GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 4.1.9.7 - Particle Test 1 GLAST Large Area Telescope: Particle Test “Roadmap to Integration”

Slides:



Advertisements
Similar presentations
Introduction This project used cosmic rays to test a prototype Minimum Bias Trigger Scintillator (MBTS) that will be used in the ATLAS experiment at CERN.
Advertisements

GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectI&T&C Particle Beams - Pre PDR Presentation– Oct. 2, 2001 Gary Godfrey1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test A. T. Kavelaars 1 GLAST Large Area Telescope: I&T Integration Readiness.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project Software vrvs meeting X. Chen 1 GLAST LAT Project Software vrvs meeting X. Chen 1 Analyses of Muon Calibration Data Xin Chen.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
1 Gamma-Ray Astronomy with GLAST May 24, 2008 Toby Burnett WALTA meeting.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project Collaboration Meeting 8/30/ Beam Test Plan - SLAC End Station A Secondary Beams Gary Godfrey August 30, 2005 GLAST Collaboration.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Simulations Theodore E. Hierath Louisiana State University August 20, 2001.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectBeam Test Meeting 1/21/2006 L. Latronico1 Beam test activity in Italy Integration & test activities –1x1 tower completed and under test.
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
1 Arecibo Synergy with GLAST (and other gamma-ray telescopes) Frontiers of Astronomy with the World’s Largest Radio Telescope 12 September 2007 Dave Thompson.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
Introduction to gamma-ray astronomy GLAST-Large Area Telescope Introduction to GLAST Science New way of studying astrophysics Schedule of GLAST project.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.2 Visualization Tools 1 Gamma-ray Large Area Space Telescope GLAST.
National Aeronautics and Space Administration November 23, Gamma-ray Large Area Space Telescope (GLAST) Kevin Grady, Project Manager Steven Ritz,
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, February, 27, 2006 CAL features and idiosyncrasies. Alexandre Chekhtman NRL/GMU Gamma-ray Large.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
Aa GLAST Particle Astrophysics Collaboration Instrument Managed and Integrated at SLAC/Stanford University The Gamma-ray Large Area Space Telescope (GLAST)
Upgrading 600L/s IPPS Gustavo Alverio University of Central Florida August 5, 2003.
GLAST LAT ProjectGlast Collaboration Meeting 2005 R. Bellazzini1 Glast beam test at CERN Glast Collaboration Meeting 2005.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
The High Energy Gamma-Ray Sky after GLAST Julie McEnery NASA/GSFC Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT Project IFC Tour – Sep 5,2003 Larry Wai 1 GLAST Large Area Telescope: Integration and Facility Status Larry Wai SU-SLAC Integration and Facility.
1 Study of Data from the GLAST Balloon Prototype Based on a Geant4 Simulator Tsunefumi Mizuno February 22, Geant4 Work Shop The GLAST Satellite.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
Fermi Gamma-ray Space Telescope Searches for Dark Matter Signals Workshop for Science Writers Introduction S. Ritz UCSC Physics Dept. and SCIPP On behalf.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Gamma-ray Large Area Space Telescope -France -Germany -Italy -Japan -Sweden -USA Energy Range 10 keV-300 GeV. GLAST : - An imaging gamma-ray telescope.
Possible Improvement of MUID Performance Itaru Nakagawa, Seyoung Han (RIKEN, Ewha/RIKEN)
An H- stripping laser using commercial, diode-pumped Nd:YAG amplifiers Russell Wilcox Laser Stripping Workshop, April 11, 2011.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
Report of GLAST Balloon Flight October Annual meeting of Astronomical Society of Japan T. Mizuno and other GLAST Balloon Team
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
GLAST Large Area Telescope:
GLAST Large Area Telescope GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Gamma-ray Large Area Space Telescope
Sabra Djomehri SULI 2007 Stanford Linear Accelerator 8/15/2007
Mini Tower Preliminary Results
Integration and Test Organization Chart
Status Report and highlights from workshop II
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Test Readiness Review
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 1 GLAST Large Area Telescope: Particle Test “Roadmap to Integration” March 9th, 2004 Gary Godfrey SU-SLAC Sub-sub-system Manager Gamma-ray Large Area Space Telescope

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 2 The Equipment Van de Graff –100% uptime during EM test –Typically 1 x 10 3  /sec into 4  ster BGO Monitor –100% uptime during EM test Cosmic Ray Scintillator Telescope (24” x 24”) –100% uptime during EM test

