LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.

Slides:



Advertisements
Similar presentations
Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

February 2009 Summary of Chamonix 09 Steve Myers.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
New HV test specification for the LHC N. Catalan for the EI section.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
LHC Status ReportLHC Status Report Lyn Evans 96 th LHCC meeting, CERN 19 th November 2008.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Consolidation and Upgrade plans for the LHC Vacuum System
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
January 4, 2007 RHIC II Project Internal Cost Review Existing RHIC power supply Modifications Don Bruno & George Ganetis January 4, 2007 Power Supply Modifications.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
B. Todd, A. Apollonio, M. Kwiatkowski, R. Schmidt, S. Wagner, J. Walter a Risk-Based Approach 1v2 to Machine Protection Systems.
SC Undulators protection and commissioning W. Venturini Delsolaro Acknowledgements: R. Denz, R. Maccaferri.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
MQXC Nb-Ti 120mm 120T/m 2m models
HL-LHC IT STRING and Series test of SC link
Roadmap for triplet cryostats
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
The HL-LHC Circuits: Global View and Open Questions
LHC schedule.
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
LHC Dipole Diode Insulation Consolidation Review (I) INTRODUCTION
Consequences of warming-up a sector above 80 K
Powering the LHC Magnets
Hollow e- lens, Cryogenic aspects
Renovation of the 45-year old PS magnets
J.M. Jimenez On behalf of TE-VSC group
Circuits description and requirements - Closed Session-
K. Foraz on behalf of OSS members
TEST PLANS for HL LHC IT STRING
Teleconference ACS – FREIA 20th February 2018
Machine Protection Xu Hongliang.
LHC installation status
US-LARP Task: IR Commissioning
US-LARP Task: IR Commissioning
Review of hardware commissioning
Presentation transcript:

LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever possible. Open W bellows for MLI protection. Elsewhere (few special cases) install at -55 degrees Elsewhere (few special cases) install at -55 degrees Later changed to installation at 50 degrees (February 18) Later changed to installation at 50 degrees (February 18) Sector 12 magnet with 100nΩ resistance - opened Sector 12 magnet with 100nΩ resistance - opened No or very little solder on one half-moon splice No or very little solder on one half-moon splice Sector 67 magnet with 50nΩ resistance Sector 67 magnet with 50nΩ resistance Decided to remove (January 28) – will be cycled in SM18 Decided to remove (January 28) – will be cycled in SM18 Reminder of sector warm up or otherwise Reminder of sector warm up or otherwise warm for dipoles exchange 12 warm for dipoles exchange 67 warm for dipole exchange 67 warm for dipole exchange 56 warm for connecting cryostat repair 56 warm for connecting cryostat repair 23 and 45 empty of helium for transport, held at < 100K 23 and 45 empty of helium for transport, held at < 100K 78 and 81 remain full of helium 78 and 81 remain full of helium

Chamonix 2009 Monday 02 to Friday 06 February 2009 Chamonix Majestic Session 01 - What did we learn without beam in 2008 Session 02 - Safety Session 03 - Repair of 34 Session 04 - Strategy for consolidation to avoid incident and limit collateral damage Session 05 - Shutdown Modifications 2008/9 and Future shutdowns Session 06 - What else can go wrong Session 07 - What did we learn with beam in 2008? Session 08 - What we will do for beam preparation in 2009 Session 09 - What will we do with beam in 2009/10 Session 10 - Summary session Tuesday 18 February 2009 CERN main auditorium Session summaries

Magnet cold testing and measurements Magnet cold testing going well, about on schedule (OP in SM18) Magnet cold testing going well, about on schedule (OP in SM18) Last magnet to go down mid-April Last magnet to go down mid-April No dedicated resistance measurements during the series tests No dedicated resistance measurements during the series tests Measurement methods investigated end of 2008 Measurement methods investigated end of 2008 Data taken during series tests identified Data taken during series tests identified Resistance can be derived from this but only with 15nΩ resolution Resistance can be derived from this but only with 15nΩ resolution Thorough analysis of SM18 data will be done (PH will help) Thorough analysis of SM18 data will be done (PH will help) New setup defined to meet requirements of 1nΩ New setup defined to meet requirements of 1nΩ 6 magnets had been blocked during the recent SM18 tests 6 magnets had been blocked during the recent SM18 tests 4 had been approved after measurements/re-analysis 4 had been approved after measurements/re-analysis MB2420 not accepted, rather opened MB2420 not accepted, rather opened MB 3383 not accepted, rather retested MB 3383 not accepted, rather retested

