ProjectX Sessions on Controls & Instrumentation Conveners M. Wendt, C. Briegel, W. Blokland.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
LLRF Requirement and Parameters at ESS Rihua Zeng, Anders J Johansson LLRF workshop, Hamburg,
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Operations, Test facilities, CF&S Tom Himel SLAC.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Fast Fault Finder A Machine Protection Component.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
ESS Timing System Prototype 2012 Miha Reščič, ICS
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
SNS Beam Diagnostics A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Working Group 5 ProjectX Collaboration Meeting April 12-14, 2011 Summary Talk M. Wendt and W. Blokland Controls, Instrumentation & Protection.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
Summary: Working Group on Instrumentation Wim Blokland ORNL / SNS Manfred Wendt Fermilab 11/22/2008Summary: Project X Instrumentation WG 1.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
Tao Tang, Craig Burkhart
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
ORNL is managed by UT-Battelle for the US Department of Energy Low Level RF Status and Development Activities at the Spallation Neutron Source Mark Crofford.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
Summary Instrumentation & Controls WG Wim Blokland Jim Patrick Manfred Wendt Project X Collaboration Meeting September 12, 2009.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN SwissFEL Timing System status & plans Babak Kalantari :: Large Research Facilities /Controls :: Paul Scherrer Institut.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
LCLS Commissioning & Operations High Level Software
MicroTCA Development and Status
LLRF Research and Development at STF-KEK
Overview and System Design for ESS LLRF Systems
ILC LLRF Status Ruben Carcagno, Brian Chase
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
LCLS Commissioning & Operations High Level Software
Fill-pattern Control System for KEKB
ERL BPM System Mike Billing, Mark Palmer
LLRF Control System Outline Scope Requirements Design Considerations
Advanced Research Electron Accelerator Laboratory
High Level Physics Applications for LCLS Commissioning
Breakout Session SC3 – Undulator
Presentation transcript:

ProjectX Sessions on Controls & Instrumentation Conveners M. Wendt, C. Briegel, W. Blokland

Contents Overview presentations – Controls: Hardware and Software – Instrumentation: Collaborations and R&D Summary -Focus on collaboration and R&D

Controls Hardware HRM: Hotlink rack monitor (Paul Kasley) A general I/O box which can provide collaborators an easy connection for monitoring analog and digital data. Xclock: Synchronization (Charlie Briegel) TClock is being redesigned as XClock. These clocks provide the complex with global synchronization of all machines and related data acquisition. TClock/XClock is not a machine clock. A machine clock for project X needs to be addressed.

Controls Hardware Bus Survey aka Hardware Platform (Charlie Briegel) Many options are being investigated. The VME hybrid (VXS, openVPX) provides a growth path for future platforms. While Project X implementations are not dependent on a particular architecture, efficiency can be achieved by minimizing the choices across the complex. The choice of future bus architectures will evolve as the industry matures.

Controls Software GUIs aka Console Environment (Carl Shumann) – JAVA applications (SYNOPTIC viewer), EDM screens, MATLAB, and the existing CLIB (including ACL) provide the tools for operators/physicists. – A modeling/simulation framework is missing. The existing redirection of data for a framework could allow virtual machines as well as real machines to be manipulated, but the physics view of the machine is not directly tied to the control system. This effort could be addressed with a collaborative effort but must involve the machine physicists. Alarms (Brian Hendricks) – Alarms hierarchical view or “processed” alarms could be a collaborative effort. A rule-based system as a client of the current set of alarms could serve an intelligent set of resulting alarms.

Controls Software EPICS to ACNET (Dennis Nicklaus) – This wrapper around an EPICS IOC has been implemented to provide allow collaborators to provide a EPICS system that can be integrated in the ACNET control system ACNET-in-a-Box (Rich Neswold) – Provides a minimal system for collaborators to evolve their system for Fermilab.

ACNET-in-a-Box

Collaboration: Laser Diagnostics MLL lock box mod control, analysis 1MHz lockin amp transimpedance preamp Faraday cup H- e- integrating sphere power monitor galvo fiber coax amplitude modulator laser timing control Use of optical fiber Narrow band locking amp detects 1MHz modulated signal Laser rep-rate is locked to 325MHz from machine Galvo scan is triggered by macropulse event signal Upper components are in tunnel, lower are in a laser hutch (Russell B. Wilcox)

Collaboration: Fast Faraday Cup Irregular spacing avoids resonance 316 Stainless Presentation_name Input pulse phase dispersion Transmission from connector to connector Transmitted pulse only a 4psec increase in risetime ( Craig Deibele)

Collaboration: Electron Scanner Electron scanner: derive the beam profile by looking at the deflected projection of a tilted sheet of electrons due to the proton beam S X Y protons electrons To get started without a fast deflection system use multiple measurements of a stepping pencil beam. S X Y protons electrons Assume scan duration << proton bunch (W. Blokland) Simulations show that scan must be shorter than bunch length to use same method as SNS.