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 3 Van de Graff EM Results BGO spectra –VG off (blue) – see cosmics –VG on (red) – see  ’s + cosmics EM sees photons –Tracks point back at target –EM effic for  is as expected –EM psf is as expected # of  s   Energy [Mev] Where Tracks Pass Through Target Plane ~0° Effic =  per steradian seen in EM  per steradian seen in BGO = 1200/(.02 x 2  ster) 1152 sec x Hz /(.15 ster) =.093 ±.01 (due to ±5% BGO dist error)  68 Measured = acos(.88) = 28° (at 0°)  95 Measured = acos(.46) = 63° (at 0°)  target ~ (.75”/2.0”) x (180/  ) = 21°  68 EM PSF ~ sqrt(  68 Measured 2 -  target 2 ) = 21°  95 EM PSF ~ sqrt(  95 Measured 2 -  target 2 ) = 59°

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 4 Van de Graff Rates VG1 Typically achieved For BGO and EM2 [Hz] VG2 (Oil Free) Calculated maximum (not yet demonstrated) [Hz]  rate into Ω=4  sr BGO rate Effic x Ω =.15 sr 1212 x 10 3 EM2 Tkr Trig rate Effic x Ω =.31 sr 2525 x 10 3 LAT Tkr Trig rate Effic x Ω = 3.1 sr x 10 3 Van de Graff has been upgraded to VG2 which has oil free Turbo and Scroll pumps. The interior has also been cleaned of all residual oil. VG2 should be able to saturate EM2 and LAT trigger rates.

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 5 Summary of Data to Be Taken SourceTriggerTotal Triggers WhyRate [Hz] Run Time [Hours] Each TowerCosmics3-in-row5 x 10 5 Compare Towers 208 CosmicsScintillator Telescope 5 x 10 5 Efficiency624 Full LATCosmicsVarious Trigs (FilterOFF) 10 7 TKR survey ACD Effic CosmicsOrbit Trig (Filter ON) 10 7 Filter Effic20016 Van de GraffOrbit Trig (Filter OFF) Mev calib MC 200 VG1 16 Van de GraffOrbit Trig (Filter ON) 10 8 Performance at orbit rates 10,000 VG2 8 “End Too End Test Committee” report will cause this table to be modified.

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 6 Procedures to be Written Completion Date Procedure to setup 3-in-row trigger and tower to acquire cosmic data 6/15/2004 Procedure to setup scintillator telescope and tower to aquire cosmic ray data 7/1/2004 Procedure to run Van de Graff7/1/2004 Procedure to setup Van de Graff and LAT and take data 8/15/2004

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 7 Spare Parts Ordering Spare PartsOrder by Belt (Van de Graff)4/15/2004 Capacitor (ceramic variable tuning)Have(1) Choke (RF HV) Stancor C H 1500 V 85W 200 mA DC4/15/2004 Diode (Focus HV)Have(2) Gas (SF 6 cylinder)4/15/2004 HV supply (belt charging)Have(1) Motor (Control rod)Have(2) Pump (scroll)4/15/2004 Pump (turbo)4/15/2004 Relay (Delay) Amperite 5N030T 9 pin4/15/2004 Resistor (Column) 625 M  Have(4) Resistor (Probe tip) 100K 25WHave(3) Resistor (Focus) 2 M  15% 4/15/2004 Rheostat (Control Rod)4/15/2004 Screen (charging)4/15/2004 Spare source bottle repair4/15/2004 Springs (column)Have(5) Transformer (Probe tip) P-1079 TT-5479 (70,100,115) ->1700 v 5 mA4/15/2004 Transformer (Focus HV) P TT /400 Hz (95,110,125,135)->15 kV 10mA4/15/2004 Transformer (RF HV) P-9321 TT-5494 (95,115,135)-> V 400 mA, 6.3 V 5 A4/15/2004 Tube (5T4)4/15/2004 Tube (6146)Have(3)

GLAST LAT Project I&T Integration Kickoff Meeting 03/09/ Particle Test 8 Verification of Equipment Readiness Completion Date Verify VG2 high rate capability3/19/2004 Verify operation of VG by recording BGO spectrumBi-weekly Verify operation of scintillator telescope by recording cosmic rate Bi-weekly