4/22/20131BEAST MEETING Reminder of BEAST TDR schedule (expected deliverables in red) April 19 th: – Draft specifications for each beast subsystem We need.

Slides:



Advertisements
Similar presentations
Planar-GEM Trackers Bernd Voss Helmholtzzentrum für Schwerionenforschung GmbH (GSI)
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
Micromegas for CLAS12 Central Detector - Update Franck Sabatié November 19th 2009 Micromegas option for the Central Detector Why, Where, How ? R&D milestones.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Description of BTeV detector Jianchun Wang Syracuse University Representing The BTeV Collaboration DPF 2000 Aug , 2000 Columbus, Ohio.
MUON FLUX MEASUREMENTS AT THE LSC JRA1-N2 Meeting, Zaragoza, Nov 23 rd 2007 Héctor Gómez Maluenda, University of Zaragoza.
Recent Progress on D3 - The Directional Dark Matter Detector
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
Applications of Micro-TPC to Dark Matter Search 1. WIMP signatures 2. Performance of the Micro-TPC 3. WIMP-wind measurement 4. Future works 5. Conclusions.
MicroTPCs in SuperBEAST Belle2 Inter Detector Meeting Sep Sven E. Vahsen University of Hawaii Belle2 IDM, Sep 1 '11Sven Vahsen, University of Hawaii1.
TIDE TESTS AT GDD LAB M. Casiraghi and F. Vasi. New detector configuration Low pressure chamber anode.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
1 Liquid Argon Dark Matter: Synergies with R&D for Neutrino Detectors: Chemically clean Argon for drifting electrons and light output (Oxygen and H20 relevant.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Summary of the Electrical Feedthroughs. 2 SFT Channels for the 3x1x1 m 3 N. 6 cold + N. 6 warm on a D=222mm flange (each with 20x68pin connectors)
Beam Halo Monitor : Q-bars+SiPMMike Albrow, 26 Aug 2010 A Beam Halo Monitor for the LHC based on Quartz Cherenkov Counters Mike Albrow (Fermilab) Features:
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Search for the  + in photoproduction experiments at CLAS APS spring meeting (Dallas) April 22, 2006 Ken Hicks (Ohio University) for the CLAS Collaboration.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
M. Garcia-Sciveres July 2002 ATLAS A Proton Collider Detector M. Garcia-Sciveres Lawrence Berkeley National Laboratory.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
The BoNuS Detector: A Radial Time Projection Chamber for tracking Spectator Protons Howard Fenker, Jefferson Lab This work was partially supported by DOE.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
D 3 - Directional Dark Matter Detector Sven Vahsen (U. Hawaii)1 Berkeley Lab Hawaii LBNL Hawaii Investigating feasibility of directional DM search w/ micro-pattern.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
WBS 1.05 Commissioning Detectors Specifications & Design Sven Vahsen University of Hawaii.
4/22/20131BEAST MEETING Draft Specifications of Micro-TPC System red: to be determined/checked who will provide it, install it, operate it: U. Hawaii group;
US Belle II Project – Technical Elements David Asner Pacific Northwest National Laboratory.
Very Forward Instrumentation: BeamCal Ch. Grah FCAL Collaboration ILD Workshop, Zeuthen Tuesday 15/01/2008.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIII SuperB General Meeting DCH-I parallel session Elba, 30 May.
Trigger & Tracking detector for CMS
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
3/9/20131BEAST KEK CAD style figures needed For NIM paper: 1.Dcube-micro sideview (Marc) 1. for BEAST.
BEAST micro-TPC Prototype Construction In charge: Igal / Sven now  later Peter / Igal / Sven Main grad students: Michael & Ilsoo Gas supply, measurement,
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
K2K and JHF-nu muon monitor Jun Kameda (KEK) 1. K2K muon monitor 2. JHF-ν muon monitor 3. Summary International workshop on Neutrino Beam Instrumentation,
The dynamic range extension system for the LHAASO-WCDA experiment
WBS 1.05 Commissioning Detector Specifications & Design
Status of BESIII and upgrade of BESIII
SVT subchapters & editors
Markus Friedl (HEPHY Vienna)
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Entrance Muon Counter (EMC)
Start Detector for pion experiments
Ensuring a successful TPC production
Preliminary Y-chamber specifications – First draft
DCH FEE 28 chs DCH prototype FEE &
BoNuS: Radial-Drift TPC using Curved GEMs
K2K and JHF-nu muon monitor
PADI for straw tube readout and diamonds for MIPs and for high precision tracking beam test – Jülich, Feb Jerzy Pietraszko, Michael Träger, Mircea.
Variable distance from beam.
SVT – SuperB Workshop – Frascati Sept. 2010
Presentation transcript:

