America’s Force of Decisive Action PM TRADE LT2 Standards Team Simulation, Training and Instrumentation 31 March- 2 April 2015 PM TRADE Industry Standards.

Slides:



Advertisements
Similar presentations
Control Framework Breakfast Group agenda 9:00Arrival, Breakfast & networking 9:20 Welcome & Phase I Update 9:30Direct reporting project update – Sharmi.
Advertisements

Common Timetabling Platform Project Update January 2009.
Problem Solving Lab – Part B
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Team : READ THIS SLIDE CAREFULY Project Plan presentations will be given by each team at our all-hands meeting on the dates listed at All- Hands Meeting.
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
JAVAPOSTM Java for POS Devices
AGILECO - Project Looking Glass Team 3 – Final Presentation Presenters: - Chris Dornin - Meghan Porter-Mahoney - Laura Zachary - Aaron Marsh.
ISPW Natural Demo Mar 2011 Created by the kindness of CN Rail using the their Test ISPW system Through the efforts of Paul Vaenas CN - IT - Release Management.
Budget Update Presented to Financial Area Representatives by Mary Simon, Sr. Director Budget and Planning January 18,2012 Presented to Financial Area Representatives.
FINAL DEMO Apollo Crew, group 3 T SW Development Project.
ISO Tor Stålhane IDI / NTNU. What is ISO ISO 9001 was developed for the production industry but has a rather general structure ISO describes.
Managing Software Development With Microsoft ® Project 2000 And Team Folders Sam Brooks
Tablet PC Capstone CSE 481b Richard Anderson Craig Prince.
Doc.: IEEE /212r0 Submission May 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
Welcome to the Minnesota SharePoint User Group January 9 th, 2008 Vendor Demonstrations CommVault, Barracuda.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting March 12, 2012.
Nick Bloom, Applied Econometrics, Winter 2010 APPLIED ECONOMETRICS ECON 103 Overview.
1. S318417: OAUG SysAdmin SIG Angelo Rosado, Oracle Senior Product Manager Kenneth Baxter, Oracle Strategy Product Manager Biju Mohan, Oracle Principal.
EDOS Workgroup Update May 21, 2013 Laboratory Orders Interface Initiative.
Tablet PC Capstone CSE 481b Richard Anderson Valentin Razmov.
Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis.
1 TOWER CONSTRUCTION NOTIFICATION SYSTEM ENHANCEMENTS March 30, :00 PM Room 6-B516 of the Portals II Building 445 Twelfth Street, SW Washington,
Copyright © 1997 Pangea Systems, Inc. All rights reserved. Pathway Tools Training Course.
Doc.: IEEE /288r0 Submission July 2001May 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.
TUESDAY, 3:30 – 3:50PM David Riley, CONNECT Lead (Contractor) Federal Health Architecture Office of the National Coordinator for Health IT CONNECT 3.0.
Electronic Submission of Medical Documentation (esMD) Author of Record Workgroup April 3, 2013.
QUARTERLY TRAVEL COORDINATOR MEETING Department of General Services Statewide Travel Program Tuesday, March 3, 2015.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Doc.: IEEE /155r1 Submission March 2002 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
TDL Forum WEDNESDAY, MAY 21, Agenda ◦Forum Focus: Vireo Users Group Meeting recap (David Reynolds) ◦TDL-led Vireo development (Ryan) ◦Operational.
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG 6tisch Closing Report for.
Trade Software Developer Technical Seminar ACE Business Rules and Processes Laurie Dempsey March 8, 2012.
WFM: A Power Tool for Retaining Top Talent Presented by: Dick Bensinger Senior Education Specialist, Application Delivery NICE Systems To contact Dick.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting November 21, 2011.
Component D: Activity D.3: Surveys Department EU Twinning Project.
PM TRADE Acquisition Transformation: Process / Product / Organization Interfaces Standards IPT Agenda – April GDC4S will be our IPT host for all.
UL/URC Meeting Friday, May 20, Agenda Project Updates Security Updates Demo of eRecruit Changes Training Updates Implementation Information May/June.
America’s Force of Decisive Action FASIT Working Group 1-2 Dec 2015.
Tailoring the EPLC A Clinical Center Approach Ryan Kennedy, IT Project Manager Department of Clinical Research Informatics March 28, 2012.
ECO 212 Week 5 Learning Team International Trade Simulation and Report Check this A+ tutorial guideline at 212/ECO-212-Week-5-Learning-Team-
DRAFT IAEG WG1 Meeting Agenda Pau, France
PARTNER SUMMIT 2014 CrownPeak Customer Success and Product Teams
Context: Course Overview – Week 2
Supporting quality devices
Business Plan and Presentation
People First Portal Upgrade
Michigan Department of Education ACT WorkKeys® Q&A Session
CSS 422 Competitive Success/snaptutorial.com
CSS 422 Education Begins / Snaptutorial.com. CSS 422 All Assignments For more classes visit CSS 422 Week 1 Individual Use Case Diagram.
CSS 422 Education Begins / tutorialrank.com. CSS 422 All Assignments For more course tutorials visit CSS 422 Week 1 Individual Use.
CSS 422 Education for Service-- tutorialrank.com
Florida Industrial Security Working Group
Monthly PALT Session Ground Rules
The 9 steps to successful project implementation
Welcome to Cyber Recruiter – Maximizing Requisitions
Welcome to Cyber Recruiter – Hiring Applicants
Next Steps / Ongoing Collaboration
GDPR Dashboard General Data Protection Regulation 06/02/2018
Welcome to Cyber Recruiter – Administration Training
Welcome to Cyber Recruiter – Creating & Posting Requisitions
Welcome to Cyber Recruiter – Utilizing Standard Reports
Welcome to Cyber Recruiter – Administration Training
Arc SC Chairs’ Report Jacksonville, FL, US May ‘08
Welcome to Cyber Recruiter – Evaluating Applicants
Presentation transcript:

America’s Force of Decisive Action PM TRADE LT2 Standards Team Simulation, Training and Instrumentation 31 March- 2 April 2015 PM TRADE Industry Standards Working Group 31 March – 2 April 2015

2 America’s Force of Decisive Action Interfaces Standards IPT MAR 2015 Agenda CPM Next Contractor, GDC4S will be our IPT host for all 3 days Tuesday – 31 March, GDC4S,12001 Research Parkway, Ste. 500 (5th floor) Orlando, FL Journey & Products - LT2 Team IPT Leads WG Accomplishments: Component Architecture, LPAN, LTEC, Common Message WG Products: Overview of LT2 TESS Products, Documents, LTEC SW, & LPAN WG Re-Start discussion & vision 1300 – 1630 LT2 TESS Demo - LT2 Team LTEC version status update (version 1.2 to 1.2.1) LTEC/LPAN Demo with Q&A LT2 TESS Kit Check-out Procedures Wednesday - 1 & 2 April LT2 LTEC Software Developers Course (RSVP required) LT2 TESS Kit Check-out lottery (take kit that day – 5 available) Discussion slides and dial in information will be posted to the individual LT2 Portal Working Group folders the week prior. Future IPT WG meetings will resume after VTESS contract award 2

3 America’s Force of Decisive Action LT2 LTEC Developers Course April – LTEC/LPAN Lessons Learned and Known Issues LT2 LTEC developers course is to support Industry TESS hardware/software developers by providing: −Overview on LTEC framework architecture and subcomponents (CAL, OSAL, Message Broker) −Information to assist users in port LTEC to different platforms −Information on new services and framework updates since the 1.1 release −Hands on C/C++ programming labs −Class Size: Limited to 20 individuals - 2 per company maximum (additional seat requests will be allowed on a space available basis by random selection. (mandatory RSVP by March 20 th noon EST) April – 1600 −Continue course, questions, and LT2 TESS Kit check out