GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping 1  Recall descoping scenarios for 235 and 200 MChF:  Tiziano: https://indico.cern.ch/event/399337/session/0/contribution/0/material/slides/2.pdf.

Slides:



Advertisements
Similar presentations
NDVCS measurement with BoNuS RTPC M. Osipenko December 2, 2009, CLAS12 Central Detector Collaboration meeting.
Advertisements

Particle rate in M1 and M2 Muon Meeting
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
13-Feb-2014 Phase 2 upgrade “ME0 stack options” J. Hauser, UCLA  In Shashlik and CFCAL HE designs, space of  z~30 cm exists behind 10 lambda for muons.
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
Thermal Analysis of short bake out jacket version 1 12-Nov-2013.
US Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev Carnegie Mellon University CMS EMU Meeting, CERN June 18, 2005.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Beam line summary paul drumm for beam line group.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
NuMI Offaxis Near Detector and Backgrounds Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
SPD spill-over and the subtractor Míriam Calvo 23 June 2010.
Digital CFEB Prototype Plans 1 B. Bylsma, CSC Upgrade Workshop, Ohio State Univ., April 23-24, 2010 Ben Bylsma The Ohio State University.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, August 3, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
Alexei Safonov (Texas A&M University) For the EMU community.
CMS EMU CSC Upgrade Digital CFEB B. Bylsma, CMS Upgrade Workshop, FNAL, Nov. 8, Ben Bylsma The Ohio State University.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
R&D status of FPCCD VTX and its cooling system Yasuhiro Sugimoto for FPCCD VTX group 1.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Sensor Choice The story here is surely damage – See that silicon worked well in the PLT test until we shifted the timing to optimize diamond Reducing BX.
Hit rate at high luminosity logical channels - ghosts – efficiency Toy Monte Carlo : # I have assumed a uniform particle distribution inside the TS # I.
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
1 SCA Cell Utilizing Scheme The output of each preamp-shaper channel is sampled continuously at 20 MHz and stored the SCA cells. There are 96 cells for.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson,
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
Digital CFEB (an Update) B. Bylsma, EMU at CMS Week, March 16, Ben Bylsma The Ohio State University.
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
REQUIREMENTS FOR A NEW PIXEL CHIP L. Demaria - Torino INFN Lino Demaria - New Pixel Chip - Torino 01/06/2011.
Phase 2 muon plenary, 11-Feb-2015 Jay Hauser  Based on three main arguments:  Age/reliability  Radiation tolerance  Maintainability  Bonus: L1 trigger.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Stan Durkin CMS Upgrade Week 1 A Digital Pipelined Cathode Front End Board (DCFEB) Stan Durkin The Ohio State University.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
P06 – Muons Alexei Safonov, L2 Manager, September 17, Director's Progress Review --Muon Overview A. Safonov, 2015 September 17.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Trigger & Tracking detector for CMS
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Expected wire accumulated charge at 3000 fb-1 for various chamber types.
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
DCFEB Production for LS2
The Ohio State University
ATLAS-MUON Trigger hardware developments
Machine-Experiment Interface
Optical data transmission for
Not baseline: ASIC, DCFEB R&D if L1A latency > 10 ms
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
CSC Trigger Primitives Test Beam Studies
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
ME1/1 Electronics Upgrade
SLHC CSC Electronics Upgrade Spearheaded by OSU CMS Group
Global Trigger Finds Correct BX
Presentation transcript:

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping 1  Recall descoping scenarios for 235 and 200 MChF:  Tiziano:  CSC does not replace CFEBs by DCFEBs in ME3/1 and ME4/1  Expected to save 2.5 MChF  Allowed because L1A rate limited to 300 kHz, luminosity <5E34  Previously shown curves show data loss is “acceptable” (<1%)  In this presentation:  A more detailed look shows additional data losses, less savings, and more risk than previously documented  Also, comments on the CSC degradation scenario to be used for simulation studies of descoping

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping  Based on limited analog storage in SCA chips of CFEBs (96 cells at 50 ns)  In ME3/1 and ME4/1, expect ~6% if L1A is 700 kHz and L=7.5E34, but <1% data loss under descoped conditions 300 kHz and L=5E34 2 SCAs 8 Cap Delay Cap Storage (Poisson) Cap Digization (Queue) Beam Crossing preLCT L1A·LCT 0.46  sec2.74  sec 26  sec Transfer to DMB Complete Caps can be used for storage when all others in use For HL-LHC this is the main capacitor usage Simple Model CFEB Capacitor Storage ME4/1: 7.5E34 & 750 kHz ME4/1: 5E34 & 300 kHz