4/22/20131BEAST MEETING Reminder of BEAST TDR schedule (expected deliverables in red) April 19 th: – Draft specifications for each beast subsystem We need this soon so that Marc Rosen can make a BEAST cad drawing – BEAST TDR chapter outlines E.g. list of sections and expected figures  Review/dicuss during April 23 rd BEAST meting May 1 st : BEAST TDR draft – Including preliminary or final figures – Review and discuss outstanding issues during May 7 th BEAST meeting May 24 th : BEAST TDR final version: HARD DEADLINE – Sven to integrate w/ US Belle II TDR, send out for final proofreading May 31: Completed US BelleII TDR

4/22/20132BEAST MEETING Micro TPC system Draft Specifications List of TDR Figures Sven Vahsen, Igal Jaegle

4/22/20133BEAST MEETING Draft Specifications of Micro-TPC System red: to be determined/checked who will provide it, install it, operate it: U. Hawaii group; Vahsen, Jaegle (postdoc), Hedges (grad student), Seong (grad student), Rosen (engineer), X (postdoc) expected physics measurements: fast- neutron flux, angular distribution if achievable during T2 – goals discriminate different beam backgrounds so that we can predict neutron flux at higher luminosity verify / tune normalization and angular distribution of neutron flux in simulation space requirements and location in T0,T1,T2 – Approx. dimensions of each TPC: 6"x4"x30cm – 2 TPCs during T0 (1 forward, 1 backward) – 8 TPCs during T1, T2 – Locations of center of TPCs: backward: r=32 cm, z=-122cm Forward: r=37cm, z=199 cm Four phi positions: 0,90,180,270 degrees 30 cm 6“ 4“

4/22/20134BEAST MEETING Draft Specifications of Micro-TPC System red: to be determined/checked DAQ: Input/output signals per TPC – Digital I/O of 4FE-I4 chips (trigger,LVDS in/out, combined ground)  21 per channels per TPC – Analog signal from copper anode: 1 coax per TPC Services – LV: ~2V, analog, digital  4 wires if common power (parallel or serial), 16 wires if individual) – HV: 5kv: 4 CH + GND, 30 kv (field cage): 3 CH + GND – Gas in/out – Cooling: not required – whether you can take care of them all, or need KEK to provide: will/may ask KEK to provide gas Service connections – 32-pin or 50-pin mil spec LV connection on KF40 feedthough – 8 HV on KF40 feedthrough (up to 2 SHV) – 3 swage lock (gas in/out, overpressure) – 1 KF 40 pump port for quick purge Cable thicknesses, pipe diameters – Gas: ¼” stainless steel tubing – Cables: tbd max distance from sensors to closest part of DAQ system / electronics, so that we can reserve space. Location of DAQ. – ~20m (need to check if OK for LVDS and analog readout) 6” 4” 2.08” HV (<=8 pins) LV+DAQ (<=50 pins) KF40 to vacuum pump Pressure relief gas in gas out

4/22/20135BEAST MEETING List of Figures for micro-TPC chapter Schematic of TPC system w/ DAQ and services (Sven) CAD or G4 model of single TPC (Marc, Kamalu) TPC Acceptance criteria vs pre-prototype measured performance – Angular resolution (Ilsoo) – Gain resolution (Tom) – Energy resolution (Ilsoo) – Simulated neutron efficiency (Igal) – Demonstration of neutron detection (Ilsoo & Sven) Simulated neutron & particle flux – In Belle frame (Igal, Ilsoo, Michael) Rate of neutrons through TPC versus momentum, theta, phi – In TPC frames (Igal) Expected theta, phi distributions, time-normalized, for each beam BG Split up into: He-recoil in gas, alphas, protons, EM, other BG TPC efficiency vs momentum (for which direction?) (Ilsoo, Igal, Sven) – Neutrons – Electrons – muons

4/22/20136BEAST MEETING Schematic of TPC system (figure below shows current lab prototyping system, still need to update for BEAST system)