FRIB Diagnostics (Saeed Assadi) S. Assadi, 8 September, Slide 11

ESS Opportunities 12 M. Eshraqi and A. Ponton, ESS ParameterESSESS’03 Average beam power5 MW Pulse length1.5-2 ms<2 ms Rep rate20 Hz16.7 Hz Energy GeV1 GeV Average beam current2-2.3 mA Peak beam current50-75 mA150 mA Linac length~420 m RF Frequency352/704 MHz (Andreas Jansson)

V DS =1kV, R Load =27 ohm, I D =33 A Fastest switching speed: 1.2 ns Chopper Driver R&D Switching waveform (V load and V gate ) 13 Broadband MOSFET driver R&D at SLAC (ILC kicker driver development, but may work for a PX chopper after some modifications. SLAC is interested in an official PX collaboration on this subject. (Tao Tang)

Initial setup of a temporary diagnostics beam-line to characterize the beam parameters after the RFQ at HINS. Many upgrades underway, e.g. spectrometer for dp/p, Feschenko, vibrating wire, fast Faraday cup, laser emittance, etc. PX Instrumentation R&D at HINS (Vic Scarpine)

Summary (Controls) General Purpose DAQ: HRM – A custom but tightly coupled (TCLOCK) general purpose data-acquisition system is available Synchronization and Time-stamping: XCLOCK & BSYNC – The beam synchronization specifications for the IC-2, aka the BSYNC clock, need to be determined. This will require experts from instrumentation, controls, machine groups and LLRF. Hardware Platform: – Different platforms are being investigated, VME hybrid is main local choice but collaborators will be supported. The final choice(s) will (and can) be made later. Console Graphical Interface – Current tools EDM, CLIB, Java (including drop and drag interface), ACL. Discussion on what console tools will be needed by different groups such as operators, diagnostics, physics. – Consider supporting the use of an accelerator simulation model tied to the console environment to help with zero th order tune-up of accelerator (center of mass) and debugging of applications. This can be a collaboration opportunity. Alarms: dedicated program with Central Alarm Server – Identified possible collaboration opportunity for intelligent manager of alarms EPICS-ACNET: The assumption is that the underlying control system is ACNET – This layer will allow collaborators to provide EPICS-based instrumentation ACNET-in-a-box – Allows collaborators to test an ACNET front-end at their location. This tool in combination with the assistance (visits) of Fermilab people will help integration of collaborators’ systems

Summary (Instrumentation) ProjectX Collaboration On-going Activities – LBNL: Laser diagnostics Conceptual design of a mode locked laser with optical fiber distribution, improve signal to noise with a modulated synchronous detection system – SNS: Electron Scanner Proposal to get started with available electron gun without having to build fast scanner – SNS: Fast Faraday Cup Delivered low power prototype (20Ghz) and started design of high power version Instrumentation Collaboration opportunities – FRIB: Job opportunities. Possible collaboration on similar diagnostics. Already started design on MPS – ESS: Job opportunities. Possible collaboration on similar diagnostics PX Test facility (formerly known as HINS) – Front-end serves as instrumentation and chopper test facility. Important for R&D Chopper Driver – Collaboration opportunity with SLAC Thanks to all participants

Backup Slides

Controls Sessions Hardware – General Purpose DAQ – Synchronization and Time-stamping – Hardware Platform Software – Console Graphical Interface – Alarms – EPICS-ACNET Interface – ACNET-in-a-box

Instrumentation Sessions ProjectX Collaboration Activities – LBNL: Laser diagnostics – SNS: Electron Scanner & Fast Faraday Cup Instrumentation Collaboration opportunities – FRIB: Overview and Job opportunities – ESS: Overview and Job opportunities Test facility formerly knows as HINS – Front-end serves as instrumentation and chopper test facility Chopper Driver – Helical electrode R&D for the broadband chopper at Fermilab – Broadband MOSFET driver R&D at SLAC ProjectX Test Facility (HINS) beam diagnostics