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping  Data from CFEBs in to DMB can exceed the capacity of the 1 Gbps optical link from DMBs to the DAQ system  This results in the system going out of sync and CSC needing to request re-sync from cDAQ. The rate grows with luminosity: 3 ~2 kHz resyncs !  Therefore DMBs and DDUs need replacement for ME3/1 and ME4/1 regardless  The 2.5 MChF descoping savings comes from naively taking ~2/3 of the expected total cost for 3 stations  Careful costing shows that in fact only 1.6 MChF is saved by descoping CFEB electronics of ME3/1 and ME4/1 but replacing DMB and DDU

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping  Not (yet) reflected in the data loss curves: 1. 8  13 (14) TeV muon stub occupancy factor 2. Engineering safety factor (especially the large luminosity extrapolation) 3. Effect of new beam pipe and IR layout for LS3 4

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping  CFEB stub occupancy - how to scale?  As n CH in Min Bias? (below) – small effect  As charged particles > P T ? (Data for 3, 9 GeV thresholds at right) – larger effect  We must try to measure it in CFEBs at B=3.8T before end of July 5 CMS-QCD _Figure_007-a.png CMS-FSQ _Figure_007.png

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping  Especially the large extrapolation in luminosity required… safety factor of 50% does not seem excessive 6 5E341E34

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping  New beam pipe  Replace stainless by Aluminum 2219 to reduce radioactivity activation  Will rates in CSC chambers go up or down?  Would like to have “before” and “after” cross-sections of Point 5 region to gain some intuition…  Perhaps BRIL can tell us about the differences in charged and neutral particle fluences in CSC system before end of July?? 7 Phase 2 TP Figs. 11.9, 11.11

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping  Overall: if the product of these three rate factors is >1.5, the situation for CFEBs at 5E34 will be similar to what the data loss plots show for L>7.5E34  Data losses will again be large (>6%) and rapidly climbing 8

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping  The data loss curves are steep functions of luminosity, and as mentioned, subject to some uncertainty in rate  Motivation for the CFEB replacement depends mainly on better quantifying those data loss factors, not the simulation studies  There are other potential sources of CSC inefficiency that can be considered in sim studies to help motivating additional forward stations (GE2/1, RE3/1, RE4/1):  Aging of the electronics (15% loss in ME1/1 during Run 1)  Aging of the chambers (they will vary in their radiation tolerance) – note the recent scare about 4% gain loss in some ME1/1 during 2012 running that could have been aging, but was then traced to HV drift  Choose to take 15% loss of chambers, for all chamber types 9

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping 1. If it was MUCH larger, we would have to fix it 2. Normal electronics degradation in Run 1 was 1%/year. Can be fixed at long shutdowns, but maybe no access in LS3 (thus about 7% by middle of Run 4). The back half of chambers are pretty inaccessible even with access. 3. Electronics is getting older. One example: outer chambers will still have the problematic LV connectors that caused most of the 15% of non-working ME1/1 in Run 1 4. Radiation-induced aging will affect inner chambers more, but is due to electrochemical processes that will not be uniform due to chamber construction variation 10

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping  The CSC data loss plot shown in the TP was insufficient  Did not include the limitations of the 1 Gbps optical fibers from DMB to DDU  We can include the plot of resync rate in the Scoping Document to explain that DMBs and DDUs need to be replaced for all three stations ME2/1 ME3/1 and ME4/1  The CSC descoping savings are overestimated, it is 1.6 MChF, not 2.5 MChF  More careful costing (0.4 M difference), plus needed replacement of DMB and DDU (0.5 M difference)  We have a couple of action items for July:  Measure the increase in CSC rates at 13 TeV and 3.8T  Understand qualitatively the change in CSC rates due the new beam pipe, IR layout of new TAS and quads on rates 11

GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping  Data loss plots – Stan Durkin & Ben Bylsma  Detailed costing – Darien Wood  TC review of MEx/1 electronics replacement (28-May- 2015)  Phase 2 Technical Proposal   Section “CSC replacement of cathode front-end…”  Section 11.6 “Beam pipe” 12