Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland www.cern.ch/i t CF CERN IT Facility Planning and Procurement HEPiX Fall 2010 Workshop.

Slides:



Advertisements
Similar presentations
RAL Tier1: 2001 to 2011 James Thorne GridPP th August 2007.
Advertisements

CERN IT Department CH-1211 Geneva 23 Switzerland t Marcin Blaszczyk, IT-DB Atlas standby database tests February.
Building a Sustainable Data Center Matthew Holmes Johnson County Community College.
Linux Clustering A way to supercomputing. What is Cluster? A group of individual computers bundled together using hardware and software in order to make.
S. Gadomski, "ATLAS computing in Geneva", journee de reflexion, 14 Sept ATLAS computing in Geneva Szymon Gadomski description of the hardware the.
12. March 2003Bernd Panzer-Steindel, CERN/IT1 LCG Fabric status
The CERN Computer Centres October 14 th 2005 CERN.ch.
StorCast Enterprise Storage Resource Management. What is Enterprise Storage Resource Management?
CERN IT Department CH-1211 Genève 23 Switzerland t Options for Expanding CERN’s Computing Capacity Without A New Building Medium term plans.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Business Continuity Overview Wayne Salter HEPiX April 2012.
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Michal Kwiatek, Juraj Sucik, Rafal.
HEPiX 21/05/2014 Olof Bärring, Marco Guerri – CERN IT
Introduction to HP LoadRunner Getting Familiar with LoadRunner >>>>>>>>>>>>>>>>>>>>>>
Server Virtualization: Navy Network Operations Centers
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Remote Hosting First Experiences Wayne Salter (with input.
FZU Computing Centre Jan Švec Institute of Physics of the AS CR, v.v.i
CERN IT Department CH-1211 Genève 23 Switzerland t Tier0 Status Tony Cass (With thanks to Miguel Coelho dos Santos & Alex Iribarren) LCG-LHCC.
David Hutchcroft on behalf of John Bland Rob Fay Steve Jones And Mike Houlden [ret.] * /.\ /..‘\ /'.‘\ /.''.'\ /.'.'.\ /'.''.'.\ ^^^[_]^^^ * /.\ /..‘\
Farm Completion Beat Jost and Niko Neufeld LHCb Week St. Petersburg June 2010.
CERN - IT Department CH-1211 Genève 23 Switzerland t Tier0 database extensions and multi-core/64 bit studies Maria Girone, CERN IT-PSS LCG.
1 Maintain System Integrity Maintain Equipment and Consumables ICAS2017B_ICAU2007B Using Computer Operating system ICAU2231B Caring for Technology Backup.
Experience with procuring, deploying and maintaining hardware at remote co-location centre CHEP’13 14 th October 2013 Afroditi XAFI, Alain GENTIT, Anthony.
CERN IT Department CH-1211 Genève 23 Switzerland t Tier0 Status - 1 Tier0 Status Tony Cass LCG-LHCC Referees Meeting 18 th November 2008.
Using Virtual Servers for the CERN Windows infrastructure Emmanuel Ormancey, Alberto Pace CERN, Information Technology Department.
CERN - IT Department CH-1211 Genève 23 Switzerland The Tier-0 Road to LHC Data Taking CPU ServersDisk ServersNetwork FabricTape Drives.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter / Vincent Doré.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
 Indentify problems that can occur if hardware is not properly maintained.  Identify routine maintenance that can be performed by users.  Identify.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
Operating Systems & Information Services CERN IT Department CH-1211 Geneva 23 Switzerland t OIS Update on Windows 7 at CERN & Remote Desktop.
BNL Tier 1 Service Planning & Monitoring Bruce G. Gibbard GDB 5-6 August 2006.
CEA DSM Irfu IRFU site report. CEA DSM Irfu HEPiX Fall 0927/10/ Computing centers used by IRFU people IRFU local computing IRFU GRIF sub site Windows.
CERN - IT Department CH-1211 Genève 23 Switzerland t Oracle Real Application Clusters (RAC) Techniques for implementing & running robust.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
CERN IT Department CH-1211 Genève 23 Switzerland t Frédéric Hemmer IT Department Head - CERN 23 rd August 2010 Status of LHC Computing from.
ATLAS Tier 1 at BNL Overview Bruce G. Gibbard Grid Deployment Board BNL 5-6 September 2006.
News from Alberto et al. Fibers document separated from the rest of the computing resources
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF Automatic server registration and burn-in framework HEPIX’13 28.
Working group for optimized Computing Capacity Lifecycle Planning Created after ISM meeting 16 th of June Members: Tim B, Eric G, Helge, Massimo, Carles,
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Computing Jiří Chudoba Institute of Physics, CAS.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
Virtualization Supplemental Material beyond the textbook.
Status of India CMS Grid Computing Facility (T2-IN-TIFR) Rajesh Babu Muda TIFR, Mumbai On behalf of IndiaCMS T2 Team July 28, 20111Status of India CMS.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF Agile Infrastructure Monitoring HEPiX Spring th April.
Energy Savings in CERN’s Main Data Centre
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF Hardware failures Wayne Salter on behalf of Olof B ärring.
CERN IT Department CH-1211 Genève 23 Switzerland t Migration from ELFMs to Agile Infrastructure CERN, IT Department.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Facilities Evolution Wayne Salter HEPiX May 2011.
CERN IT Department CH-1211 Genève 23 Switzerland t SL(C) 5 Migration at CERN CHEP 2009, Prague Ulrich SCHWICKERATH Ricardo SILVA CERN, IT-FIO-FS.
The Worldwide LHC Computing Grid Frédéric Hemmer IT Department Head Visit of INTEL ISEF CERN Special Award Winners 2012 Thursday, 21 st June 2012.
CERN - IT Department CH-1211 Genève 23 Switzerland t Power and Cooling Challenges at CERN IHEPCCC Meeting April 24 th 2007 Tony Cass.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CC Monitoring I.Fedorko on behalf of CF/ASI 18/02/2011 Overview.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF SINDES Secure INformation DElivery System CERN IT/CF-ASI.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
Interaction with Vendors that Support the PFMS: Experience of Kazakhstan Treasury Committee of the Ministry of Finance of the Republic of Kazakhstan, 2016.
Surviving a Mainframe Upgrade APPA – Business & Finance Conference Minneapolis, Minnesota September 19, 2006 Wayne Turnbow IS Department Manager.
CERN Disk Storage Technology Choices LCG-France Meeting April 8 th 2005 CERN.ch.
1 OF 17 INFORMATION TECHNOLOGY CAPITAL PLANNING FOR YOUR ENTERPRISE Steven Carpenter 14 October 2006.
CERN IT Department CH-1211 Genève 23 Switzerland Benchmarking of CPU servers Benchmarking of (CPU) servers Dr. Ulrich Schwickerath, CERN.
Enterprise Vitrualization by Ernest de León. Brief Overview.
Extreme Scale Infrastructure
Cluster Status & Plans —— Gang Qin
CERN Data Centre ‘Building 513 on the Meyrin Site’
Luca dell’Agnello INFN-CNAF
Oxford Site Report HEPSYSMAN
The Greening of IT November 1, 2007.
Presentation transcript:

Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN IT Facility Planning and Procurement HEPiX Fall 2010 Workshop Olof B ärring, CERN IT/CF CERN IT Facility Planning and Procurement

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Outline Team & Tasks IT facility Hardware inventory Procurement Conclusions CERN IT Facility Planning and Procurement - 2

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Team & Tasks IT re-org in effect from Jan’10 Computing Facility group (CF) “ Management and operation of the CERN Computer Centre and associated Computing Facilities.” –Automated Services for Infrastructure (ASI) –Facility Planning and Procurement (FPP) –System Administration and Operation (SAO) CERN IT Facility Planning and Procurement - 3

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Team & Tasks IT re-org in effect from Jan’10 Computing Facility group (CF) “ Management and operation of the CERN Computer Centre and associated Computing Facilities.” –Automated Services for Infrastructure (ASI) –Facility Planning and Procurement (FPP) 3 staff: Andras Horvath, Eric Bonfillou + me 2 students: Michael Scott, Imre Szebenyi (fellow) –System Administration and Operation (SAO) CERN IT Facility Planning and Procurement - 4

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Team & Tasks Technical responsible for procurement of servers and storage –Planning –Technical spec and questionnaire –Validation of bids –Liaise with purchasing and accounts payable services Hardware expertise –Follow-up systematic issues –Liaise with vendors –Maintain BIT suites and assist benchmarking Asset management –Maintain up-to-date inventory –Systematic tracking of FW, BIOS – plan and coordinate deployment campaigns –Track warranty service performance Vendor contacts –Regular warranty service reviews –Organize information/roadmap meetings CERN IT Facility Planning and Procurement - 5

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Planning and coordinatecommercial procedures (tenders) Facility Planning & Procurement CERN IT Facility Planning and Procurement - 6 FPP IT resource mgr, Service responsible Users IT operations & sysadmins Vendors DPO, Purchasing Planning h/w resource provisioning Installation/removal planning

