Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.

Slides:



Advertisements
Similar presentations
The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Advertisements

Construction in the Future
Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Stormwater 101: How to stay out of trouble with TDEC.
What you need to about building your own home! Yes, Some day you might have to build something!!!
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Foundation Systems.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
THE GRAMERCY RESIDENCES CONSTRUCTION UPDATES Century Properties May 2009.
John Osborne GS/SE March 2013
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
We appreciate your co-operation during our works and any guidance you provide to help us minimise the impact we make on your lives will be gratefully received.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
NGfL CYMRU GCaD PLUMBING APPLIANCES & COMPONENTS.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
Unit 8: Waste Management Section 2: Wastewater Treatment.
Wastewater Treatment. Waste water is collected in a sewer system (a series of underground pipes that carry water to facility) Waste water is collected.
PARKING LOT Protecting Chesapeake Bay  Create underground storm water management system to prevent flooding, erosion, pollution of the Bay  Plant bioswales.
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
How Our Earth Sheltered Homes are Constructed Earthlog ® Equity Group, Inc. The American Dream … The Future is Now
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
MAY 10 th, 2010 Visit of Commissioner for Regional Policy – Johannes Hahn in the town of Rousse.
WBS Experiment Infrastructure: LArTF GPP Project Status Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 11/02/12.
Dear Local Resident Kingston Regal Richmond Road, Kingston Upon Thames, Surrey KT2 5ED Welcome to the first issue of our residents newsletter which.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Board of Commissioners Meeting
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Town of Brighton, Department of Public Works
Filter Rehabilitation and Seismic Upgrades – Construction Update
Bond Oversight Committee
TECHNICAL SPECIFICATION AND REQUIREMENTS
PRR Activation Meeting
Progress Charts.
PLUMBING APPLIANCES & COMPONENTS
Pinole-Hercules Water Pollution Control Plant Upgrade Project
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Minuteman Vocational Technical Regional High School Progress
Fred Carlton Field Turf Renovation
Progress Report 11/10/11.
Septic System Construction and Location
Fruita Monument High School Entry Project
Print Reading.
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
In-Class Scheduling Exercise
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Far Experimental Hall - Hutches
Minuteman Vocational Technical Regional High School Progress
Fueling the Future of the Fairbanks North Star Borough
Presentation transcript:

Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014

From Supervisor Langley  Each month I like to update the residents of East Greenbush on the progress at the Waste Water Treatment Plant project site. This is a significant project for the Town that will allow our Town to grow once completed. Every other week, I, along with the commissioner of Public Works, the Building Inspector attend progress meetings on site.  I am happy to report that we are on track for completion of Phase 1 by the end of the year.  If anyone has any questions regarding the construction or the project please don’t hesitate to contact me:

Work Completed September 2014 The contractors completed or were In Progress on the following tasks noted below:  UW Marx – Roof work of the Head Works Building and Solids Building Roof… Flashing, final block work.(In Progress)  UW Marx –Priming and painting of Head Works Building. (In Progress)  UW Marx ‐ Excavation, Rock removal and placement of Electrical and Storm Drainage Piping, Structures. (In Progress)  UW Marx – Rebar has been placed for Secondary Clarifier #5 and Mat Concrete has been poured. Wall rebar and form work (In Progress).  All SWPPP measures installed and in good shape; The Chazen Companies will monitor and report weekly. (On Going)  Monolith ‐ has removed the additional 3 solar panels/towers due to size of excavations for the new secondary clarifier #5, SMH’s and will store them offsite for safety purposes and they will be re ‐ installed when schedule allows. (All 6 ‐ Approximately end of November)  UW Marx ‐ MLSS splitter box at the aeration tank, piping to Secondary Clarifier #5 and Set up for tying in existing MLSS lines. (In Progress)  Stilsing Electric ‐ Working on Interior electric in the Head Works Building, Installation of new Electrical panels, conduits, wiring inside. Also Installation of electrical duct/structure/Vaults on site. (In Progress)  Family Danz – Installation of Roof duct work and Heating Units on both Head Works and Solids buildings. (complete)

The following pictures are of various steps of the progress made during the month.

Headworks Building

New Effluent Channel Sept. 2, 2014

Solids Building Sept. 2, 2014

Headworks Building Sept. 4, 2014

Headworks Building – Roof Planks Sept. 12, 2014

Secondary Clarifier Excavation Sept. 5, 2014

Solids Building Sept.5, 2014

Secondary Clarifier Piping

Inside Headworks Building

New RAS Valve and meter print piping