Sector 34 repair Surface Surface Cold testing going OK Cold testing going OK Beam screen installation the present focus Beam screen installation the present focus Underground Underground D area D area 18 of 53 magnets underground 18 of 53 magnets underground Alignment (with smoothing) required contiguous magnets Alignment (with smoothing) required contiguous magnets So little done So little done Interconnection work running late Interconnection work running late New planning will be needed New planning will be needed Outside D area Outside D area Welding not started (should have happened in January) Welding not started (should have happened in January) Will be knock-on effects Will be knock-on effects Vacuum cleaning ongoing Vacuum cleaning ongoing

Water cooled cables Chlorine in the reinforcement layer (affects 66% of all) Chlorine in the reinforcement layer (affects 66% of all) Cracks (affects 22% of all, some overlap with above) Cracks (affects 22% of all, some overlap with above) Result is that only about 25% are OK (no chlorine, no cracks) Result is that only about 25% are OK (no chlorine, no cracks) All need changing (3 to 4 year campaign) All need changing (3 to 4 year campaign) 3 new cable types tested, best chosen, cables arriving 3 new cable types tested, best chosen, cables arriving Start with worst cables (around points 6 and 4) Start with worst cables (around points 6 and 4) Exchange not easy and could impact on overall planning Exchange not easy and could impact on overall planning Start at point 4 Start at point 4 Change 22 cables Change 22 cables Intervene also at point 6 Intervene also at point 6 During transport at point 4 During transport at point 4 Change 3 cables Change 3 cables

QPS upgrade Large scope Large scope Splice detection AND symmetric quench detection Splice detection AND symmetric quench detection 5500 new printer circuit boards 5500 new printer circuit boards 230km of cable 230km of cable Project Project Detailed planning in place Detailed planning in place Several work packages outsourced (BE-OP, TE-EPC) Several work packages outsourced (BE-OP, TE-EPC) Deadline for completion end of August Deadline for completion end of August External review recommendations External review recommendations UPS upgrade needed to provide redundancy UPS upgrade needed to provide redundancy Cabling the main issue Cabling the main issue Optimisation of use of radiation-hard cable Optimisation of use of radiation-hard cable Interference with magnet transport Interference with magnet transport Planning foresees done by end June Planning foresees done by end June

Undulator L4 Employs 8 coils in series Employs 8 coils in series Each has an energy extraction resistor in parallel Each has an energy extraction resistor in parallel One of them is broken/disconnected on device L4 One of them is broken/disconnected on device L4 3 options 3 options Use undulator as it is Use undulator as it is Add an external resistor to change the response in case of quench Add an external resistor to change the response in case of quench Replace the magnet with the spare Replace the magnet with the spare Since in any case the undulators will eventually need a modification to circumvent an issue with ramping times, for now solution 2 Since in any case the undulators will eventually need a modification to circumvent an issue with ramping times, for now solution 2

Stand alone magnets and inner triplets Relief valves will be fitted according to needs Relief valves will be fitted according to needs IT 24 or maybe 48 if MLI ‘plugging’ serious enough IT 24 or maybe 48 if MLI ‘plugging’ serious enough SAM24 SAM24 Semi SAM21 Semi SAM21 DFBM23 DFBM23 DFBL4 DFBL4 DFBAto be finalised DFBAto be finalised So over 100 relief valves on these elements So over 100 relief valves on these elements PiMs PiMs No failures in LSS seen so far No failures in LSS seen so far The non-conformity at the root of general problem not (as) relevant The non-conformity at the root of general problem not (as) relevant Will not be systematically changed Will not be systematically changed Inspect whenever possible Inspect whenever possible

Running in winter Cryogenic plants Cryogenic plants Start beam operation with single cryoplants at 6 and 8 Start beam operation with single cryoplants at 6 and 8 Check the situation under these conditions Check the situation under these conditions At points 2 and 4 the margins are less, so keep double At points 2 and 4 the margins are less, so keep double Keep all active for Hardware Commissioning Keep all active for Hardware Commissioning Electrical costs Electrical costs Increased compared to LPT due to three factors Increased compared to LPT due to three factors Change in LTP itself Change in LTP itself 8% increase in energy prices 8% increase in energy prices Winter rates Winter rates Total increase is around 13MEuros Total increase is around 13MEuros Winter running contributes about 8MEuros to this (with reduced cryo) Winter running contributes about 8MEuros to this (with reduced cryo) Other aspects to be looked at Other aspects to be looked at

Planning as of February 25

Commissioning schedule (as of March 03)