20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, 2012 20 - PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
B. Donakowski UCB/SSLFIELDS iCDR – MEP Mechanical 1 SPP FIELDS MEP Main Electronics Package Mechanical Packaging Bill Donakowski
1 PFP MSR, 8/21/2012 Particles and Fields Package Monthly Status Review (MSR) August 21, 2012 Dave Curtis, PFP PM.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
18-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Package Dave Curtis, PFP Package Manager Mars.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Main Electronics Package
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
ASPERA-3 Feb. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 2_25/ Page 1 Monthly Status Report Report due 2/25/01 Schedule statused.
1 PFP QSR, 1/18/2012 Particles and Fields Package Quarterly Status Review (QSR) January 18, 2012 Dave Curtis, PFP PM.
1 PFP QSR, 10/9/2012 Particles and Fields Package Quarterly Status Review (QSR) October 9, 2012 Dave Curtis, PFP PM.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
Monthly Status Review Wednesday, January 18, 2012 LPW/EUV Jim Westfall PM & Will Thompson SE Laboratory for Atmospheric and Space Physics University of.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
1 SPP FIELDS MEP Main Electronics Package Peer Review Bill Donakowski UCB/SSL 18 NOV 2014 MAVEN PFDPU Flight Unit SPP MEP Baseline.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
1 PFP MSR, 9/18/2012 Particles and Fields Package Monthly Status Review (MSR) September 18, 2012 Dave Curtis, PFP PM.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
17-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , PFDPU D. Gordon / W. Donakowski PFDPU Team.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
FIELDS MEP Thermal Vacuum Cycling iPER
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Gayle K. Martin November 14, 2016
Bill Donakowski Mechanical Engineer UCB/SSL
(EFW Systems Engineer) University of California, Berkeley
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS INSTRUMENT SUITE
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS FM4/FM5 INSTRUMENT SUITE
Low Voltage Power Supply & Power Controller Board
Particles and Fields Package Quarterly Status Review (QSR)
0.0 Instrument Suite Name Presenter’s name
CRaTER Pre-Ship Review (I-PSR) Instrument Configuration Bob Goeke
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
GLAST Large Area Telescope
Presentation transcript:

20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission

20-2 MAVEN iPSR Oct 30-31, 2012 Overview Electrical presentation Dorothy Gordon Mechanical presentation W. Bill Bill Donakowski Design/Test Team: Peter Berg (Power) Dennis Seitz (Power and I&T) Chris Tiu (Power and I&T) Timothy Quinn (GSE) Peter Harvey (FSW) Tony Mercer (FSW Test)

20-3 MAVEN iPSR Oct 30-31, 2012 PFDPU Status PFDPU Integrated –Supported PF Suite Integration for EMC and Compatibility testing Vibration and Thermal Vacuum completed Most PFRs have been closed –All are resolved, a few still open pending system retest Operational Hours –Both PFDPU Section (Power Supply + Processor) > 500 hours –Both MAG subsystems: > 500 hours New Heater Filters < 170 Hours –Both DAP (SEP Electronics Boards): > 500 hours –LPW Boards (DFB and BEB): > 250 hours IC replaced on the BEB in October, 2012: < 10 hours Steps remaining prior to delivery to LMA last week of Nov, 2012 –EUV Calibration: 11/1/2012 – 11/2/2012 –MAG Heater CE/CS Testing: 11/3/2012 – 11/4/2012 –Magnetics: 11/5/2012 –PF Final Integration and CPTs: 11/6/2012 – 11/19/2012

20-4 MAVEN iPSR Oct 30-31, 2012 PFDPU Status – PER and PSR May, 2012 PER PFDPU (MAG Integration started) Oct, 2012 PSR PFDPU (all instruments have been integrated, PFDPU has undergone vibration, thermal vacuum, EMC )

20-5 MAVEN iPSR Oct 30-31, 2012 Changes since PER (1) Flight Hardware Finalized –Manufacturing details and circuit trimming documented via PFR and NCRs REG Actuator Deadman Switch Sneak Path Removed (7/2012) –Addition of diode to REG boards –PFR 85 implemented, verified via test IIB Instrument Power Synch Circuit Instability (7/2012) –Instability to “ON” Instrument when subsequent instrument turned on –Synch generation transient triggered Overcurrent Detect subsystem –Common mode side choke removed –PFR 91 implemented, verified via test

20-6 MAVEN iPSR Oct 30-31, 2012 Changes since PER (2) MAG Heater Filters added (9-10/2012) –Change instigated by EMC Test Failure (CE03 and CS101) PFR 108, 109 and 111 –External boxes housing EMI Filters attach to side of PFDPU –Built at GSFC and delivered to SSL on 25 OCT 2012 –Initial Testing verified functionality of MAG Heater Subsystems EMI Emissions/Susceptibility still pending LPW Electronics modified (10/2012) –Change instigated by Thermal Vacuum test anomaly PFR 124 At -30C, one preamp channel failed at 2MHz –BEB and DFB Boards reintegrated on 23 OCT 2012 –LPW CPT passed at ambient following reintegration –Cold case operation verified at LASP

20-7 MAVEN iPSR Oct 30-31, 2012 PFDPU PFRs

20-8 MAVEN iPSR Oct 30-31, 2012 PFDPU About Town First Assembly At EMC Test Facility At Vibration Test Facility In the Thermal Vac Chamber PF Suite Integration in Cleanroom