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Outline Team & Tasks IT facility Hardware inventory Procurement Conclusions CERN IT Facility Planning and Procurement - 7

CERN IT Department CH-1211 Geneva 23 Switzerland t CF IT facility CERN IT Facility Planning and Procurement - 8

CERN IT Department CH-1211 Geneva 23 Switzerland t CF x2 Installation & removal CERN IT Facility Planning and Procurement - 9

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Installation & removal CERN IT Facility Planning and Procurement - 10 x 63

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Machine room considerations Machine room –Total available electrical power: 2.9MW –Power distribution in main machine room: 50kW per PDU feeding row of 15 racks  average 3-4kW/rack –Power distribution in vault allow for ~10kW/rack in water cooled racks (WCR) Available power committed –Cannot install without a prior remove Example: remove 388 servers for installation of 350 disk servers (12PB raw) –Consolidate CPU workers to WCR –Disk (DAS) servers in air cooled racks 8 x 4U CERN IT Facility Planning and Procurement - 11

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Outline Team & Tasks IT facility Hardware inventory Procurement Conclusions CERN IT Facility Planning and Procurement - 12

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Inventory CERN IT Facility Planning and Procurement - 13 Number of racks: 841 Number of systems: 11,320 Number of processors: 15,321 Number of cores: 57,651 SPEC CPU2006: 404,279 Raw HDD capacity (TiB): 61,137 Number of HDD's: 62,608 Memory capacity (TiB): 142 Memory modules: 50,775 Number of RAID controllers: 3,871 Current power consumption (kW): 2,486 Current power consumption (kVA): 2,622

CERN IT Department CH-1211 Geneva 23 Switzerland t CF SLS CERN IT Facility Planning and Procurement - 14

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Inventory  trends CERN IT Facility Planning and Procurement - 15 Woodcrest Harpertown Nehalem Westmere

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Inventory  trends CERN IT Facility Planning and Procurement - 16

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Inventory  tracking Serial numbers recorded in Cdb since 2009 Can be used for tracking repairs –Component change  new SN No Lemon sensor (yet) but daily cron-job –Dumps a snapshot of all SNs from Cdb –Compare with dump from previous day CERN IT Facility Planning and Procurement - 17

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Inventory  tracking CERN IT Facility Planning and Procurement - 18 Vendor replaced full batch of 1680 disks

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Inventory  tracking CERN IT Facility Planning and Procurement - 19

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Inventory  tracking CERN IT Facility Planning and Procurement - 20 HDD failures/week:30 Hours/week: 168  hrs/failure: 5.6 drives in the centre: 62,608  MTTF = 350,604 hrs <<1.2Mhrs!? 

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Outline Team & Tasks IT facility Hardware inventory Procurement Conclusions CERN IT Facility Planning and Procurement - 21

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Procurements in 2010 Sustained the 2009 ‘rate’ up to August –CERN wide budget cuts Impact of budget cuts –Postponed EOY tenders to kHS06 and 6PB (12PB raw) –Extend warranty where appropriate/applicable Opening for some competition –Last CPU tender split 2U Twin 2 dual Intel (L5640), 36GB RAM, 141HS06 1U quad AMD (6164HE) batch, 96GB RAM, 319HS06 –Also some promising bids with alternative chassis CERN IT Facility Planning and Procurement - 22

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Procurement – issues Early failures (or infant mortality) –Better burn-in tests  less problems in prod –But … acceptance time increases Resources unusable 3-4 months delayed prod deployment not unusual Waste of electrical- and man-power  –High risk even with split adjudication Degrading warranty service –30 – 50% missed repair target not unusual –Monitored but lack commercial means to put real pressure Low margin bidders can go bankrupt –Elonex (CH) in 2008 –Melrow (NL) in 2008 –CPI (DE) this year CERN IT Facility Planning and Procurement - 23 From Wikipedia, the free encyclopedia: Commodity computing is computing done in commodity computers as opposed to supermicro computers or boutique computers. Commodity computers are computer systems manufactured by multiple vendors, incorporating components based on open standards.

CERN IT Department CH-1211 Geneva 23 Switzerland t CF Conclusions Installation/removal planning & IT are intimately coupled through electrical power constraints Up-to-date inventory underpins an optimal management of deployed assets –Trending and issue tracking –Identify and eliminate inefficient (Watts/capacity) resource Need to learn to cope with undesired side effects of strong competitive tendering CERN IT Facility Planning and Procurement - 24