Welcome to the COST 723 Meeting! Bern, October 6-7, 2003.

Slides:



Advertisements
Similar presentations
Radiometric profiling of tropospheric temperature, humidity and cloud liquid presentation to the Specialist Meeting on Microwave Remote Sensing 5-9 Nov.
Advertisements

ECMWF MetTraining Course- Data Assimilation and use of satellite data (3 May 2005) The Global Observing System Overview of data sources Data coverage Data.
© Crown copyright Met Office E-AMDAR evaluation. Mark Smees & Tim Oakley, Met Office, May 2008.
Homogenization (instrumental correction) of water vapour data from Vaisala radiosondes and older (MARZ, RKZ) used in Polish aerological service Barbara.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Lecture 1 Geraint Vaughan. Radiosondes Vaisala RS80 Vaisala RS92 Launching a radiosonde European radiosonde stations (launch 00 and 12 UTC) Data available.
COST 723 UTLS Summerschool Cargese, Corsica, Oct. 3-15, 2005 Stefan A. Buehler Institute of Environmental Physics University of Bremen
/3024/ SUN MON TUE WED THU FRI SAT JANUARY 2011 February 2011 SMTWTFS
Problems and measuring errors of radiosonde humidity measurements in the global aerological network and new possibilities of their correction and validation.
Bomin Sun 1,2, A. Reale 2, and M. Divakarla 1,2 (1) I.M. Systems Group, Inc., Rockville, MD (2) NOAA NESDIS Center for Satellite Applications and Research.
COST 723 WorkshopSofia, May 17-19, 2006 Stefan Buehler Data Exploitation and Modeling for the Upper Troposphere and Lower Stratosphere
Rigel Kivi (1), Holger Vömel (2), Franz Immler (2), Terhi Lehtola (3), Niklaus Kämpfer (4), Corinne Straub (4), Vladimir Yushkov (5), Sergey Khaykin (5),
Introduction A new methodology is developed for integrating complementary ground-based data sources to provide consistent ozone vertical distribution time.
Herman G.J. Smit/FZJ-COST723-WG-I Overview Noordwijk March 2004 COST723-WG1- Working Group I: Data and Measurement Techniques Overview Herman G.J.
1 Detection and Determination of Channel Frequency Shift in AMSU-A Observations Cheng-Zhi Zou and Wenhui Wang IGARSS 2011, Vancouver, Canada, July 24-28,
Intercomparisons of AIRS and NAST retrievals with Dropsondes During P- TOST (Pacific Thorpex Observational System Test) NASA ER-2 NOAA G-IV Dropsonde.
Herman G.J. Smit, COST 723, Bern, 6-7 Oct, MOZAIC-Data, Particularly the Use of Water Vapor Data for UTLS-Studies and the Urgent Need for Integrated.
COST March 2004 ESTEC Working Group 3 Assessing the State of the UTLS and Understanding the Relevant Processes (ASU 2 RP) Tasks 1) Assess the.
USE OF AIRS/AMSU DATA FOR WEATHER AND CLIMATE RESEARCH Joel Susskind University of Maryland May 12, 2005.
WG1 Summary. Our Role / our Goal O3 rather well covered by existing databases (NDSC, GAW, WOUDC) Inconsistency of humidity data sets most prominent issue.
Intercomparisons of Water Vapor Measurements during IHOP_2002 – Radiosonde and Dropsonde Junhong (June) Wang NCAR Atmospheric Technology Division Acknowledgement:
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Deutscher Wetterdienst Lindenberg Meteorological Observatory Richard Assmann Observatory Michael Sommer GRUAN Lead Centre, DWD 2 nd GRUAN Implementation.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Radio Occultation. Temperature [C] at 100 mb (16km) Evolving COSMIC Constellation.
Page 1© Crown copyright 2004 Initial results from Tropospheric Airborne Meteorological Data Reporting (TAMDAR) evaluation Dr J. Nash and M. Smees.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Agenda MC Aug 13.
Tony Reale ATOVS Sounding Products (ITSVC-12)
Summary Sondes RS 80 has dry bias. RS 92 virtually without bias
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
Building-in a Validation cycle for GSICS Products
Imke Hans1, Martin Burgdorf1, Viju O
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
ANNUAL CALENDAR HOLIDAYS JANUARY FEBRUARY MARCH APRIL MAY JUNE
HOLIDAYS ANNUAL CALENDAR JANUARY FEBRUARY MARCH APRIL MAY JUNE
Item Taking into account radiosonde position in verification
Comparability and Reproducibility of RO Data
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
HOLIDAYS ANNUAL CALENDAR JANUARY FEBRUARY MARCH APRIL MAY JUNE
S M T W F S M T W F
NOAA/NESDIS/Center for Satellite Applications and Research
January MON TUE WED THU FRI SAT SUN
1 - January - Sun Mon The Wed Thu Fri Sat
2 0 X X s c h e d u l e 1 MON TUE WED THU JANUARY 20XX FRI SAT SUN MEMO.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Calendar
Calendar.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Progress with GRUAN observations in comparisons with
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Fabien Carminati, Stefano Migliorini, & Bruce Ingleby
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
2015 January February March April May June July August September
S M T W F S M T W F
S M T W F S M T W F
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
Presentation transcript:

