30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.

Slides:



Advertisements
Similar presentations
16JAN08CaloECSMeeting - Xvc1 Calo ECS meeting DCS and PS/SPD temperature monitoring Xavier Vilasis-Cardona.
Advertisements

S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)Overview of the system. 2)Discriminating errors. 3)Tricks. RUNNING PRS AND SPD – FIRST DRAFT TUTORIAL.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
TOF calibration Y. Karadzhov. Y. Karadzhov, MICE CM26 24 March Slide 2 TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
E.Guschin (INR,Moscow) 14 February 2007Calorimeter commissioning meeting, CERN Digital camera with LED monitoring Status: Photographs of SPD are completed.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
SPD status and last operations A. Carboni, A. Comerma, D. Esperante, E. Picatoste et al. 08SEP2009Calo meeting1.
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
CALO News Pascal Perret LPC Clermont 22 January 2012.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
09/02/20121 SPD Status Joan Mauricio La Salle (URL) / Universitat de Barcelona (UB) 14/04/2015.
1 Francesc Domingo SPD – Status 31/08/ Francesc Domingo31/08/2011 Outline · 100% of SPD channels are working properly.
Results with the RPC system of OPERA and perspectives
INSIDE in-beam PET system assembly and test at INFN Torino
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Monitoring system commissioning
Studies on detector and commissioning CALICE Technical meeting
Presentation transcript:

30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting – CERN 30th March 2009

30/March/2009SPD commissioning activities2 SPD tests Due to the TrigPGA problems on FE: –Whenever the SPD alone is reseted we lose 6 VFE –This problem affected the SPD scans (offset and mapping) due to the reset at each step command => remove reset (reset is not required) –Conclusion: At DAQ level, any SPD VFE reset => PS FE reset Other problems: –Some events are lost when using STEP command: under investigation –C-side CBs did not configure: solved 2 times. –BCID is not coherent at CB level With SPD VFE reset at each step Without reset 6 VFE

30/March/2009SPD commissioning activities3 Control/clock cables problem Ctrl/clk cables connector different from standard RJ45: PINSSignalColor 1SDA+white/green 2SDA-green 3SCL+white/orange 4SCL-orange 5MIERDA+white/blue 6MIERDA-blue 7CLK+white/brown 8CLK-brown Each pair is twisted different and has different lengths ⇒ each pair has different velocity of propagation As measured on correct cables: PairColorv (m/ns)v/c SDAGreen SCLOrange MIERDABlue CLKbrown C-side between PRS0 and SM1 bottom box bundle (serial number 13): -2 cables were measured with shortcut on 2008, but now OK -On 2009, 1 cable presents shortcuts on 3 of 4 pairs (SCL, MIERDA, and CLK) -Bundle original tray position O1-31

30/March/2009SPD commissioning activities4 Control/clock cables problem: measurements PairColorv (m/ns)d (ns)d prop (ns)l (m) SDAGreen ,10 SCLOrange ,08 MIERDABlue ,02 CLKbrown ,27 Correct cable (29m): PairColorv (m/ns)d (ns)d prop (ns)l (m) SDAGreen SCLOrange MIERDABlue CLKbrown PairColorv (m/ns)d (ns)d prop (ns)l (m) SDAGreen SCLOrange MIERDABlue CLKbrown Cable 133 (with shortcut) from crates: Cable 133 (with shortcut) from detector: d lemo d’=16ns d d

30/March/2009SPD commissioning activities5 Control/clock cables problem: conclusions Bundle on C-side, between PRS0 and SM1 bottom box, serial number 13. Which is the problem? Are the cables broken? –Intermitent effect. –1 cable still used: replace it by spare? Placement of the problem (inside the chain?): –Measured from crates / m –Measured from detector / m Is it possible to inspect the bundle at this position? Main concern: is this just one isolated case or may be other cables affected in the same way?

30/March/2009SPD commissioning activities6 SPD cosmics See Ricci’s talk.

30/March/2009SPD commissioning activities7 SPD plans Investigate the problems: –Wrong number of triggers for step command –BCID is not coherent at CB level (to check with Patrick) Continue offset measurements. Participate on cosmics runs.