ® Typical Dredging Method for Shallow Waterways  Due to limited maneuver space, shallow waterways require different types of operations than deep waterways  Anchor booms move the dredge left to right  Dredge is propelled forward by rear spuds

BUILDING STRONG ® A Clear Federal Channel

BUILDING STRONG ® Federal Channel with Docks/Structures Federal Channel with Docks/Structures

BUILDING STRONG ® Distance Dredged Before Repositioning  Impact on dredging of structures placed at following distances from edge of federal channel :  No structure(s) 150’ dredged before repositioning  100’ from channel edge 50’ dredged before repositioning  62.5’ from channel edge 32’ dredged before repositioning  36’ from channel edge 22’ dredged before repositioning  30’ from channel edge 19’ dredged before repositioning

BUILDING STRONG ® Distance Dredged Before Repositioning  The closer the structure to the edge of the federal channel, the more frequent the dredge must be repositioned.  The more frequently the dredge has to be repositioned, the longer dredging takes and the more it costs.  Limited federal funding  Increased cost to dredge = more contributed funds from FIND

BUILDING STRONG ® Requirements for Structures in Federal Navigation Waterways  Obtain Department of the Army Permit  Obtain Consent to Easement and §408 approval if within right-of-way ► Ensure no unreasonable obstruction to navigation ► Maintain integrity of federal project

BUILDING STRONG ® History of Regulating Navigation  1155 First of Nottingham Charters: Clear River Trent of fish weirs that impeded navigation  1215 Magna Carta: “All fish weirs shall be removed from the Thames, the Medway and throughout the whole of England, except on the seacoast.”  1607 English colonies: Followed common law of England, including the public right to navigation.  1787 U.S. Constitution: States gave to U.S. Congress the right “to regulate commerce with foreign nations, among the states, and with Indian tribes.” (Commerce Clause)  1899 Rivers and Harbors Act: Rewrite of 1890 Act

BUILDING STRONG ® Consideration of Property Ownership “A riparian landowner’s general right of access to navigable waters of the United States is subject to the similar rights of access held by nearby riparian landowners and to the general public’s right of navigation on the water surface. In the case of proposals which create undue interference with access to, or use of, navigable waters, the authorization will generally be denied.” - 33 CFR (g)(3)

BUILDING STRONG ® Structures for Small Boats (1) In the absence of overriding public interest, favorable consideration will generally be given to applications from riparian owners for permits for piers, boat docks, moorings, platforms and similar structures for small boats. Particular attention will be given to the location and general design of such structures to prevent possible obstructions to navigation with respect to both the public's use of the waterway and the neighboring proprietors' access to the waterway. Obstructions can result from both the existence of the structure, particularly in conjunction with other similar facilities in the immediate vicinity, and from its inability to withstand wave action or other forces which can be expected. District engineers will inform applicants of the hazards involved and encourage safety in location, design, and operation. District engineers will encourage cooperative or group use facilities in lieu of individual proprietary use facilities CFR 322.5(d)

BUILDING STRONG ® “District engineers are authorized to deny permits without issuing a public notice or taking other procedural steps…where he determines that the activity will clearly interfere with navigation…” - 33 CFR 325.8(b)

BUILDING STRONG ® Permit Special Condition “The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States.”

BUILDING STRONG ® Setback Guidance History  The first official setback criteria for the IWW in Florida was established in  Where normal high water shoreline is >60 feet from the near design edge of the channel, structures shall not be located less than 60 feet from edge.  Where normal high water shoreline is <60 feet from the near design edge of the channel, structures/vessel shall not be allowed closer than 10 feet from edge.  Updated in The only change was to go from a standard of 60 feet to 80 feet and make absolute minimum distance 25 feet rather than 10 feet.

BUILDING STRONG ® Setback Guidance History  Amended in 1968 to change from a standard of 80 feet to 100 feet.  First “modern” version of setback in 1996  “Need” to be located less than standard setback  “Substantial justification” if closer than < 72.5 feet  Approval of marginal docks located < 62.5 feet  Amended in 1998  Placement of docking structures only < 62.5’  Establishes absolute minimum at “top of slope.”  Required X&Y coordinates.  Provided application of setback to existing structures proposed to be repaired, modified, or replaced. 20

BUILDING STRONG ® Revised Setback Guidance  Current version released 18 July 2013 and revised 18 December 2013  Allows for safe navigation and effective operation and maintenance of federal channel  Structures should be no closer than 100’ of the near design edge of the channel  With proper justification, variances allow for structures to be located a lesser distance from the near design edge of the channel

BUILDING STRONG ®  Reiterates allowance for the placement of docking structures only less than 62.5’ from edge of channel  Requires proof that dredging would not be allowed for proposals located less than 62.5’ from the edge of channel  Expands restrictions to include riprap, submerged bulkheads and wave breaks - generally not allowed less than 62.5’ from near design edge of channel Revised Setback Guidance

BUILDING STRONG ®  Adds width restriction for structures located less than 62.5’ from near design edge of channel.  Revises absolute minimum setback from 3X project depth (top of slope) to 3X project depth plus 2’.  Provides application of setback to existing structures proposed to be repaired, modified, or replaced. Revised Setback Guidance

BUILDING STRONG ® Federal Land Interests  Corps has land interests, generally easements, associated with federal projects  Land encumbered by federal interests cannot be disposed unless the land interest is no longer needed in support of the operation, use, and maintenance of the federal project  A Consent to Easement authorizes permanent structures on federal land interests  Failure to obtain a Consent to Easement invalidates a Department of the Army regulatory permit  Federal regulation has zero tolerance for unauthorized encroachments on federal land interests  Title 36 CFR Section

BUILDING STRONG ® Modifications of Federal Projects  Pursuant to Section 14 of the RHA (33 U.S.C. 408) the Secretary of the Army may grant permission to alter a USACE civil works project if ► Does not impair usefulness of the project ► Not injurious to the public interest “Requests to Alter USACEProjects” published on July 31, 2014  Engineer Circular “Requests to Alter USACE Projects” published on July 31, 2014 Only applies to alterations within Real Estate Interests  Only applies to alterations within Real Estate Interests  Section 408 approvals are distinct from and must be granted prior to any Department of the Army regulatory permit

BUILDING STRONG ® Role of the Non-federal Sponsor  Because non-federal sponsors are cost-share partners and/or have O&M responsibilities – ► Section 408 requests must come from or have written concurrence of the non-federal sponsor ► If there are multiple sponsors, each sponsor must provide concurrence ► Written acknowledgment and acceptance of any new O&M requirements

BUILDING STRONG ® Federal Channel

BUILDING STRONG ® Questions?