Prepared by the Coal Authority and presented to South Tyneside Council & Durham County Council 25 September 2012 Tyne & Wear Aquifer Protection Scheme.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Presented by Manuel Fernandez Environmental Engineer
Dinin Water Management Unit Action Plan NameDinin Water Management Unit Area300 km 2 River Basin DistrictSouth Eastern RBD Main CountiesKilkenny Protected.
Masterton District Council Homebush Wastewater Treatment Plant Neighbours Meeting 29 September 2014.
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
Sarah Evans (Senior EHO) & Angela Guy (Contaminated Land Officer)
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
The COAL AUTHORITY Management of Risks to Groundwater from Past Coal Mining Keith Parker Head of Estates and Environment The Coal Authority.
Further Site Investigation Sutton Walls Former Landfill
S53X Environmental Audit – 140 to 204 Western Avenue, Westmeadows VIC Anthony Lane Tullamarine Community Meeting, 12 March 2014.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
Carnell. IEMA, Ireland Regional Event Are SUDS the Answer for Drainage? Dublin, 12th Dec 2007 “Filter Drains as a SuDS System” presented by Andrew Todd,
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 1: Roles, Responsibility and Legislation Muckno Mill Lough.
LEQ: How does water move through underground layers of soil and rock?
Earth: The Water Planet What percent of the water on Earth is good enough to drink?
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 3: The Local Authority - What’s happening? Castle Lake,
Presented by Ralf Topper, CPG 30 th Colorado Water Workshop July 28, 2005.
Where is the WATER? By: Chelsy Bird & Kayla Melfi.
COastal REsearch & POlicy INTegration Working Together for Coastal Planning around the Severn Estuary Dr Tim Stojanovic, Cardiff University/COREPOINT project.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
WATER POLLUTION AND WATER QUALITY I EU LAW; OVERVIEW; WATER INDUSTRY ACT 1991; WATER SUPPLY (WATER QUALITY) REGULATIONS 2000; WATER RESOURCES ACT 1991.
The phased approach to the groundwater monitoring programme for the Drini River Basin.
Table 3 SWMI – Water Matters –Topics – 1Dangerous Substances 2Forestry 3Septic Tanks (Unsewered Properties) Shannon International River Basin District.
Surface Water and Groundwater Fusion Text: Pages
Former Monsanto Chemical Tip Wrexham County Borough Council.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
NATO-CCMS Pilot Study Tour de Table - Greece Recent Developments on Contaminated Land in Greece Anthimos Xenidis Laboratory of Metallurgy National Technical.
Landfill acceptance criteria: justification and background Heijo Scharff FEAD Workshop Implementation of the Landfill Directive Budapest, Hungary, 11 May.
Bathing Water Update – March 15 Sarah Jenner Bathing Water Manager.
Thames Valley/Matatoki Water Supplies October 2012.
Onshore oil and gas: environmental regulation and the consenting process UKELA Seminar 23 September 2015.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
PREESALL UNDERGROUND NATURAL GAS STORAGE FACILITY.
Crisis in Shrewsbury Flooding impacts and risk management.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
1 INTEGRATED WATER RESOURCES MANAGEMENT STRATEGY IN GHANA Water Resources Commission.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
Review of wastewater discharge alternatives – past and present Slide presentation prepared by Stan Mills for Regular Commissioners’ Meeting of December.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Water Framework Directive An Introduction David Whiles Anglian River Basin Manager.
Environment Agency Regulation and support for business Richard Penn Environment Planning and Engagement Manager.
Core Strategy Dublin City Development Plan
17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.
Groundwater Basics. Water Cycle What is Groundwater? Groundwater is simply water that exists below the earth's surface. Groundwater is often thought.
Hydro One Community Liaison Committee Minister’s Conditions Meeting #2 August 19, 2014 Solina Hall.
Llwyneinion Acid Tar Lagoon
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Chapter 7.2 (cont.) Groundwater as precipitation hits the ground, it may either (a) soak into the ground (infiltration) or this water has two alternatives:
An Overview of Coastal Management Issues Overview and Scrutiny Co-ordinating and Call-in Committee, 10 March Andrew Wainwright, Environmental Health.
CALIFORNIA WATER ISSUES Survey of Wine Institute Advocacy Efforts Wine Institute Board of Directors Meeting – March 8, 2016 Tim Schmelzer, Director of.
Coastal Aquifer Management in the Caribbean Workshop 14 th -16 th December 2011 The Water Resource Management Agency Ministry of Sustainable Development,
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
NGR: Postcode: © Crown Copyright All rights reserved. Image reproduced with permission of Ordnance Survey and Ordnance Survey of Northern Ireland.
Water Underground Chapter 11 section 3. How does water move underground? Like surface water, underground water generally comes from precipitation. Water.
Nwlpp Northumbrian Water Limited 9 October nwlpp Flooding - water company perspective Geoff Hartis Sewerage Operations Manager.
Identification on Significant Pressures - Surface Water Bodies
Water and the Atmosphere - Chapter 1 Lesson 3
Tony Almond Onshore Oil and Gas Policy Health and Safety Executive
Test Slant Well Project Permit Amendment (Coastal Commission Agenda Item Tu 15a) Date: Oct. 6, 2015 Presented by CAW at the Oct. 6, 2015, California Coastal.
Water Reclamation Plant Feasibility Study Update May 28, 2014
FIELD LEVEL CHALLENGES FOR SOLAR PARKS IN INDIA
The Hydrologic Cycle Condensation Advection Evaporation
Human Activity and Ground Water
Human Activity and Ground Water
Groundwater area protection plans in water management
Comprehensive Land Use Planning and Zoning
Presentation transcript:

Prepared by the Coal Authority and presented to South Tyneside Council & Durham County Council 25 September 2012 Tyne & Wear Aquifer Protection Scheme

Context - Aquifers Aquifer – an underground layer of water-bearing, permeable rock or drift deposits from which groundwater can be extracted An aquifer is filled by rain or melted snow that drains into the ground from the surface and acts as a reservoir for groundwater. Wells drilled into the aquifer allow this groundwater to be pumped out for drinking, agriculture and industrial uses. The Environment Agency aims to protect groundwater and coastal waters from pollution by controlling discharge of certain substances, such as mine water.

