Doc.: IEEE 802.11-05/1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 1 TGn Opening Report – January ‘06 Notice: This document has been prepared.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Advertisements

Jan. 16, 2006 C /09Chair, IEEE Opening January 2006 Interim Session #18 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE /0287r2 Submission January 2006 Adrian Stephens, Intel Corporation TGn Editor Candidate – Adrian Stephens Notice: This document has.
Doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Francisco, California, July 18.
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
Doc.: IEEE /0913r1 Submission Sep 19-23, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Orange County, California, September.
Doc.: IEEE /0308r0 Submission March 2005 J. Walker, Intel Corporation, D. Stanley, Agere SystemsSlide 1 March 2005 ADS Closing Report Notice:
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
February 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0258r0 Submission 11k Brisbane 2 Agendas Notice: This document has been prepared to assist.
Doc.: IEEE /0646r0 Submission July 2005 Richard Paine, BoeingSlide 1 11k Cairns Agendas Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0296r4 Submission March 2007 Stephen McCann, Siemens Roke ManorSlide 1 TGu Agenda Notice: This document has been prepared to assist.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
Doc.: IEEE /0661r0 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Siemens, Roke Manor (Recording Secretary )
Siemens, Roke Manor (Recording Secretary )
TGp Opening Date: Authors: January 2007 Month Year
11k Seattle 3 Agendas Date: Authors: September 2005
TGn Opening Report – January ‘06
TGn ad hoc Opening Report - January ‘07
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
TGn Closing Report – July ‘05
TGn ad hoc Opening Report - January ‘07
TGn Opening Report – January ‘06
TGn ad hoc Opening Report - January ‘07
TGu Agenda Date: Authors: May 2006 May 2006
IEEE WG Status Report – July 2005
TGp September Opening Presentation
Attendance and Documentation for the March 2007 Plenary
TGn Opening Report – January ‘06
ADS Study Group Agenda Date: Authors: January 2005
TGn Opening Report – January ‘06
WAVE Opening Report September /1068 r0
TGn Opening Report – January ‘06
TGu Agenda Date: Authors: January 2007 January 2007
TGu Ad Hoc Agenda Date: Authors: February 2007
TGu Agenda Date: Authors: March 2006 March 2006
Siemens, Roke Manor (Recording Secretary )
TGu Agenda Date: Authors: January 2006 January 2006
Wireless Next Generation (WNG) Agenda
TGn Closing Report – May ‘05
TGn Closing Report – November 05
March 2005 Opening Report Date: Authors: March 2005
TGu Ad Hoc Agenda Date: Authors: February 2007
IEEE r: Fast BSS Transition TG Agenda
IEEE WG Status Report – March 2006
TGu Agenda Date: Authors: March 2007 March 2007
Siemens, Roke Manor (Recording Secretary )
July 2005 Opening Report Date: Authors: July 2005 July 2005
802.11p WAVE Opening and Agenda November p
TGu Agenda Date: Authors: March 2006 March 2006
TGu Agenda Date: Authors: March 2006 March 2006
[place presentation subject title text here]
TGu Ad Hoc Agenda Date: Authors: April 2007 April 2007
TGu Agenda Date: Authors: January 2006 January 2006
TGn Proposed Draft Revision Notice
May 2005 Opening Report Date: Authors: May 2005 May 2005
Report of TGv – September 2006
Siemens, Roke Manor (Recording Secretary )
TGu Ad Hoc Agenda Date: Authors: February 2007
TGu Agenda Date: Authors: January 2007 January 2007
IEEE r: Fast BSS Transition TG Agenda
IEEE r: Fast BSS Transition TG Agenda
TGu Agenda Date: Authors: March 2006 March 2006
IEEE IPR Policy Date: Authors: March 2006 March 2006
TGu Agenda Date: Authors: May 2006 May 2006
Stephen McCann (Chair)
IEEE r: Fast BSS Transition TG Agenda
WNG SC Opening Report Date: Authors: Name Company Address
Presentation transcript:

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 1 TGn Opening Report – January ‘06 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 2 This Opening Report Administrative Intro Attendance server Is not available Mark attendance at registration desk

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 3 6. Patents IEEE standards may include the known use of essential patents and patent applications provided the IEEE receives assurance from the patent holder or applicant with respect to patents whose infringement is, or in the case of patent applications, potential future infringement the applicant asserts will be, unavoidable in a compliant implementation of either mandatory or optional portions of the standard [essential patents]. This assurance shall be provided without coercion. The patent holder or applicant should provide this assurance as soon as reasonably feasible in the standards development process. This assurance shall be provided no later than the approval of the standard (or reaffirmation when a patent or patent application becomes known after initial approval of the standard). This assurance shall be either: a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement either mandatory or optional portions of the proposed IEEE standard against any person or entity complying with the standard; or b) A statement that a license for such implementation will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination. This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. IEEE-SA Standards Board Bylaws on Patents in Standards Approved by IEEE-SA Standards Board – March 2003 (Revised January 2006)