Welcome to the COST 723 Meeting! Bern, October 6-7, 2003

COST 723 WG1 Meeting 1, Common Session WG1 + MC Bern, October 6-7, 2003 Stefan Buehler University of Bremen

Bern, COST 723 WG1 Meeting 1Stefan Buehler 3 Overall Activities Delay due to COST move to ESF Web site and mailing lists at COST 723 splinter meeting at EGS/Nice –Opening Workshop planned at ESTEC –Date (to be reconfirmed at this meeting): March 11-13, 2004 –Collection of COST 723 related EGS presentations on cost723.org

Bern, COST 723 WG1 Meeting 1Stefan Buehler 4 WG1 Activities –Radiosonde Humidity Ozone –Aircraft MOZAIC MARSCHALS –Satellite AMSU Odin Envisat Champ Established contacts to data sources: We will learn about ongoing activities in these areas in the next two days (hopefully).

AMSU-B Humidity Data Stefan Buehler University of Bremen

Bern, COST 723 WG1 Meeting 1Stefan Buehler 6 Platform InstrumentLaunch DMSP F-13SSM-T2 March 95 DMSP F-14 SSM-T2 April 97 NOAA-15 (NOAA-K) AMSU-B May 1998 NOAA-16 (NOAA-L) AMSU-B September 2000 NOAA-17 (NOAA-M) AMSU-B June 2002 Aqua HSB May 2002 Operational Microwave Humidity Data

Bern, COST 723 WG1 Meeting 1Stefan Buehler 7 Figure by M. Kuvatov

Bern, COST 723 WG1 Meeting 1Stefan Buehler 8 AMSUBChannelsAMSUBChannels Figure by V. Oommen-John

Bern, COST 723 WG1 Meeting 1Stefan Buehler 9 Wettest day in 2002 (July 17) Driest day in 2002 (January 5) Peak altitude of Jacobians gives sounding altitude Figure by V. Oommen-John

Bern, COST 723 WG1 Meeting 1Stefan Buehler 10 Wettest day in 2002 (July 17) Driest day in 2002 (January 5) Lindenberg Radiosonde Data Solid: RH, dashed T, dotted RH_icesat Figure by M. Kuvatov

Bern, COST 723 WG1 Meeting 1Stefan Buehler 11 Match-up Procedure Problems: –Sonde drifts during ascent –Time difference between sonde launch and overpass  Pixel level comparison not possible Figure by V. Oommen-John

Bern, COST 723 WG1 Meeting 1Stefan Buehler 12 Solution: Look at a target area, we take a 50km circle. Striking: Atmospheric inhomogeneity can be a problem. Figure by M. Kuvatov

Bern, COST 723 WG1 Meeting 1Stefan Buehler 13 Number of Occurrences Standard deviation of brightness temperatures inside the target area. Vertical lines are from operational calibration. Figure by V. Oommen-John

Bern, COST 723 WG1 Meeting 1Stefan Buehler 14 Error Model The 50km inhomogeneity is the dominant error source. Error model:  i = C 0 +  50km C 0 is small, we take 0.5K.

Bern, COST 723 WG1 Meeting 1Stefan Buehler 15 Comparison Lindenberg radiosonde humidity vs. AMSU- B on NOAA15, time period Discrepancies in the UT for very dry conditions. Figure by M. Kuvatov

Bern, COST 723 WG1 Meeting 1Stefan Buehler 16 Radiosonde Stations in COST 723 Countries (from Met Office Archive) Figure by V. Oommen-John

Bern, COST 723 WG1 Meeting 1Stefan Buehler 17 Satellite Data as a Tool to Compare Different Stations Lindenberg / Germany (Vaisala RS80) Kem / Russia (Goldbeater skin) Figure by V. Oommen-John

Bern, COST 723 WG1 Meeting 1Stefan Buehler 18 Conclusions It is worthwhile to compare operational satellite humidity data and radiosondes. Comparison in radiance space avoids inverse problem. A good match-up methodology is crucial. Tests consistency of: RT Model Satellite Data Radiosonde Data

Bern, COST 723 WG1 Meeting 1Stefan Buehler 19 Draft Workshop Program, Day 1 Thu. March 11, :00Welcome, agenda, etc. 14:30Session 1: UTLS Data sources 14:30Presentation 15:00Presentation 15:30Coffee break 16:00Presentation 16:30Presentation 17:00Presentation 17:30Close 19:00Joint dinner

Bern, COST 723 WG1 Meeting 1Stefan Buehler 20 Draft Workshop Program, Day 2 Fri. March 12, :00Session 2: Data assimilation 09:00Presentation 09:30Presentation 10:00Coffee break 10:30Presentation 11:00Presentation 11:30Presentation 12:00Lunch 14:00Session 3: Data interpretation and scientific studies 14:00Presentation 14:30Presentation 15:00Presentation 15:30Coffee break 16:00Presentation 16:30Presentation 17:00Close

Bern, COST 723 WG1 Meeting 1Stefan Buehler 21 Draft Workshop Program, Day 3 Sat. March 13, :00WG work in 3 parallel sessions WG 1 WG 2 WG 3 12:00Lunch 13:30Joint session, WG reports and discussion WG 1 WG 2 WG 3 16:00Close Do we also have to put in a short MC Meeting? When?