Provision of Partial Baseband Private Circuits - Change-over Considerations Mike Ainger Transmission Design & Planning Manager Racal Telecom The contents.

Slides:



Advertisements
Similar presentations
Best Available Techniques (BAT)
Advertisements

Evolution of NGN and NGA scenario in Nepal Nepal Telecommunications Authority.
Chapter 3: Planning a Network Upgrade
Offshore Transmission Giles Stevens Head of offshore electricity transmission.
Mod 373 “Governance of NTS Connection Processes”
Committed to connecting the world Ninth ITU Symposium on ICTs, the Environment and Climate Change Kochi, India, 15 December 2014 Damage prevention and.
Slide 1 Access to Bandwidth: Proposals for Action Ilsa Godlovitch Regulatory Policy Directorate
CP Networking1 WAN and Internet Access. CP Networking2 Introduction What is Wide Area Networking? What is Wide Area Networking? How Internet.
Enhancing Access To, and use and Quality of, Information and Communication Technologies.
BS9990 : 2015 Updates and/or Changes
Service Design – Section 4.5 Service Continuity Management.
Fred Howett - Nortel Networks OFTEL INTERNET FORUM - 1st Sept Progress in NICC xDSL Task Group Fred Howett - Nortel Networks.
Connecting to Remote Networks © 2004 Cisco Systems, Inc. All rights reserved. Using Packet Switching in WANs INTRO v2.0—7-1.
Business Continuity Mark Holloway Former Head of Change Management at Co-operative Food.
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Software Engineering – University of Tampere, CS DepartmentJyrki Nummenmaa INSTALLATIONS Software installation accommodates software.
, Kirsi Levä, Jesse Nurmela and Mikko Ojala Investigating a major incident at the Vihtavuori plant and the lessons learned.
Inspection and Testing of Fire Alarm Systems (ITFAS)
© ABB Group Aug-15 Medium Voltage Hard Bus Retro-fill ABB MV Service.
NEBOSH Certificate Essentials
Disaster Recovery Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
1 Customer Network Operations Center. 2 Agenda Overview Benefits Value Additional Services Questions Monitoring Options.
Presented by Manager, MIS.  GRIDCo’s intentions for publishing an Acceptable Use Policy are not to impose restrictions that are contrary to GRIDCo’s.
A PROJECT REPORT ON DIGITAL LOOP CARRIER (DLC) Under the Guidance of MR. A.B. SINGH SUBMITTED BY: PALASH GUPTA NIDHI VERMA A.N. RAMANI P. ANUPAMA LUKESHWARI.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Services Tailored Around You® Business Contingency Planning Overview July 2013.
5-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Office Skills: A Practical Approach 5e by Horsfall and Turner Chapter.
Care Home Forum 19 th May 2015 Sarah Chittock – Merton Civil Contingencies Officer Taryn Milton – Emergency Planning Manager – Epsom St. Helier.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
JDF in the Inter-Enterprise Workflow Achieving JDF workflow automation.
1 Is there a requirement for a Commercial TETRA Operator in Venezuela? Caracas, September 20th 2005.
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
Joint Venture in construction company in West Bank.
7-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2009 Research In Motion Limited Advanced Java Application Development for the BlackBerry Smartphone Trainer name Date.
Value and Supply Chain Management. What is Logistics? The Institute of Logistics defines logistics as the management of the flow of goods, information.
Information Systems Security Operational Control for Information Security.
LLU Update Elizabeth Wilks-Wood Compliance Directorate.
1 Part III Packet Transmission Chapter 7 Packets, Frames, and Error Detection.
a guidance to conversion
Rural Telephony Solution for Africa 1.
Slide 1 Access to Bandwidth The Way Forward Peter Walker Director, Technology OFTEL
THE RIGHTS AND OBLIGATIONS OF EMPLOYER AND EMPLOYEE
Infrastructure Solutions Flexible Adaptable Dependable Reputable.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
Access To Bandwidth Option 2 Product Definition Discussion Discussion is without prejudice to BT’s position with respect to Option 2.
A complete small office communication solution.. 2Phone 2Phone has been designed to meet the communication needs of small offices in a managed and cost.
 One of the simplest devices we have in our house.  very simple because the telephone connection to our house has not changed in nearly a century. Introduction.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
 Introduction to Wide Area Networks 2 nd semester
SEC 480 assist Expect Success/sec480assistdotcom FOR MORE CLASSES VISIT
For more course tutorials visit SEC 480 Entire Course For more course tutorials visit SEC 480 Week 1 DQs SEC 480 Week.
Application Outsourcing: Achieving Success & Avoiding Risk
Transmission Workstream 7th Dec 2006 Chris Logue
Introduction To Telecom
Sub-Loop Extension Service (SLES)
Small Sites Planning & Scheduling
INTERCONNECTION GUIDELINES
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Trends in the Distribution Panel Market - Forecast to 2024.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Busbar Market share research by applications and regions for 2017 – 2024.
Quality Management Systems – Requirements
Business Contingency Planning
Chapter 8. Electrical Systems
TxMAG presentation
Review Group 166 End User Perspectives 20 September 2007 Julie Cox.
University of Houston Networking 102 Dr Fred Zellner
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
while introducing and de-risking new technologies in parallel
Presentation transcript:

Provision of Partial Baseband Private Circuits - Change-over Considerations Mike Ainger Transmission Design & Planning Manager Racal Telecom The contents of this document are for discussion only, and do not represent or imply a commitment by any company to implement of supply any of the technology, processes or products described

Background The order process is likely to result in one of two different implementation scenarios: –New PBPC over previously spare copper pair –New PBLC over copper pair in use for Telephony In the first scenario there is no requirement for a live service change-over In the second a live service change-over must be executed This will in most cases be combined with a number port

Streamlining the Change-over It is in all parties interest that this change-over should be as efficient and interruption-less as possible: –Customer wants minimum service disruption –BT and OLO want to minimise skilled resources, in particular wasted resources co-ordinating timed activities –Public safety consideration - minimum interruption to emergency access

Possible Methods (1) BT installs NT 2000 and test access x-connect as a preparatory step –Also gives opportunity to label any BT owned CPE to avoid accidental recovery by OLO / customer BT Switch Test Access Cross-Connect 1 2 MDF 2w Circuit NT 2000 CPE Property of BT

Number Transfer to the incoming operator to be implemented in advance of the PBPC implementation –Timed visit to port number could be done when OLO installs (but does not bring into service) DSL equipment Possible Methods (2) BT Switch Test Access Cross-Connect 1 2 MDF 2w Circuit Property of BT Property of OLO DSL

If BT could now use the Test Access Cross-connect to remotely transfer the line to the incoming OLO: –Timed visit would be eliminated –If trouble experienced on change-over then reversion is simple - avoids risk of long periods without emergency access First the OLO Equipment would be connected to the Test Access Cross-Connect Possible Methods (3) BT Switch Test Access Cross-Connect 1 2 MDF 2w Circuit Property of BT Property of OLO DSL AM OLO Equipment

BT would then remotely switch-over, on request from the OLO, when the OLO technician is at the customer premises The OLO then commission the new service, ensuring continuity of emergency access (by mobile if necessary) –Reversion can be invoked as a last resort Possible Methods (4) BT Switch Test Access Cross-Connect 1 2 MDF 2w Circuit Property of BT Property of OLO DSL AM OLO Equipment

BT then complete the implementation - at their leisure –Recover BT Owned CPE –Connect remote line test equipment to test access cross - connect in place of BT switching equipment Possible Methods (5) Line Test Equipment Test Access Cross-Connect 1 2 MDF 2w Circuit Property of OLO DSL AM OLO Equipment

Conclusions The live service change-over arrangements, combined with number portability, create a complex change-over arrangement Specific measures need to be adopted to reduce the dependence on (multiple) timed visits for change- over These measures could either be available on day one, or introduced in a roll-out plan as the systems and processes become available (which should align with the volumes rising).