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 4 Inappropriate Topics for IEEE WG Meetings Don’t discuss the validity/essentiality of patents/patent claims Don’t discuss the cost of specific patent use Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions, or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at Approved by IEEE-SA Standards Board – March 2003 (Revised January 2006)

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 5 Attendance, Voting & Document Status If you have Attendance questions during the session talk to Harry Worstell Questions on Voting status, Ballot pool, Access to Reflector – see Harry Worstell – – Make sure your badges are correct Make sure your submissions contain no company logos or advertising

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 6 Attendance Recording A sign-in sheet will be located at the 802 Concierge desk Each member must sign-in “once” (1) per day, between the hours of 0730 and 1730 local time Participants must “sign” their name in the appropriate place and state of attendance for that day in terms of AM1/AM2, PM1/PM2, EV1 (if an evening meeting exists) –Only “sign-in” for yourself, do NOT “sign-in” for and other participate. Attendance will be checked against other 802 groups. Those found abusing the honor system will loose ALL credit for that day. These sheets are provided daily. If you don’t sign up during the “regular sign-in” hours, you will NOT be given credit for that day.

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 7 TGn Quick Review of Events prior to this meeting January ’06 Meeting in Waikoloa, Hawaii, USA

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 8 One Page History of TGn HTSG formed – First meeting 9-11-’02 (Monterey) TGn formed – First meeting 9-15-’03 (Singapore) Began call for proposals May 17 ’04 Presentations - First round (32) Sep 13 ’04 (Berlin) Down selected to one proposal – Mar ’05 –first confirm failed Confirmation #2 failed - reset to 3 proposals -left the May ‘05 meeting with a serious deadlock. (Cairns) 3 proposal groups they indicated that they would agree to participate in a joint proposal activity. TGn met in July ‘05 and agreed to proceed with a merger activity that would continue through the November session. In November ‘05, extended JP to January ‘06

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 9 11n - Overall timeline PAR Approved TGn Formed Selection Process & Criteria Call for Proposals First Proposal Presentations Down Select First WG Letter Ballot First Sponsor Letter Ballot ExCom NESCOM Approval Publication HT SG Formed Joint proposal Confirmation

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 10 Major Documents posted for Nov meeting Submissions r1 JP Opening Report r0 JP Advanced Coding Timeline r1 JP MAC Presentation r2 JP MAC Proposal Text r0 JP PHY Presentation r2 JP PHY Proposal Text r0 JP Closing Report r0 TGn Minutes for Nov meeting r2 TGn Opening Report r0 TGn Closing Report

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 11 Vancouver - Proposed Waikoloa Agenda Plan for Jan ‘06 Between now and January Merged proposal draft posted to server & announced on reflector targeted by Monday, Jan 9 (1 week prior to meeting) January Meeting Plan Presentation of full technical proposal & discussion, Q&A 1st confirmation vote, “no” vote explanations & remedies if <75% “yes” Technical editor election and development of draft text in preparation TG-level review of proposal and text in preparation for March WG LB Coexistence assurance status update Review timeline Between now and next plenary No teleconference calls or interim meetings of TGn are requested

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 12 TGn Minutes of November ’05 05/1148 Executive Summary (also see Chairs’ meeting doc r2 and closing report doc r0): JP team gave a status update (process used, functions agreed to; remaining open issues) in the following documents: – r1 – JP Opening Report – r0 – Advanced Coding Timeline – r1 – MAC Details – r0 – Phy Details JP progress this week was stated in document r1 and can be summarized as “They are 75% complete and confident they will finish the baseline technical proposal at the January Interim meeting.” The current state of the baseline documents is contained in: –Phy – r2 –MAC – r2 The mandate for the Joint Proposal Team was extended through the January Interim Meeting Goals for January meeting: –Comment on Baseline draft proposal –Hold Confirmation vote –Hold a Technical Editor election (assuming vote meets 75% threshold) –Issue call for Internal Review in prep for a March LB

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 13 Approve Minutes Motion to approve November ‘05 TGn minutes as contained in r0 Move: Second:

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 14 Plans for January ‘06

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 15 Posting updates on Jan 14, 15 & 16 ! MitMot, TGn Sync and WWiSE have all agreed that this is the Joint Proposal, and have officially merged their previously posted proposals into this proposal: n Joint Proposal MAC Specification n Joint Proposal PHY Specification n TGn Joint Proposal MAC1 Results n TGn Joint Proposal MAC Simulation Methodology n TGn Joint Proposal MAC Results Additional documents that support the Joint Proposal under consideration: n TGn Joint Proposal MAC2 Results n TGn Joint Proposal MAC3 Results n TGn Joint Proposal FRCC Compliance n TGn Joint Proposal PHY Results r0 JP Opening Report

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 16 Jan ’06- WG Graphic r2

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 17 TGn – Initial January ‘06 Schedule Time MondayTuesdayWednesdayThursdayFriday 8:00-10:00  10 10:30-12:30 2  12 13:30-15:30 4  14 16:00-18:00  6  16 19:30-21:30  8  Jan 16Jan 17Jan 18Jan 19Jan 20 Meeting Room: Grand Ballroom - Monarchy am 1 am 2 pm 1 pm 2 eve

