ipno.in2p3.fr Orsay - October 2007IPNO-RDD-Jean Peyré1 Measurements of air temperature Christine Le Galliard Jean Peyré Oct 2007.

Slides:



Advertisements
Similar presentations
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
Advertisements

Field Challenges with DCV Systems Dr. Andrey Livchak, Derek Schrock and Jimmy Sandusky Halton Group Americas
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
Proposal of Fire Resistance Test
ipno.in2p3.fr Orsay - December 2007IPNO-RDD-Jean Peyré1 Work at IPN Orsay R&D on Calorimeters Jean Peyré Dec 2007.
ipno.in2p3.fr Orsay - September 2007IPNO-RDD-Jean Peyré1 Work at IPN Orsay R&D on Calorimeters Jean Peyré Sept 2007.
ipno.in2p3.fr Milano - October 2006IPNO-RDD-Jean Peyré1 Measurements of CsI(Tl) Crystals with PMT and APD Jean Peyré Milano - Oct 2006.
MuCool Absorber Review meeting FermiLab, Chicago 21 – 22 February 2003 Fluid Flow and Convective Heat Transfer Modelling by Wing Lau & Stephanie Yang Oxford.
ipno.in2p3.fr Orsay - October 2007IPNO-RDD-Jean Peyré1 Test Protocole for Crystals with Gamma Sources Jean Peyré Oct 2007.
ipno.in2p3.fr Lund - June 2007IPNO-RDD-Jean Peyré1 Measurements of some Crystals with PMT R&D on Calorimeters Jean Peyré Lund - June 2007.
Bell work The temperature of boiling water is 100° on the Celsius scale and 212° on the Fahrenheit scale. Look at each of the following temperatures and.
Air activation inside and around the SPS beam dump M. Baudin H. Vincke DGS-RP-AS.
Gas Temperature, Volume, and Pressure This tool can measure the temperature, volume, and pressure of a gas.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
Optimal Fan Speed Control for Thermal Management of Servers UMass-Amherst Green Computing Seminar September 21 st, 2009.
Daikin Visit November 7, 2014.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Engineering Department ENEN 16/08/2013 LR - BBC Pre-Study 1 STATUS of BBC DESIGN and ENGINEERING : PRELIMINARY RESULTS G. MAITREJEAN, L. GENTINI.
Heat load study of cryomodule in STF
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
QOD# 56 Tom and Jen are playing tennis for a couple hours on a hot sunny day. Tom is wearing a white shirt and Jen is wearing a black shirt. Which person.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
TPO Lap Splicing Lap Splicing Lap splicing on a TPO system is defined as joining two separate sheets, by way of heat welding, into one monolithic sheet.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
ipno.in2p3.fr Badesi - Sardinia - May 2006IPNO-RDD-Jean Peyré1 1.Status of ST1 2.Status of integration of ST1 and ST2 Jean Peyré Badesi - May.
FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI.
R&D Scintillators / IPN Orsay Joël Pouthas R&D Detector Department.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
Thermo-mechanical activities at Valencia V. Castillo, C. Lacasta, A. Oyanguren, P. Ruiz 8 th International Workshop on DEPFET Detectors and applications.
THERMAL EXPANSION Friday, February 24, 2012 Thermal Expansion Particles move more when they get hot. When the particles move more, they spread out. When.
By Laura Wickenhauser Grade 4. Volcanoes are mountains, but they are not formed the same way Mountains are formed from folds and uplifts on the Earth’s.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
Engineer Training Drying System, IR and Temp Control.
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
Scenario 1: walk slowly at a constant speed away from the motion sensor. Scenario 2: walk slowly at a constant speed toward the motion sensor. Scenario.
Tracker Goals o Main issue is to be able to run cold as more radiation is accumulated. o Due to “uncontrolled” humidity behavior, our present limit is.
SIZE - Top SERVER ROOM Designed by – openbox |
As discussed in the previous meeting, we upload 13 gaps in the database. 30 gaps with RE4/2 types with Batch 12 HPLs. Destroyed ~ 20 gaps to investigate.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Summer Student 2003Ferro Livia1. Summer Student 2003Ferro Livia2 Contents Experimental setup Thermal behaviour and cooling performance of the TOB structures.
Air Management Engineering for a Greenhouse Module for Space System Erik Mazzoleni Lorenzo Bucchieri Bioregenerative Live Support ISLSWG Workshop Turin,
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
GTK Controls and Safety Thermal results with the ceramic heater Kaitlin Howell, Georg Nüßle, Paolo Petagna,
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
AIR COOLING & PROFILOMETRY OXFORD SYSTEM IMPLEMENTATION P.A. COE – OXFORD THURS 08 SEPT 2016 AIR COOLING & PROFILOMETRY.
MaxxPower System Introduction.
Service channels between Tracker and PP1
F. Audinet, C. Martel : Cern GS-SE-HE
Q0 magnet, cooling, support ideas
Hot and Cold Can Experiment
Thermal Energy Thermal Energy - energy due to the random motion (kinetic energy) of molecules or atoms in a substance. Temperature – a measure of the average.
Heating of ALFA detectors
Laptop Overheating Issues And Solutions By I FIX PC
New approach for evaluating Equivalent fire severity of Design fires
Damage Levels V. Kain AB/Co
Bell work The temperature of boiling water is 100° on the Celsius scale and 212° on the Fahrenheit scale. Look at each of the following temperatures and.
Station and Module Support Frames
Thermal aspects Unité mixte de recherche CNRS-IN2P3
OT Survey & Adjustment Outline: Survey technique at present
Japan research of thermal propagation test
Single Detector Design
Exhaust gas intake to cabin air.
Presentation transcript:

ipno.in2p3.fr Orsay - October 2007IPNO-RDD-Jean Peyré1 Measurements of air temperature Christine Le Galliard Jean Peyré Oct 2007

ipno.in2p3.fr Orsay - October 2007IPNO-RDD-Jean Peyré2 Results of simulations: Max air temperature between CH1 & CH2 Model developped at IPN Orsay by F. Launay Max temp: 38°C with inflated air at 20°C For details see presentation of F. Launay ~38°C

ipno.in2p3.fr Orsay - October 2007IPNO-RDD-Jean Peyré3 XXXXXXXXXXXX XXXXXXXXXXXX X: local measurements Position of Sensors for ST1

ipno.in2p3.fr Orsay - October 2007IPNO-RDD-Jean Peyré4 Position of Sensors for ST2 XXXXXXXXXXXX XXXXXXXXXXXX X: local measurements

ipno.in2p3.fr Orsay - October 2007IPNO-RDD-Jean Peyré5 Test Scenario  : test from 11:00->15:00 ST1 & ST2 outside in position ST1 & ST2 inside open Cooling airflow 3000 m 3 /h (95%)  : test from 15:30->17:30 ST1 & ST2 outside in position ST1 & ST2 inside open Cooling airflow 2700 m 3 /h (85%)  : test from 17:35->19:45 ST1 & ST2 outside in position ST1 & ST2 inside in position Cooling airflow 2700 m 3 /h (85%) October 16 th  : test from 8:00->9:00 ST1 & ST2 outside in position ST1 & ST2 inside in position Cooling airflow 2700 m3/h (85%)  : test from 9:00->9:45 ST1 & ST2 outside in position ST1 & ST2 inside in position NO Cooling  : test from 9:45->11:30 ST1 & ST2 outside in position ST1 & ST2 inside in position Cooling airflow 1500 m3/h  : test from 11:30->12:00 ST1 & ST2 outside in position ST1 & ST2 inside in position Cooling airflow 2700 m 3 /h (85%) October 17 th Temperature of inflated air: 17°C

ipno.in2p3.fr Orsay - October 2007IPNO-RDD-Jean Peyré6 Measurements for ST1 Max air temperature at nominal airflow (2700 m 3 /h): <30°C Max air temperature at maintenance airflow (1500 m 3 /h): 36°C Max air temperature without cooling: ? Sensors 32, 39 & 47 give a good idea of the studied phenomena

ipno.in2p3.fr Orsay - October 2007IPNO-RDD-Jean Peyré7 Measurements for ST2 Max air temperature at nominal airflow (2700 m 3 /h): <26°C Max air temperature at maintenance airflow (1500 m 3 /h): 28°C Max air temperature without cooling: ? Sensors 25, 31 & 43 give a good idea of the studied phenomena

ipno.in2p3.fr Orsay - October 2007IPNO-RDD-Jean Peyré8 Conclusion 1.Max air temperature reached at nominal airflow (2700 m 3 /h) for ST1/ST2: <30°C. This is fully acceptable 2.Max air temperature reached at maintenance airflow (1500 m3/h) for ST1/ST2: <36°C. The quadrants can operate with this airflow for several hours without any thermal damage 3.Max air temperature reached without cooling for ST1/ST2: >45°C. We have stopped the test after 45 minutes. Previous tests in Orsay (year 2000) showed that temperature between CH1/CH2 could easily reach 70°C or more after few hours without cooling. COOLING IS ABSOLUTLY NECESSERY FOR PROPER WIRE CHAMBERS WORK. 4.Air temperatures measured around Crocus boxes are 18°C on bottom and 23°C on top of the FASS 5.Temperatures and air speed measured at local points are fully compatible with F. Launay simulation (under beam pipe >3m/s and over it >1m/s) 6.Simulation made in Orsay describes correctly ST1/ST2 thermal environment (difference found of only 5°C) [38°C-20°C for simulation and 30°C-17°C for measurements]