Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
More Than Smart Overview Tony Brunello, Greentech Leadership Group Paul De Martini, Caltech Resnick Sustainability Institute Sept. 17, 2014.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
MTS Working Group Webinar Mtg
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
1 Connecting the Dots Edward Randolph Director, Energy Division California Public Utilities Commission Date (example: April 26, 2012)
Avoided Costs of Generation
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Presentation Identifier (Title or Location), Month 00, 2008 Cost and Benefit Analysis Framework: Update EPRI Smart Grid Advisory Meeting October 14, 2009.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
SOUTHERN CALIFORNIA EDISON SM REC cost estimation April 23, 2010 Eric Lavik.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
By Erik Takayesu, PE Director, Electric System Planning Southern California Edison More Than Smart Webinar August 4, 2015 Distribution Resources Plan.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
MTS Working Group September 8, Introduction More Than Smart Mission – Enabling state integrated distribution grid efforts 1.Continue the work.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
MTS Working Group October 8, Introduction More Than Smart Mission – Enabling state integrated distribution grid efforts 1.Continue the work of.
Integration Capacity Analysis & Locational Net Benefits Analysis Working Groups Kick-off Meeting May 12, 2016.
SFPUC IRP Presentation to CEC April 18, INTEGRATED RESOURCE PLANNING SAN FRANCISCO PUC JAMES HENDRY SAN FRANCISCO PUC.
UM 1751 Energy Storage Workshop #3 May 9, UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
1 Distribution Resources Plan [R ] Locational Net Benefit Analysis (LNBA) and Demonstration Project A (Demo B) Workshop California Public Utilities.
Locational Net Benefit Analysis Working Group June 9, pm – 3:30 pm CPUC Golden Gate Room, San Francisco drpwg.org.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
MTS Working Group DER Value Components (draft rev 2) Jan. 20, 2015.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
© 2016 Electric Power Research Institute, Inc. All rights reserved. Salvador A. Casente, Jr. Vice President, General Counsel, Chief Compliance Officer.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
Locational Net Benefit Analysis Working Group
Locational Net Benefit Analysis Working Group
LNBA Subgroup: Avoided Transmission Value
MTS Working Group January 28, 2016
Integrated Capacity Analysis Working Group
Transmission-Distribution Interface Working Group Meeting
Pacific Coast Inter-Staff Collaboration Summit
Locational Net Benefit Analysis Working Group
Locational Net Benefit Analysis Working Group
August ICA Agenda Time Topic 8:00 – 8:15
Alternative Transactive Electricity Market Models
Mike Jaske California Energy Commission
Locational Net Benefit Analysis Working Group
Subteam 1a Competitive Solicitations Framework Working Group Meeting
August LNBA Agenda Time Topic 1:00 – 1:15
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
The Transition to a High DER Future
Distribution Systems and Planning Training
How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
Resource Adequacy Demand Forecast Coincidence Adjustments
Integrated Distribution Planning Process
Introduction to Growth Scenario Working Group
DECISION
ICA Methodology Clarifications ICA Working Group 5/18/2016
California Transportation Electrification Activities
Presentation transcript:

MTS Working Group San Francisco F2F Agenda Mar. 23, 2015

2 2 Agenda Morning (9a-12n) Opening & Introductions - Paul De Martini DRP Methodology - Mark Esquerra DPP Alignment - Lorenzo Kristov 12n - 1p Lunch Afternoon (1-3:30p) 2015 Plan - Paul De Martini CA Proceedings (Technical Alignment) - All Next Steps Morning & afternoon breaks as needed

Optimal Location Values & Methodology

4 4 Subgroup Objective Develop a unified locational net benefits methodology for the values identified in CPUC final guidance consistent across all three Utilities. Discuss interpretations of final guidance Discuss quantification method for each DER benefit category Gain alignment on overall locational benefits methodology Subgroup included representatives from the three CA IOUs (PG&E, SCE, SDG&E), SolarCity and Kevala Analytics.

Not Required for “Walk” Phase

7 7 MTS Identified Value Components

8 8 MTS Recommendations for Initial DRP

9 9 Final Guidance from Commission on Optimal Location Benefit Analysis IOU Unified Locational Net Benefits methodology ‒Based on E3 Cost-Effectiveness Calculator, but enhanced to include following location-specific values (minimum):

10 Comparison of Final Guidance and MTS Recommendations

11 E3 Cost Effectiveness Methodology Utilize Distributed Energy Resources Avoided Cost Model (DERAC) Current DERAC model has system values that may need to be modified/replaced with locational specific values. Avoided Cost Components in DERAC

12 Proposed Locational Benefits Methodology

13 Discussion of Valuation Method from 3/12 Mtg E3 DERACT MTS Recommendations No Change

14 Avoided Sub-transmission, Substation and Feeder Capital & Operating Expenses Definition Avoidable costs incurred to increase capacity on sub- transmission, substation and/or distribution feeders to ensure system can accommodate forecast load growth Cost Calculation Approach Use existing utility capacity 10-year plans by substation and/or Perform load forecasting vs. capacity analysis to forecast needed capacity upgrades Benefit/Avoided Cost is value of deferring capacity work Examples Substation upgrades Transformer upgrades Distribution feeder reconductoring/reconfiguration

