Project Information. Contact Information Project Being Developed.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

Childrens Low-cost Laptop Program RFP Re-Released Webinar March 25, 2011.
Chapter 3: Planning a Network Upgrade
The Office of Information Technology Network Access Control (NAC) Anthony Espinoza Information Security Officer UTSA Office of Information Security.
USG INFORMATION SECURITY PROGRAM AUDIT: ACHIEVING SUCCESSFUL AUDIT OUTCOMES Cara King Senior IT Auditor, OIAC.
CIP Cyber Security – Security Management Controls
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Technology Plan EDLD 5362 Casey Smith.
Implementation Network Wide
Cisco – Semester III Documentation. What is it most important component of a good network?  Documentation.
A Guide to major network components
Computer Networks IGCSE ICT Section 4.
Network security policy: best practices
Developing a Security Policy Chapter 2. Learning Objectives Understand why a security policy is an important part of a firewall implementation Determine.
Final Design and Implementation
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
© 2006 Jupitermedia Corporation Webcast TitleSuccessful Rollout Planning 1 January 19, :00pm EST, 11:00am PST George Spafford, President Spafford.
Communication is Between People. The Rest is Technology. How to Prepare for and Survive an IT Audit.
School Technology Solutions, LLC Technology Audits What's in it for you? 4 th Annual SW/WC Technology Conference March 11, 2010 Presenter: Lee Whitcraft.
Grant Funding. Office of Drug Control Policy (ODCP) –Jim Rapp (517) Michigan Municipal Risk Management Authority (MMRMA) –Bill Page (734)
Basics of OHSAS Occupational Health & Safety Management System
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Connecting to the Network Networking for Home and Small Businesses.
Travel Website Enhancement Project Project Update First Name Last Name.
Chapter 16 Designing Effective Output. E – 2 Before H000 Produce Hardware Investment Report HI000 Produce Hardware Investment Lines H100 Read Hardware.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
PRODUCT LOCATOR PresentedBy Richard Raehl November 13, 2001.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
Project Status Report Presenter Name Presentation Date.
El-Omari, Samir Hartline, Chris M. Hau, Jenny H. Huynh, Nhi T. Johnson, Rodger D. Kwan, Winnie W.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
Handbook of Informatics for Nurses and Healthcare Professionals Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Draft Transition Plan for the Transfer of the Drug Medi-Cal Treatment Program Fourth Series: Stakeholder Meetings Department of Health Care Services Department.
Request for Proposal (RFP)
Slide 1 PAO MO75 M. Hugon D:/DATA/POWERPNT/HNML. 0107kickoffconcertedaction ADvanced Options for P&T ADOPT Thematic Network kick-off Meeting.
Module 1: Introducing Windows Server 2003 Network Infrastructure Planning, Tools, and Documentation.
IT 499 Bachelor Capstone Week 3. Adgenda Administrative Review UNIT two UNIT threeProject UNIT four Preview Project Status Summary.
MOBILE NET INC. Ideas for Today and Tomorrow. INTRODUCTION Survey Le Presamtos, Inc. Network Infrastructure Document Current Hardware & Software Upgrade.
Networked Systems Survivability CERT ® Coordination Center Software Engineering Institute Carnegie Mellon University Pittsburgh, PA © 2002 Carnegie.
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Slide 1 CS 310 Ch5: Project management What do you think is involved? Proposal writing Project costing Project planning and scheduling Project monitoring.
Six Sigma Project Coding Performance Improvement Project Global Communication, Inc.
111 Media General Cable Year 2000 Project Chief Executive Officer Status Report Briefing.
Servelite - Complete IT Solutions. Servelite IT solutions specialize in providing Home solutions and Business solutions. We focus upon delivering quality.
CMGT 410 aid Education Begins/cmgt410aid.com
Project Management and Information Security
Instructional Technology Budget Proposal for
FY09 Tactical Plan Status Report for Site Networking
CMGT 410 Possible Is Everything/snaptutorial.com
CMGT 410 Education for Service-- snaptutorial.com.
NTC 320 Competitive Success-- snaptutorial.com
NTC 320Competitive Success/snaptutorial.com
CMGT 410 HOMEWORK Perfect Education/ cmgt410homework.com.
NTC 320 Education for Service-- snaptutorial.com
CMGT 410 Teaching Effectively-- snaptutorial.com.
NTC 320 Teaching Effectively-- snaptutorial.com
NTC 320 Education for Service-- snaptutorial.com
Unit 27: Network Operating Systems
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
IT OPERATIONS Session 7.
Presentation transcript:

Project Information

Contact Information

Project Being Developed

 Preliminary Project Needs  Vendor specific devices  Hardware specific devices  Software from the Purchasing Manual Instructions (PLTW website)  Annual License through PLTW  Star topology  Wired Infrastructure  Ethernet Technology  Vex Kits not Fischertechnik (FT) (PLTW, 2011)  Desk and chairs will need to be formed in the shape of a U  A cable plant consisting of Category 5 Cable will need to be placed in conduits  Room adjacent to computer/network room will need to be cleared to house Server Initial Project Specifications Continued on Next Slide

 Preliminary Project Goals  The initial project goals consisted of designing a LAN-WAN network that would meet or exceed the following list of needs created by Lodge Elementary School so that the school could implement a new technology-based curriculum. The following list is subject to change and is a early development list (but not limited to):  PLTW’s Specific Software Requirements  PLTW’s Vendor Specific Requirements  New network will support more than 140 users  Project will be tailored to meet the needs of all stakeholders involved.  Lodge schools (public) limiting purchase structure  Management for140 plus users accounts Continued Initial Project Specifications

 Project Specification Changes Since Original Needs Analysis and System Specifications Project  Planning (All the following completed)  Preliminary Investigation  Gathered Requirements  Site Visited  Site Report Produced  Needs Analysis Created  Project Participants Chosen  Joint Application Development Sessions Attended (2 thus far) Changes Since Initial Project Specifications Continued on the Following Slides

 Changes Since…. Continued  Design (All the Following Completed)  Created Preliminary Design Specs  Produced Design Specifications  Refined Needs Analysis and System Specs Changes Since Initial Project Specifications Continued on the Following Slides

 Implementation (delayed at this point due to limited purchasing structure)  Place Workstations  Place Switches and Routers  Run Category 5 Cable Changes Since Initial Project Specifications Continued on the Following Slides Even though this phase is on hold all the pre-required work has been completed and a new timeline reflecting the completed tasks, targeted milestones, remaining work, and new completion date, has also been created

Changes Since Initial Project Specifications Project Timeline Created Since….. The Implementation Phase is on delay so this timeline does not reflect the accurate progression of the project but it does show changes since……

Changes Since Initial Project Specifications New Timeline Reflecting New Implementation Phase Projection Not completed New Implementation Projection This new timeline does reflect the new projected Implementation Phase completion

 Electrician: $  Hardware:  35 Dell Vostro 260 Computers: $20,000  Cat 5 Cable: $  Cisco SR224GT Switches: $  HP MediaSmart EX495 Server: $  HP LaserJet P2055dn Printer: $  Software:  RobotC: $  Windows Server 2008 Licenses: $ Budget was Created Since …. Changes Since Initial Project Specifications Continued on Next Slide Only

 Labor:  Network Designer: $2,  Chief Technology Officer: $  Chief Communications Officer: $  Electrician: $  Subtotal $25,  Miscellaneous:  Contingency 15%: $  Grand Total $29, Changes Since Initial Project Specifications

Network Design was Created Since…. Network Design

Changes Since Initial Project Specifications Security Risk Assessment Matrix Security Risk Assessment Matrix was created since….

Changes Since Initial Project Specifications Key Individuals with Authority in Security Plan Key Project Participants were selected since….

 Security Policies  Privacy statements  Accountability statements  Authentication statements  Reporting violations.  Security Software  Windows Server 2008: Active Directory/Group Policies  Microsoft Security Essentials: Anti-virus protection for each workstation Changes Since Initial Project Specifications Security Policies and Items Security Policies and Items were created since…

 Security Hardware  Router:  Firewall  Network Address Translation  Other Security Measures  Access Control Lists (ACLs):  Restricts Websites that cannot be Accessed Changes Since Initial Project Specifications Security Policies and Items were created since…

Budget Impact The security costs will increase the proposed budget in that a Router and Windows Server 2008 software will be added to the already existing budget. This cost increase will most likely be covered in the 15% contingency cost already submitted in the proposed budget; however, if the contingency does not cover the additional cost then this will modify the already existing budget. Changes Since Initial Project Specifications Security Policies and Items were created since…

The following are the diagrams, personnel tables, and page screen shots that have been submitted throughout the presentation: Diagrams and Charts Network Diagram Project Timeline Risk Assessment Matrix Personnel Table Gantt Chart

Revised Timeline Remaining Deliverables Revised timeline with dates for remaining development and deliverables

The LAN-WAN network design for Lodge Elementary school has slightly changed since the original project needs and goals. This presentation documents those changes and includes: all contact information, description of the project being developed, original project needs and goals, changes that have taken place since the original needs analysis and system specifications, diagrams, personnel tables, page screen shots, and a revised timeline with dates for the remaining development and deliverables. All of this information collectively updates the System Specifications document used during the final phases of the project. The End