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 18 Jan ’06 TGn Agenda

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 19 Vancouver - Proposed Waikoloa Agenda Plan for Jan ‘06 Between now and January Merged proposal draft posted to server & announced on reflector targeted by Monday, Jan 9 (1 week prior to meeting) January Meeting Plan Presentation of full technical proposal & discussion, Q&A 1st confirmation vote, “no” vote explanations & remedies if <75% “yes” Technical editor election and draft text preparation instructions TG-level review of proposal and text in preparation for March WG LB Coexistence assurance status update Review timeline Between now and next plenary No teleconference calls or interim meetings of TGn are requested

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 20 Agenda Logic Monday Cover required administrative topics, minutes from Nov ’05 Allow JP to present updates to proposal (3 hours allocated) Tuesday Q & A - Interactive discussion (4 hours allocated) Review Thursday agenda plans Wednesday Day of contemplation Thursday Final comments & Q&A Confirmation – typically special order Technical Editor election – Nominations are open Editor instructions to create draft Coexistence Assurance update Update Timeline Plans for March

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 21 TGn – Initial January ‘06 Schedule Time MondayTuesdayWednesdayThursdayFriday 8:00-10:00  Q & A 10:30-12:30 Opening JP Presentation  Q & A 13:30-15:30 JP Presentation Q & A  Confirmation vote 16:00-18:00  Q & A  Technical editor Coexistence Plans for March 19:30-21:30  Q & A  Meeting Room: Grand Ballroom - Monarchy am 1 am 2 pm 1 pm 2 eve Jan 16Jan 17Jan 18Jan 19Jan 20

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 22 TGn – Alternative January ‘06 Schedule Time MondayTuesdayWednesdayThursdayFriday 8:00-10:00  Final JP & Q&A Confirmation vote #1 10:30-12:30 Opening JP Presentation  Comment Resolution 13:30-15:30 JP PHY Q & A  Comment Resolution Confirmation vote #2 16:00-18:00  JP MAC Q & A  Technical editor Coexistence Plans for March 19:30-21:30  Q & A  Meeting Room: Grand Ballroom - Monarchy am 1 am 2 pm 1 pm 2 eve 9am Special order Jan 16Jan 17Jan 18Jan 19Jan 20

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 23 Any other Presentations? Any other agenda items?

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 24 Approve Agenda Motion to approve January ’06 TGn agenda as contained on slide 22 with amendments. Move: Second:

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 25 Posting updates on Jan 14, 15, 16, 17 MitMot, TGn Sync and WWiSE have all agreed that this is the Joint Proposal, and have officially merged their previously posted proposals into this proposal:  n Joint Proposal MAC Specification n Joint Proposal PHY Specification n TGn Joint Proposal MAC1 Results n TGn Joint Proposal MAC Simulation Methodology n TGn Joint Proposal MAC Results  n Joint Proposal MAC Detail n Joint Proposal PHY overview Additional documents that support the Joint Proposal under consideration: n TGn Joint Proposal MAC2 Results n TGn Joint Proposal MAC3 Results n TGn Joint Proposal FRCC Compliance n TGn Joint Proposal PHY Results n Institute for Infocomm Research TGn JP PHY STBC Results r0 JP Opening Report

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 26 First Presentation Joint Proposal Status Report Collaborative status presentations from proposal groups: WWiSE TGnSync MITMOT questions Questions from the floor

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 27

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 28 TGn – Tuesday Agenda Time MondayTuesdayWednesdayThursdayFriday 8:00-10:00  Final JP & Q&A Confirmation vote #1 10:30-12:30 Opening JP Presentation  Comment Resolution 13:30-15:30 JP PHY Q & A  Comment Resolution Confirmation vote #2 16:00-18:00  JP MAC Q & A  Technical editor Coexistence Plans for March 19:30-21:30  Q & A  Meeting Room: Grand Ballroom - Monarchy am 1 am 2 pm 1 pm 2 eve 9am Special order Jan 16Jan 17Jan 18Jan 19Jan 20

doc.: IEEE /1249r2 Submission January 2006 Bruce Kraemer, ConexantSlide 29 Posting updates on Jan 14, 15, 16, 17 MitMot, TGn Sync and WWiSE have all agreed that this is the Joint Proposal, and have officially merged their previously posted proposals into this proposal:  n Joint Proposal MAC Specification n Joint Proposal PHY Specification n TGn Joint Proposal MAC1 Results n TGn Joint Proposal MAC Simulation Methodology n TGn Joint Proposal MAC Results  n Joint Proposal MAC Detail n Joint Proposal PHY overview Additional documents that support the Joint Proposal under consideration: n TGn Joint Proposal MAC2 Results n TGn Joint Proposal MAC3 Results n TGn Joint Proposal FRCC Compliance n TGn Joint Proposal PHY Results n Institute for Infocomm Research TGn JP PHY STBC Results r0 JP Opening Report