15 Avoided Distribution Voltage and Power Quality Capital and Operating Expenses Definition Avoidable costs incurred to ensure power delivered is within required operating specifications (i.e. voltage, flicker, etc.) Cost Calculation Approach Use existing utility power quality investment plan by substation, or Perform load forecasting vs. voltage/power quality analysis to forecast needed voltage/power quality upgrades Benefit/Avoided Cost is value of deferring voltage/power quality work Examples Voltage regulation investments

16 Avoided Distribution Reliability and Resiliency Capital and Operating Expenses Definition Avoidable costs incurred to proactively prevent/mitigate routine outages (reliability) and major outages (resiliency) Avoidable costs incurred in responding to routine outages (reliability) and major outages (resiliency) Distribution Resiliency costs defined as spending needed to meet reliability expectations that are above/beyond distribution planning criteria to address major outage events. Cost Calculation Approach Use existing utility reliability investment plan by substation, or Allocate systemwide reliability investment plan according to reliability statistics (i.e. SAIDI, CAIDI, SAIFI) by substation/local area Benefit/Avoided Cost is value of deferring reliability/resiliency work Examples Investments / expenses New/Upgraded Distribution feeders Microgrids

17 Avoided Transmission Capital and Operating Expenses Definition Avoidable costs incurred to increase capacity on transmission line and/or substations to ensure system can accommodate forecast load growth Cost Calculation Approach Use existing CAISO TPP plan by substation and/or Perform load forecasting vs. capacity analysis to forecast needed capacity upgrades Benefit/Avoided Cost is value of deferring transmission capacity work Examples Substation upgrades Transformer upgrades Transmission line reconductoring/reconfiguration Voltage regulation investments

18 Avoided Flexible Resource Adequacy Procurement Flexible RA determined at system level. Instead of Flexible RA, recommend using Local RA. Alternate Definition (Avoided Local RA Procurement) Avoidable incremental costs incurred to procure Resource Adequacy (RA) in CAISO-identified local areas (e.g. LCR) Cost Calculation Approach Use latest CAISO local capacity requirements to identify incremental capacity needs beyond current generation and identify deficient sub-areas. Benefit/Avoided Cost is value of deferred Local Capacity or transmission Examples Local RA Procurement PG&E: Needs to purchase Bay Area Local RA at a premium in area to fulfill Local RA requirements

19 Avoided Renewable Integration Costs Renewable Integration determined at system level. Not location specific Definition Avoidable incremental costs to integrate renewables onto electric system. Cost Calculation Approach Current cost calculation is an interim method for calculating renewable integration costs at a system level, which is to be replaced in Utilities to coordinate efforts with development of the updated RPS Calculator and Renewables Integration Charge to factor in locational specific values

20 Societal Avoided Costs Definition Avoidable incremental costs that are borne by the public, as well as environmental benefits (improvements in air and water quality and land impacts) that can be clearly linked to deployment of DERs. Cost Calculation Approach Until more data is available in this area, qualitatively describe the Societal Avoided Costs – Potentially use CalEnviro Screening tool In some cases, DERs impose costs on society, such as increased taxes for those not participating with DERs Examples Criteria Pollutant Emissions/Local Air Assessments/ Health Impacts

21 Avoided Public Safety Costs Definition Avoidable incremental public safety related costs that can be clearly linked to deployment of DERs. Cost Calculation Approach Until more data is available in this area, qualitatively describe the Public Safety Benefits In some cases DER could potentially increase costs and hazards for safety related items

22 Recommendations Utilize E3’s DERACT as starting point Review and compare T&D deferral benefit calculations among the IOUs Develop criteria/service terms for DERs regarding deferring T&D Projects Flexible RA will be incorporated in methodology as a system value Generation related integration costs incorporated using interim integration adder adopted by CPUC – System value Locational RA will be included to the extent a DER solution can address this requirement Societal & Public Safety will be included as qualitative factors unless quantitative data is available. For all categories, DERs will sometimes increase cost. Net Benefit will account for any increased costs.

Distribution Planning Process Alignment w/State Planning & Regulatory Processes

24 Potential DPP Alignment Map w/CA Planning Refer to Lorenzo’s Handout

25 Potential DPP Alignment w/GRCs Refer to Lorenzo’s Handout

2015 MTS WG Scope

Activity Support utility development of July filings related to DRP, data, demonstrations and state planning alignment as requested Define services (incl. functional requirements) for deferred capital, voltage/reactive power management and reliability/resilience. Plus identify procurement methods (e.g., RFPs, tariffs, other) related to these services Define incremental operational functions to integrate and optimize DER related to the values identified in the CPUC final guidance. This includes identifying technology and new processes leveraging industry practices and CA developments (incl. measurement, information protocols, etc.) Facilitate dialog with California EE/DR community to discuss methods and practice to align utility program design with operational needs