20-9 MAVEN iPSR Oct 30-31, 2012 PFDPU Requirements Verification (ERD) Magnetics Testing still pending (scheduled for 11/5) Thermal Vacuum Testing completed Sept, 2012 “As run” Procedure and Test Report available on ftp site

20-10 MAVEN iPSR Oct 30-31, 2012 PFDPU Requirements Verification (FRD)

20-11 MAVEN iPSR Oct 30-31, 2012 PFDPU Requirements Verification (ICD - 1)

20-12 MAVEN iPSR Oct 30-31, 2012 PFDPU Requirements Verification (ICD - 2)

20-13 MAVEN iPSR Oct 30-31, 2012 PFDPU Requirements Verification (ICD - 3)

20-14 MAVEN iPSR Oct 30-31, 2012 Trend Monitoring & Offset Calibration PFDPU Telemetry Monitoring looks at Input Power, Internal Regulated Voltages and Internal Temperatures Inboard Electronics (MAG, LPW, SEP) housekeeping/calibration covered by the Instrument Teams Input Current for PFDPU and MAG Heater Subsystem Tracked during CPTs/LPTs and Thermal Vacuum Testing REG based current monitors vary with temperature and PFDPU Section; data compiled from thermal vacuum telemetry.

20-15 MAVEN iPSR Oct 30-31, 2012 PFDPU Resources Power 28V In) No Instruments On (REG + DCB) –Cold (30C): 130 mA –Room Temp: 100 mA (2.8W) –Hot (55C): 110 mA Inboard Instruments –LPW: 175 – 250 mA (mode dependent) –MAG: 150 mA –SEP: 200 mA MASS: latest weigh-in just under 8 Kg. (to be discussed later in Mechanical Presentation)

20-16 MAVEN iPSR Oct 30-31, 2012 References TEST RESULTS/REPORTS MAVEN_PF_TP_046_PFP_FM_IntegrationTest_VersionASRUN.pdf MAVEN_PF_TP_028H_EMC_AsRun.pdf PFDPU_Thermal_Vacuum_Test_PlanASRUN.pdf MAVEN_PF_TR_018_PFDPU_TVAC.docx MAVEN_PF_TR_017_PFDPU_Requirements_Verification_REVA.docx Schematics/Specifications/BOMs & Test Procedures also available Posted at: ftp://apollo.ssl.berkeley.edu/pub/MAVEN/ftp://apollo.ssl.berkeley.edu/pub/MAVEN/

20-17 MAVEN iPSR Oct 30-31, 2012 Changes from PER New MAG Filter Boxes on Side of Box –PFR Generated during EMI/EMC testing –Electrical solution introduced two new Filter Boxes external to PFDPU (GSFC) –Boxes Attached to Studs on Shear Panels –Connectors (J13/J23) moved –Mass Increase of 183 grams –Lower Box blocks LOS access to S/C attach bolt Reworked BEB/DFB (LASP) –PFR Generated during TVAC testing –Electrical solution required rework of PCB –Cards re-installed into PFDPU –No mechanical or mass changes

20-18 MAVEN iPSR Oct 30-31, 2012 Hardware/Testing Status PFDPU Box Build Complete –MAG Filter Boxes Installed (GSFC Reworked Items) –BEB/DFB Boxes Installed (LASP Reworked Items) –All Thermal Treatments Installed –All Box Identification Completed –PFDPU Box in Clean Room at SSL –Shipping Container Ready to go Testing –Full 3 Axis Protoflight Vibration Test Completed 05 SEP 2012 –TVAC Testing Completed SEP 2012 –Workmanship 1-Axis Vibration Test Completed 26 OCT 2012

20-19 MAVEN iPSR Oct 30-31, 2012 Documentation Status Problem/Failures –No Outstanding PFRs Interface to S/C –Final MICD Inspection Ongoing –Need updated MICD from LM showing Filter Boxes –New Filter Box Prevents Installation of Bolt attaching to S/C Several Options Available to Resolve –Use low head height fastener at that location –Remove Lower Filter Box during PFDPU Integration, re-install Item Being worked with L-M

20-20 MAVEN iPSR Oct 30-31, 2012 Documentation Status Mass Properties –Mass Increased due to new Filter Boxes –Increase of 183 Grams –Current measured mass: Kg –Mass Properties Report in-work (CG/MOI)

20-21 MAVEN iPSR Oct 30-31, 2012 Vibration Testing 3 Axis Protoflight Testing –Successfully Completed on 05 SEP 2012 –Performed to Project Specification (12.8 G RMS) –Protoflight protocol qualified entire box design Y Axis Workmanship Shake –Successfully Completed 26 OCT 2012 –Performed to GEVS Standard (6.8G RMS) –Workmanship shake verified re-assy of PFDPU New Filter Boxes Reworked BEB/DFB

20-22 MAVEN iPSR Oct 30-31, 2012 Document Deliverables Status

20-23 MAVEN iPSR Oct 30-31, 2012 Hardware Status Matrix

20-24 MAVEN iPSR Oct 30-31, 2012 PFDPU – Summary Progress since PER in May, 2012 –Initial Integration of Flight PFDPU and PF Instruments CPT/LPTs, compatibility testing and instrument calibration –EMC, Vibration, Thermal Vacuum Testing Next –EUV Cal, MAG Heater CE/CS, Magnetics –Installation of FSW Build 3, Final Package I&T and Verification