Context – Drinking Water Northumbrian Water Ltd are licensed to abstract ground water from a number of boreholes drilled into the aquifer beneath the study area. NWL pumping station abstracts enough drinking water to supply ~30,000 residents in the Sunderland area. Fulwell GWS Extent of Aquifer

Deep Coastal Mine Shaft Abstraction of Ground Water Limestone Aquifer Carboniferous Coal Measures North Sea Context – Rising Mine Water Impact on Aquifer Rising mine water Polluting mine water

The resultant ochreous mine water has a distinctive orange colour and can cause unwanted pollution to receiving waters. The mine water within the workings is very saline – as salty as sea water. Context – Mine water

Context - Mine Water Monitoring The Coal Authority predicts that mine water levels could reach sea level in Jan 2018, at which point the overlying aquifer will be at risk of pollution from the saline and ochreous mine water. 6

Site Identification The Coal Authority’s aim is to start pumping out the mine water at a rate that will stop the rise in mine water at a ‘control level’ below the base of the aquifer. Access into the mine workings for pumping is best achieved at or close to former colliery shafts Three former colliery sites have been identified where good connectivity to the mine workings is feasible. Westoe Whitburn Wearmouth Inland extent of Mining Block

Previous Investigations Small scale pumping trial at Westoe Colliery Crown Shaft Key findings: Max. allowable abstraction rate had no impact on mine water levels. A second, larger scale trial was subsequently proposed Larger scale pumping trial was carried out over 3-month period from a new borehole drilled into the old Whitburn Colliery workings. Key findings: At an abstraction rate of 10l/s, the mine water levels: dropped at Whitburn held steady at Westoe slowed to half original rate at Wearmouth and Boldon. The mine water chemistry was established No ochreous staining was observed beyond 10m from discharge point.

9 Previous Investigations OUTCOME Hydrogeological findings from these trials led to the confirmation of three sites where abstraction could potentially control mine water levels across the mining block: Westoe Colliery Crown Shaft Whitburn - Coastal Park Wearmouth - Stadium of Light

Site Assessment As part of the Coal Authority’s Feasibility Study, meetings and discussions have been held with key stakeholders to review options and proposals. Consultees:South Tyneside Council Sunderland City Council Environment Agency Natural England National Trust Northumbrian Water A comparative site assessment has been compiled, addressing the key feasibility issues relevant to development of this scheme

Westoe Colliery Crown Shaft 11 Trow Quarry Trow Lea Gypsies Green Recreation Ground Trow Point Westoe Crown Village Westoe Crown Shaft & Compound WESTOE Graham’s Sand Sandhaven Beach Coast Road A183 The Leas Directionally-drilled gravity sea outfall Pumping main Site rejected because: Access shaft located within new residential development Long-term shaft maintenance required Long pumping main required to reach sea outfall Discharge adjacent to popular bathing beach Significant impact on high amenity area anticipated if future treatment is required The Site The Proposed Works

Wearmouth - Stadium of Light 12 Keir Hardy Way Wear Estuary Stadium of Light Steep bank Aquatic Centre Restricted access to mine water via existing capped shafts Site rejected because: Very deep borehole required close to high amenity sites Outfall construction difficult Discharge into tidal estuary – poor dispersion All suitable adjacent land identified in UDP – no land if future treatment is required New borehole and Headworks Directionally-drilled gravity estuary outfall Diffuser The Site The Proposed Works

Whitburn Coastal Park 13 The Wherry Souter Lighthouse Mill Lane A183 Whitburn Coastal Park Coastal Path New Headworks at existing borehole Gravity discharge pipe in trench Directionally-drilled gravity sea outfall Diffuser Site selected because: Existing borehole proven to control mine water levels the across mining block Pump Test results give high confidence of scheme success Sampling test results showed minimal impact on coastal environment Outfall sufficiently remote from bathing beaches Good mine water dispersion predicted in vigorous sea conditions Site suitably distant from residential properties Suitable adjacent land if future treatment is required The Site The Proposed Works

Regulation The proposed discharge of mine water to the sea will require the Coal Authority to apply for a Permit to Discharge from the Environment Agency The EA will consult with a range of environmental organisations before making a decision on approval of the application.

Preferred Solution Extended pump test at Whitburn Coastal Park Pumped abstraction of mine water from existing borehole and gravity discharge to sea via new outfall off The Wherry. It is anticipated that discharge of the untreated mine water will be initiated at 10l/s with levels across the mining block being continuously monitored over a 12 month period Regular sampling and testing of the mine water and the receiving coastal waters will be implemented to check compliance.

Preliminary Project Programme October 2012 to July Surveys, negotiations and applications for Licenses, Approvals and Permits October 2012 to December Concept and Detailed Design February 2014 to December Construction January 2015 to December Monitoring and Sampling/Testing July 2015 to December Data review and additional design work if required.

Questions are invited